Design and construct

# The design is only one part of your liability

A project can carry responsibilities you never drafted, promises your insurance may not meet, and claims that emerge years after completion. Understanding how these risks connect matters as much as choosing your PI limit.

Explore the guidance[Discuss a contract or PI concern](https://hpic-production.up.railway.app/contact.md)

Where a contract promises more than the policy insures, the gap is yours.

## What the diagram means

**Promised** means an obligation you accept in writing, in a building contract, an appointment, a collateral warranty or a letter of reliance. It covers what you agree to do and the standard you agree to meet. **Insured** means a liability your PI policy is written to respond to, subject to its terms, limit and exclusions.

### Promised, not insured

You have accepted an obligation that goes further than the policy covers. If it is breached, the cost may fall on your own business.

Illustrative exampleYour contract says the finished building will be fit for its purpose. It falls short of the stated requirement even though your design was competent. The client can claim under the contract, but a policy written around negligence may not respond.

Other promises that commonly sit here: a guarantee of a result, a stated design life or performance figure, liquidated damages, and an indemnity wider than your legal liability.

### Promised and insured

The obligation in the contract matches what the policy covers.

Illustrative exampleYou agree to design with reasonable skill and care. A calculation error leads to remedial work and the client claims. This is the kind of liability PI is written for, subject to the policy terms, limit and excess.

### Insured, not promised

Cover you hold that this contract does not call on. It is not wasted. It protects your other work and other duties.

Illustrative exampleYour policy has a £5 million limit and covers all the services you have declared. This appointment asks for £2 million and uses only some of those services. The rest of the cover is there for your other projects, and for duties you may owe outside the contract, subject to the policy terms.

[When your contract promises more than your PI covers](https://hpic-production.up.railway.app/design-and-construct/contractual-liability.md)

Last reviewed 11 November 2026 by Numan, Director, Hammond PI.

## The five checks behind every appointment

Choose a check to see what it covers and where to read more.

### What work have we actually agreed to undertake?

Contractual design responsibility depends on the documents you agreed, not on whose name is on an earlier drawing. Statutory duties may also apply. Map what you agreed to develop, complete, check or coordinate, and who owns each interface.

[Who is responsible for the design?](https://hpic-production.up.railway.app/design-and-construct/design-responsibility.md)

## A £5 million policy does not necessarily mean £5 million of protection for every exposure

A professional indemnity policy is only one part of the picture. The contract sets the responsibilities you take on. The policy decides which liabilities may be insured. Your arrangements with consultants and subcontractors decide whether a loss can be recovered from others.

These do not automatically line up. A contractor may stay responsible to its employer for a specialist's design. A consultant may have limited its liability to a multiple of its fee. A certificate may show a large limit while excluding or restricting the very work concerned. The result can be an exposure nobody noticed when the contract was signed.

Our starting point is understanding those relationships, not comparing headline premiums.

## Four areas worth understanding

[### Who actually owns the design?

Responsibility is not always decided by who drew it first. Contractor designed portions, coordination duties, changes and novation all move it.

Explore design responsibility](https://hpic-production.up.railway.app/design-and-construct/design-responsibility.md)[### What has your contract promised?

Reasonable skill and care is very different from guaranteeing a result, and the difference matters to your PI.

Understand contractual liability](https://hpic-production.up.railway.app/design-and-construct/contractual-liability.md)[### How much protection is really available?

A certificate is a starting point. Activities, exclusions, limit basis, excess and recovery rights matter as much.

Check consultant PI](https://hpic-production.up.railway.app/design-and-construct/checking-consultant-pi.md)[### What happens when a concern arises?

Your first response can shape how a claim develops. When to refer, what to keep and why early notice matters.

Understand claims and notification](https://hpic-production.up.railway.app/design-and-construct/construction-pi-claims.md)[### Was it the specification or the installation?

A case study: how three PI wordings treat a firm that both specifies a product and installs it.

Watch the explainer and read the case study](https://hpic-production.up.railway.app/design-and-construct/specification-or-installation.md)

[From Insights: wording review

### Six fire safety exclusions, six different gaps

We compared fire and cladding exclusions from six PI insurers. Some focus on specified materials or external wall systems; others extend to a broad range of fire safety allegations. See what the differences mean for designers.

Read the comparison](https://hpic-production.up.railway.app/insights/fire-safety-exclusions.md)

## Three examples that change the conversation

Illustrative scenario

### The design was right. The installation was wrong.

A waterproofing detail is properly designed but installed badly. The damage may be a workmanship or materials issue rather than negligent design. If the detail itself was unsuitable, or both contributed, the position changes. The question is not whether there is a defect but what caused it, who was responsible and which insurance may respond.

Illustrative scenario

### £2 million aggregate. Only £400,000 left.

A consultant holds £2 million of PI in the aggregate. Earlier claims in the same period have already used £1.6 million. With no reinstatement, only £400,000 remains for everyone else. A certificate alone may not show how much aggregate limit remains available.

Illustrative scenario

### The consultant is insured. But can you recover?

A contractor takes on wide design responsibility to its employer. The specialist's appointment carries a liability cap and a net contribution clause. Even where negligence is proved, the contractor's recovery may be restricted, while its own obligations to the employer do not shrink to match.

[Interactive

### The liability gap explained

A fee based cap of £1.5 million against a £1 million policy leaves a potential £500,000 difference. Change the figures yourself.

Try the liability gap](https://hpic-production.up.railway.app/design-and-construct/contractual-liability.md)

## We look at the exposure behind the policy

Two businesses can describe their work the same way and carry very different exposures. We consider the services you provide, the contractual responsibilities you accept, the consequences of an error and the protection insurers will actually offer.

Where a contract and the insurance do not line up, we identify the insurance implications and explore the underwriting options available. Where legal interpretation or drafting is needed, legal advice remains essential. The aim is informed decisions before they become claims.

## Glossary

Search the glossary

Reasonable skill and care

The professional standard of care and competence that applies to the service. PI is written around it. [Read: Contractual liability](https://hpic-production.up.railway.app/design-and-construct/contractual-liability.md)

Fitness for purpose

A contractual obligation that can require a defined outcome beyond reasonable care. [Read: Contractual liability](https://hpic-production.up.railway.app/design-and-construct/contractual-liability.md)

Contractual liability cap

An agreed limit on legal liability, subject to its wording and enforceability. Separate from the PI limit. [Read: Contractual liability](https://hpic-production.up.railway.app/design-and-construct/contractual-liability.md)

Net contribution clause

A provision that may restrict a party's liability to its fair share of responsibility. [Read: Contractual liability](https://hpic-production.up.railway.app/design-and-construct/contractual-liability.md)

Collateral warranty

An agreement giving named third parties, such as funders, purchasers or tenants, direct contractual rights. [Read: Contractual liability](https://hpic-production.up.railway.app/design-and-construct/contractual-liability.md)

Novation

Substituting one contracting party for another, commonly moving a consultant from employer to contractor, subject to the agreement. [Read: Design responsibility](https://hpic-production.up.railway.app/design-and-construct/design-responsibility.md)

Contractor designed portion

Design work allocated to the contractor under the project documents. [Read: Design responsibility](https://hpic-production.up.railway.app/design-and-construct/design-responsibility.md)

Principal Designer

Two separate statutory roles: under CDM 2015 for health and safety, and under the Building Regulations in England for compliance of design work. [Read: Design responsibility](https://hpic-production.up.railway.app/design-and-construct/design-responsibility.md)

Any one claim

An insurance limit applying to each claim, subject to aggregation rules and policy restrictions. [Read: Consultant PI](https://hpic-production.up.railway.app/design-and-construct/checking-consultant-pi.md)

Aggregate limit

A shared maximum for covered claims over a defined period, potentially across all of the insured's clients. [Read: Consultant PI](https://hpic-production.up.railway.app/design-and-construct/checking-consultant-pi.md)

Defence costs

Legal and related costs of defending a claim. Depending on the policy they sit inside the limit (costs inclusive) or are paid on top (costs in addition). [Read: Consultant PI](https://hpic-production.up.railway.app/design-and-construct/checking-consultant-pi.md)

Sublimit

A lower limit within the main limit for a particular risk, such as fire safety. [Read: Fire safety exclusions](https://hpic-production.up.railway.app/insights/fire-safety-exclusions.md)

Retroactive date

A policy date before which professional work is not covered. Moving it forward, or losing prior acts protection when changing insurer, can restrict cover for earlier work. [Read: Consultant PI](https://hpic-production.up.railway.app/design-and-construct/checking-consultant-pi.md)

Claims made

The basis that links cover to when claims are made, or qualifying circumstances notified, under the wording. [Read: Claims and notification](https://hpic-production.up.railway.app/design-and-construct/construction-pi-claims.md)

Run-off cover

Continuing PI for past professional work after a business closes or stops that work. [Read: Claims and notification](https://hpic-production.up.railway.app/design-and-construct/construction-pi-claims.md)

Notification of circumstances

Notifying a qualifying circumstance in line with the policy, so that a later related claim may fall within that policy, subject to its wording. [Read: Claims and notification](https://hpic-production.up.railway.app/design-and-construct/construction-pi-claims.md)

Contractual recovery

The rights available to recover a loss from another responsible party under the contracts and the law. [Read: Contractual liability](https://hpic-production.up.railway.app/design-and-construct/contractual-liability.md)

Fair presentation

The duty under the Insurance Act 2015 to disclose material information, including known circumstances, when buying or renewing cover. [Read: Claims and notification](https://hpic-production.up.railway.app/design-and-construct/construction-pi-claims.md)

This guidance is provided for general information and does not constitute legal advice or confirmation of insurance cover. Cover is subject to the terms, conditions and exclusions of the relevant policy. Contractual obligations should be considered with appropriate professional advice.

## Have a contract or PI concern?

Talk to us about your professional activities, insurance requirements or a contractual obligation you would like to understand.

[Speak to Hammond PI](https://hpic-production.up.railway.app/contact.md)[Get a PI quote](https://hpic-production.up.railway.app/quote.md)