Insights for architects

# Thirty years of housing liability: the Defective Premises Act and your PI

If you have designed homes in England or Wales, the Building Safety Act 2022 lengthened your liability for them, in some cases to 30 years from completion. Your PI is bought one year at a time. This is how the two fit together.

The dutyWhat changedThe 2025 rulingYour coverRecordsWhat to do

Guidance only. Cover depends on your own policy wording; speak to us about your position.

## What the Act asks of an architect

Section 1 of the Defective Premises Act 1972 applies to anyone who takes on work for or in connection with the provision of a dwelling, whether by building, conversion or enlargement. They must see that the work is done in a workmanlike or professional manner, with proper materials, so that the dwelling will be fit for habitation when completed ([Defective Premises Act 1972](https://www.legislation.gov.uk/ukpga/1972/35)).

Three features make this different from your appointment.

-   **Who can claim.** The duty is owed to the person who ordered the dwelling and to every person who later acquires an interest in it.
-   **No contracting out.** Section 6(3) makes void any term that excludes or restricts liability under the Act.
-   **Any dwelling.** The duty is not confined to tall buildings or to fire safety. In _Vainker v Marbank_ an architect was held liable under the Act over a glazing defect on a private house ([\[2024\] EWHC 667 (TCC)](https://caselaw.nationalarchives.gov.uk/ewhc/tcc/2024/667)).

## What changed on 28 June 2022

Before the Building Safety Act, a section 1 claim had to be brought within six years. Section 135 of that Act, in force from 28 June 2022, put a new section 4B into the Limitation Act 1980 for England and Wales ([Building Safety Act 2022, section 135](https://www.legislation.gov.uk/ukpga/2022/30/section/135); [Limitation Act 1980, section 4B](https://www.legislation.gov.uk/ukpga/1980/58/section/4B)).

Limitation periods an architect now works with

Claim

Period

Runs from

Section 1, where the right arose before 28 June 2022

30 years

Completion of the dwelling

Section 1, where the right arises on or after that date

15 years

Completion of the dwelling

Section 2A: business work on an existing building containing a dwelling

15 years

Completion of the work

Breach of the appointment ([section 5](https://www.legislation.gov.uk/ukpga/1980/58/section/5); [section 8](https://www.legislation.gov.uk/ukpga/1980/58/section/8))

6 years, or 12 if signed as a deed

The breach

Negligence, the overriding time limit ([section 14B](https://www.legislation.gov.uk/ukpga/1980/58/section/14B))

15 years

The act or omission complained of

Section 2A is new, and takes the duty beyond new homes to work on existing residential buildings. There are two safeguards. A court must dismiss a claim brought under the 30 year period if that is necessary to avoid a breach of the defendant’s Convention rights, and claims settled or finally decided before 28 June 2022 cannot be reopened.

## What the Supreme Court added in 2025

On 21 May 2025 the Supreme Court gave judgment in _URS Corporation v BDW Trading_ ([\[2025\] UKSC 21](https://caselaw.nationalarchives.gov.uk/uksc/2025/21)). The designer was a structural engineer. A developer had found design defects in blocks it no longer owned, repaired them at its own cost and then claimed against the designer. No owner had claimed against the developer. The court held ([press summary](https://caselaw.nationalarchives.gov.uk/uksc/2025/21/press-summary)):

-   The 30 year period applies not only to claims brought under section 1, but also to negligence and contribution claims that depend on it.
-   A designer can owe the section 1 duty to the developer who ordered the work.
-   A party that has paid for repairs can claim a contribution from another party liable for the same damage, without first having a judgment or settlement against it.

So the letter may come from a developer or contractor that has already paid for remedial work.

A new company may not leave old projects behind either. Where it is just and equitable, the High Court can make a company’s liability under the Act a liability of its associated companies too, even if the original company has been dissolved ([Building Safety Act 2022, section 130](https://www.legislation.gov.uk/ukpga/2022/30/section/130)).

## Why this matters to a claims made policy

PI is written on a claims made basis. ARB’s guidance gives the example: a claim brought in 2023 for work carried out in 2019 falls to the 2023 policy ([ARB, PII guidance](https://arb.org.uk/wp-content/uploads/Guidance-document-Professional-Indemnity-Insurance.pdf)). So a home you designed long ago is insured, if at all, on the terms you hold in the year the claim arrives.

-   **Retroactive date.** If your policy has one, work before it is not usually covered.
-   **Earlier practices.** Work done under a former partnership or company usually needs that predecessor to be named.
-   **Today’s restrictions.** A restriction added at this renewal applies to claims made now, whenever the building was designed. [Fire safety exclusions](https://www.hammondpi.com/insights/fire-safety-exclusions.md)
-   **The limit.** A term in your appointment that restricts liability under the Act is void, so the claim may be for the whole loss.
-   **Run off.** ARB’s minimum is six years, and its guidance names deeds and Defective Premises Act claims as liabilities that outlast it. [Run off cover explained](https://www.hammondpi.com/insights/run-off-cover.md)

## Records and old notifications

A claim made twenty years after completion is defended on paper. The people who ran the job may have left, and the contractor may no longer exist. Keep the appointment, the drawings and specification as issued, the inspection records and any note of what the contractor changed, for as long as the liability can last.

Keep your insurance records for as long. A circumstance validly notified to an earlier insurer may attach a later claim to that policy year, on that year’s terms. Insurers commonly ask for 15 years of external cladding history, so we would ask for every past schedule, proposal form and notification ([ARB, PII renewal advice](https://arb.org.uk/architect-information/professional-indemnity-insurance/pii-renewal-advice/)).

## What to do now

1.  List every project that created, converted or enlarged a dwelling, with its completion date, and add work since June 2022 on existing residential buildings.
2.  Check your retroactive date and that every earlier practice is named.
3.  Read each restriction in your policy against that list, not only against current work.
4.  Review the limit against the cost of putting right a whole building, not your share of it.
5.  If you plan to close or retire, plan run off for longer than six years where housing is involved.
6.  Tell us at once about an intrusive survey, a request for old drawings or a letter about a past building. We would notify it for you.

## Housing work in your past projects?

Send us your project list and current policy, and we will show you where thirty years of liability meets this year’s cover.

[Speak to a PI specialist](https://www.hammondpi.com/contact.md)[PI for architects](https://www.hammondpi.com/who-we-cover/architects.md)

Related: [PI for architects](https://www.hammondpi.com/who-we-cover/architects.md) · [Run off cover](https://www.hammondpi.com/insights/run-off-cover.md) · [Fire safety exclusions](https://www.hammondpi.com/insights/fire-safety-exclusions.md)