---
title: "PI requirements for M&E and building services engineers"
description: "CIBSE, the IET and IMechE set no minimum PI limit. Your appointments and warranties do. What they demand, for how long, and where consultancies get caught."
url: "https://www.hammondpi.com/insights/building-services-engineers-pi-requirements/"
updated: "2026-11-20T06:10:05.626Z"
---

[Home](https://www.hammondpi.com/index.md) / [Insights](https://www.hammondpi.com/insights.md) / Who requires M&E engineers to hold PI, and what a compliant policy needs

Insights for building services engineers

# Who requires M&E engineers to hold PI, and what a compliant policy needs

No engineering institution will tell you what limit to buy. The real requirement is written into your appointments, warranties and client frameworks, one project at a time. This is what those documents usually demand, and where consultancies get caught.

Institution rulesContract termsHow longA compliant policyWhere firms slipWhat to do

Guidance only. Cover depends on your own policy wording; speak to us about your position.

## What the institutions actually require

Building services engineers are not regulated the way solicitors or architects are. The professional rules on insurance sit in the institutions’ codes of conduct, and they are short.

What each engineering body says about professional indemnity insurance

Body

What its code says

As at

CIBSE

Assess your relevant liabilities and, if appropriate, hold PI. Tell clients whether you hold it, and tell them if you cease to ([CIBSE, Code of Professional Conduct](https://www.cibse.org/codeofconduct)).

Code in force from 1 January 2025

IET

Assess all relevant liability for work done by you or under your supervision and, if appropriate, hold PI ([IET, Rules of Conduct](https://www.theiet.org/media/vj0bwbsv/rules-of-conduct-jun-2024.pdf)).

Rules effective from 29 July 2024

IMechE

Maintain adequate PI, through your employer or personally ([IMechE, Code of Conduct explained](https://imeche.org/about-us/imeche-governance/governance-and-finance-reviews/code-of-conduct-explained)).

As published in November 2026

ACE member firms

Maintain appropriate PI arrangements ([ACE, Code of Business Practice](https://www.acenet.co.uk/media/v5in4ybl/ace-code-of-business-practice-2021-update.pdf)).

Last amended December 2021

Engineering Council

Its guidance asks each institution’s code to oblige members to assess liability and, if appropriate, insure ([Engineering Council, guidance for codes of conduct](https://www.engc.org.uk/resources-and-guidance/guidance-for-the-profession/ethical-principles/guidance-for-pei-codes-of-conduct/)).

Revision 2017/1

None of them states a limit, an excess, a run off period or a list of approved insurers. “If appropriate” and “adequate” are left to you to judge.

## Where the real requirement comes from

The figure comes from the insurance clause in each appointment, collateral warranty and framework agreement. Read a few side by side and the same five parts tend to appear.

-   **A limit.** A stated sum, and whether it applies to any one claim or in the aggregate for the year.
-   **A period.** Cover to be maintained for six or twelve years after completion.
-   **An availability test.** Often, the duty applies only while cover is available in the market on commercially reasonable terms.
-   **A duty to tell.** You must tell the client if cover cannot be kept on the agreed terms, and produce evidence of it on request.
-   **Limits on exclusions.** Some clients ask for cover without fire safety, pollution or asbestos restrictions, or with stated minimum sub-limits.

Every one of these is a promise you make. Your insurer has not given it, and a PI policy lasts one year. A twelve year insurance clause commits you to a dozen renewals in a market you cannot predict.

## Why the period is six, twelve, fifteen or thirty years

The periods in those clauses follow the time limits for bringing a claim. An action on a simple contract must be brought within six years of the date the cause of action arose ([Limitation Act 1980, section 5](https://www.legislation.gov.uk/ukpga/1980/58/section/5)). Where the appointment or warranty is signed as a deed, the period is twelve years ([Limitation Act 1980, section 8](https://www.legislation.gov.uk/ukpga/1980/58/section/8)). That is why clients ask for deeds.

Homes take it further. Work for a new dwelling carries a duty under the Defective Premises Act, and claims can be brought for 15 years, or 30 where the right arose before 28 June 2022 ([Building Safety Act 2022, section 135](https://www.legislation.gov.uk/ukpga/2022/30/section/135)).

PI is written on a claims made basis. The policy that responds is the one in force when the claim is made and notified. It is not the one you held when you issued the design. So the real requirement is to keep buying suitable cover for as long as claims can arrive, and to arrange run off when you stop. [Run off cover explained](https://www.hammondpi.com/insights/run-off-cover.md)

## What a policy needs to meet your contracts

No institution publishes a minimum wording, so “compliant” means compliant with what you have signed. These are the points we check a policy against.

-   **Limit basis.** If your contracts promise a limit for each and every claim, an aggregate limit, or an aggregate sub-limit for one type of claim, may not match.
-   **Fire safety terms.** In the Construction Leadership Council’s 2022 survey, 68% of respondents had restrictions on fire safety cover ([CIC, survey results](https://www.cic.org.uk/news/pi-insurance-restrictions-continue-to-harm-industry)). Smoke control, dampers and fire stopping are everyday building services work, so the exact words matter. [Fire safety exclusions](https://www.hammondpi.com/insights/fire-safety-exclusions.md)
-   **Business description.** Principal designer roles, energy assessment, commissioning management and expert reports are covered only if the description includes them.
-   **Warranties.** Many wordings cover a collateral warranty only if it gives no greater or longer benefit than your appointment.
-   **Retroactive date.** It should reach back to your earliest work, including work done by a predecessor firm.

## Where consultancies get caught

-   **The one off higher limit.** A client requires more than you hold, and the appointment is signed anyway. You may be in breach from day one, whether or not a claim ever comes.
-   **Each claim promised, aggregate bought.** One large claim can use up an aggregate limit that several contracts each assume is theirs.
-   **A restriction arrives at renewal.** Contracts signed years ago may promise cover the market no longer gives. Many require you to tell the client, and CIBSE’s code requires members to tell clients if they cease to hold cover.
-   **Limits set project by project.** Each client fixes a figure without sight of your whole workload. Nobody but you adds them up.
-   **Restructuring.** Warranties signed by an old firm do not move to a new company by themselves, and the new policy must still reach the old work.

## How to set the limit and keep the promise

1.  Keep a register of the insurance clause in every live appointment and warranty: limit, basis, period, permitted exclusions and duty to tell.
2.  Size the limit to your largest realistic loss, such as stripping out and replacing services in an occupied building or moving residents out. Do not size it to the smallest figure a client will accept.
3.  Send us a new insurance clause before you sign it. We read it against your wording and say where it asks for more than you hold. [Contract reviews](https://www.hammondpi.com/contract-reviews.md)
4.  At each renewal, compare the terms offered with what your contracts promise, before you accept them.
5.  Plan run off well before you sell, merge or close.

## Do your contracts and your policy match?

Send us your schedule, wording and a typical insurance clause, and we will tell you where they differ.

[Speak to a PI specialist](https://www.hammondpi.com/contact.md)[PI for building services engineers](https://www.hammondpi.com/who-we-cover/building-services-engineers.md)

Related: [PI for building services engineers](https://www.hammondpi.com/who-we-cover/building-services-engineers.md) · [Run off cover](https://www.hammondpi.com/insights/run-off-cover.md) · [Fire safety exclusions](https://www.hammondpi.com/insights/fire-safety-exclusions.md)
