title: "Biodiversity net gain 2026 changes and consultants’ PI"
description: "The 0.2 hectare exemption, the end of the self-build exemption and BNG for major infrastructure: what the 2026 changes mean for ecologists’ PI cover."
url: "https://www.hammondpi.com/insights/environmental-consultants-biodiversity-net-gain-changes/"
updated: "2026-11-20T06:10:05.283Z"
---

[Home](https://www.hammondpi.com/index.md) / [Insights](https://www.hammondpi.com/insights.md) / Biodiversity net gain after the 2026 changes: what it means for your PI

Insights for environmental consultants

# Biodiversity net gain after the 2026 changes: what it means for your PI

Biodiversity net gain changed twice in 2026. Small sites dropped out in August and nationally significant infrastructure came in from November. Each change moves the risk an ecological consultancy carries, and the questions its PI policy has to answer.

What changedExemption adviceThe metricThirty yearsYour roleTelling insurers

Guidance only. Cover depends on your own policy wording; speak to us about your position.

## What changed in 2026

Biodiversity net gain has been mandatory in England since 12 February 2024. Developers must deliver a gain of at least 10%, measured with the statutory biodiversity metric, and must maintain the habitats they create or enhance for a minimum of 30 years ([GOV.UK, understanding biodiversity net gain](https://www.gov.uk/guidance/understanding-biodiversity-net-gain)). In 2026 the edges of the regime moved:

-   From 6 August 2026 a development is exempt if the site area within the red line boundary is 0.2 hectares or below.
-   From the same date a wholly temporary development, with permission for five years or less, is exempt.
-   The self-build and custom build exemption no longer applies to new applications made on or after 6 August 2026.
-   Biodiversity net gain applies to nationally significant infrastructure projects with applications submitted on or after 2 November 2026, under rules that differ from those for planning permission.

Sources: [GOV.UK, exempt developments](https://www.gov.uk/guidance/biodiversity-net-gain-exempt-developments) and [GOV.UK, the statutory metric](https://www.gov.uk/guidance/biodiversity-metric-calculate-the-biodiversity-net-gain-of-a-project-or-development). For a consultancy this may mean fewer calculations on very small sites, more exemption advice, and a new class of large instructions.

## An exemption letter is advice too

Telling a client that its scheme is exempt is a professional opinion, often given quickly and for a small fee. The exemptions have conditions. The 0.2 hectare exemption, the temporary development exemption and the de minimis exemption do not apply if the development impacts priority habitat on site. De minimis is itself narrow: less than 25 square metres of on-site habitat, or less than five metres of linear habitat such as hedgerow ([GOV.UK, exempt developments](https://www.gov.uk/guidance/biodiversity-net-gain-exempt-developments)).

So somebody has to decide what habitat is there. If that judgement is made from a desk, and the planning authority later disagrees, the client may face a late metric, a redesign, the purchase of units and delay. Record the red line and site area you were given, whether you visited, the season, and what you could not see.

## Who stands behind the metric

The guidance says a developer should hire a competent person such as an ecologist to use the metric tool, and that a planning authority may reject a calculation it does not believe was completed by a competent person. The small sites metric is the exception. A qualifying development does not need an ecologist, but that metric cannot be used where priority habitats, protected sites or European protected species are present ([GOV.UK, the statutory metric](https://www.gov.uk/guidance/biodiversity-metric-calculate-the-biodiversity-net-gain-of-a-project-or-development)).

Metric claims have a pattern. The error is usually in the baseline: a habitat type or condition is misjudged, the gain needed is understated, and the client budgets for too few units. It surfaces late, when putting it right costs most. One assessor’s habit can also repeat across many schemes. Then the aggregation clause matters, because claims from one originating cause may be treated as one claim with one limit, depending on the words.

## Thirty years is longer than any policy

Off-site gains must be secured by a legal agreement, and significant on-site gains by a legal agreement or a planning condition. The agreement is a planning obligation under section 106 with the planning authority, or a conservation covenant with a responsible body, and it must last for at least 30 years. If the gains are not maintained, enforcement action may follow ([GOV.UK, legal agreements for biodiversity net gain](https://www.gov.uk/guidance/legal-agreements-to-secure-your-biodiversity-net-gain)). The guidance says a habitat management and monitoring plan should be written with an ecologist or competent professional, and should cover when and how habitats will be monitored and the results reported ([GOV.UK, habitat management and monitoring plans](https://www.gov.uk/guidance/creating-a-habitat-management-and-monitoring-plan-for-biodiversity-net-gain)).

PI is written on a claims made basis and renewed a year at a time. A plan you write this year may be tested in its tenth or twentieth year, and the policy that answers is the one in force when the claim is made. Three things follow. Keep the retroactive date unbroken. Plan run off if the consultancy is sold or closes. And make sure your appointments describe habitat forecasts as professional opinion: a promise that a habitat will reach a stated condition is a guarantee, and guarantees are usually excluded. [Run off cover explained](https://www.hammondpi.com/insights/run-off-cover.md)

## Your role decides the policy question

Biodiversity net gain roles and the question each raises for a PI policy

Your role

The question for your policy

Exemption screening

Is it within the business description, and who checks the habitat on site?

Habitat survey and condition assessment

Who is competent for each habitat type, and how is junior or seasonal work checked?

Metric calculation and gain plan

Is there a second check before submission, and how would a repeated error aggregate?

Habitat management and monitoring plan

Do your terms forecast the outcome or guarantee it?

Monitoring over the 30 years

Is each visit on your current terms, and will cover still be in place?

Infrastructure projects

How does the size of the scheme compare with your limit and with any cap in the appointment?

Finding or selling off-site units

This is not consultancy. It may sit outside a PI policy unless insurers have agreed to it.

## What to tell insurers now

“Ecology, 100%” no longer describes the risk. Before renewal, tell us what share of fees comes from biodiversity net gain, which of the roles above you take, your largest scheme, whether you are moving into infrastructure work, and how calculations are checked. If the August changes have shifted your work from metrics to exemption letters, say so. Hammond PI presents that picture to insurers so that the business description and the limit follow the work you do now. [Fair presentation explained](https://www.hammondpi.com/insights/fair-presentation.md)

## Taking on biodiversity net gain work?

Tell us which roles you take and for how long, and we will check that your policy and your appointments fit them.

[Speak to a PI specialist](https://www.hammondpi.com/contact.md)[PI for environmental consultants](https://www.hammondpi.com/who-we-cover/environmental-consultants.md)

Related: [PI for environmental consultants](https://www.hammondpi.com/who-we-cover/environmental-consultants.md) · [Run off cover](https://www.hammondpi.com/insights/run-off-cover.md) · [Fair presentation](https://www.hammondpi.com/insights/fair-presentation.md)