Second generation Eurocode 7: the ground model, the 2028 deadline and your PI

The second generation of Eurocode 7 is published, and the first generation has a withdrawal date. Until then two versions of the geotechnical design standard are in use side by side. That is when arguments about “which standard” begin.

Guidance only. Cover depends on your own policy wording; speak to us about your position.

Where the standard stands

Eurocode 7 has been rewritten in three parts. All three are published as British Standards, and BSI has fixed the date on which the first generation will go.

Second generation Eurocode 7: documents and their status
DocumentPositionSource
BS EN 1997-1:2024, general rulesPublished 30 September 2024BSI, product page
BS EN 1997-2:2024, ground propertiesPublished. Its UK National Annex followed on 31 March 2025BSI, National Annex
BS EN 1997-3:2025, geotechnical structuresPublished 31 March 2025BSI, product page
First generation UK adoptionsTo be withdrawn by BSI on 30 March 2028BSI, product page

Until the withdrawal date, BSI says the first generation documents should be considered the applicable standards for UK works, unless a relevant authority or the project specification says otherwise. Second generation provisions may be used alongside them, but with care, and only where that does not lower the level of reliability. National Annexes carry each country’s choices. In the UK they are drafted through BSI committee B/526 and circulated for comment before publication (AGS, Eurocode 7).

What changes in your reports: the ground model

The change most likely to show in a claim file is the ground model. AGS summarises what Part 2 says about it (AGS, ground models):

  • The model shall comprise the geological, hydrogeological and geotechnical conditions at the site.
  • Variability and uncertainty in those conditions shall be included.
  • Its detail and extent shall be consistent with the Geotechnical Category and the zone of influence of the works.
  • It shall be developed and updated as new information becomes available.
  • It should be documented in the Ground Investigation Report, or may be documented in the Geotechnical Design Report.

AGS adds that these clauses apply to every ground model, whatever the size of the job. A “shall” in a design standard gives an expert witness a simple test to apply years later. A report that states its uncertainties is usually easier to defend than one that implies there were none.

Which version did you agree to use?

While two generations coexist, the first question in a dispute may be which one the appointment required. Phrases such as “current standards” or “the latest Eurocodes” do not answer it. The risk is highest where:

  • a project runs across 30 March 2028;
  • the ground investigation was reported under one generation and the design is done under the other;
  • the client’s specification, the checker and the designer each assume a different version;
  • provisions from both generations are combined with no record of why reliability is not reduced.

Name the standard, part and year in the proposal, the appointment and the report. The terms AGS suggests for assigned reports say performance should be judged by the standards prevailing when the report was prepared (AGS, warranties, reliance and limiting liability). The same words are worth having in the appointment itself.

Updating the model: a duty that can outlast the report

A model that must be updated as information arrives raises a question of scope: who updates it once construction starts?

The courts have already dealt with a designer who relied on an unverified assumption. In Ove Arup v Mirant the foundations of a power station boiler house were designed on an assumed bearing capacity of 3MPa, a preliminary figure that was meant to be verified. Two foundations settled by 46mm and 66mm early in construction. The Court of Appeal held that a designer working from an unverified assumption need not verify it personally but “must see to it that someone does”, and that examining the surface of the formation was not enough (National Archives, [2005] EWCA Civ 1585).

The code of practice for tunnel works expects the same of tunnel designers during construction (Tunnels & Tunnelling, updated code). If your appointment ends when the report is issued, say so in the report, and say what remains to be verified and by whom.

What it means for your cover

PI wordings do not usually name design standards, so a new code changes nothing in the policy itself. It changes the risk the policy sits behind, in three ways.

  • Presentation. Insurers may ask how the consultancy is managing the change: training, checking, software and report templates. A clear answer is part of a fair presentation of the risk. Fair presentation explained
  • Contract terms. A promise to comply with a named standard in all respects can be a strict obligation, which goes beyond reasonable skill and care. Most wordings exclude liability assumed by contract to that extent.
  • The long tail. Reports issued during the changeover may be examined many years later. Keep the appointment, the version used and the reasons with the report, and carry the retroactive date across unchanged whenever you change insurer.

What to do now

  1. Decide, project by project, which generation applies, and record the client’s agreement.
  2. State the standard, part and year in every proposal, appointment and report.
  3. Update report templates so the ground model, its uncertainties and its limits are set out as Part 2 describes.
  4. Agree in writing who updates and verifies the model during construction.
  5. Brief checkers and sub-consultants on the version in use, and record any decision to combine provisions.
  6. Tell us at renewal what you have done, so we can present it to insurers. Renewal

Changing over to the new Eurocode 7?

Tell us how you are managing it and send us your standard terms, and we will present the change to insurers and flag any wording that promises more than skill and care.