Insights for project managers

# What PI must a project manager hold? RICS, your appointment and twelve years

No single regulator sets a project manager’s PI. RICS fixes a minimum for the firms it regulates, APM and CIOB set none, and the appointment you sign usually asks for far more, for far longer. Here is how the three fit together.

Who decidesRICS rulesThe appointmentWhere firms slipChoosing a limitBefore you sign

Guidance only. Cover depends on your own policy wording; speak to us about your position.

## Three places the requirement comes from

No statute makes a project manager insure. The requirement comes from wherever you have agreed to it.

-   **RICS**, if the firm is regulated by RICS. It sets a minimum limit by turnover and minimum policy terms ([RICS, PII in the UK](https://www.rics.org/regulation/regulatory-compliance/professional-indemnity/pii-in-the-uk)).
-   **APM and CIOB**, which set no figure. APM’s Code of Professional Conduct does not mention insurance ([APM, Code of Professional Conduct](https://www.apm.org.uk/media/ivjcpn0f/apm-code-of-professional-conduct.pdf)). CIOB’s consultancy scheme asks applicants for their relevant insurance certificates and names professional indemnity as an example ([CIOB, scheme rules](https://www.ciob.org/media/497/download)).
-   **Your appointments**, and the warranties given under them. For most consultancies these set the real requirement, project by project.

A consultancy can meet the first and still be in breach of the third.

## What RICS requires of a regulated firm

RICS PII requirements for regulated firms, Version 11, from 1 July 2025

Point

What RICS requires

Minimum limit

Turnover in the preceding year of £100,000 or less: £250,000. £100,001 to £200,000: £500,000. £200,001 and above: £1,000,000.

Basis

Any one claim, or aggregate with unlimited round the clock reinstatement. Asbestos, pollution and fire safety cover can be in the aggregate.

Excess

For a limit of £10,000,000 or less, no more than the greater of 2.5% of the sum insured or £10,000, each and every claim.

Insurer and wording

A RICS listed insurer, on the RICS minimum policy wording or wider, on a full civil liability basis.

Defence costs

In addition to the limit, except for asbestos, pollution and fire safety.

Past work

Fully retroactive, except that fire safety cover for buildings of five storeys and above may carry a retroactive date of 1 July 2024 or later.

When the firm stops

Run off cover. Consumer claims: £1,000,000 in all for six years. Other claims: adequate and appropriate cover, expected for at least six years.

Source: [RICS, PII requirements Version 11](https://www.rics.org/content/dam/ricsglobal/documents/regulation/RICS-Professional-indemnity-insurance-requirements_UK-and-Republic-of-Ireland_020725.pdf). The scale stops at £1 million for every firm with turnover above £200,000, whatever the size of the projects it manages.

## What the appointment adds

An insurance clause in an appointment usually has four parts: an amount, a basis, a period, and a qualifier about availability. Each can ask for more than RICS does.

**The amount** follows the project, not your turnover. In _Ampleforth Abbey Trust v Turner & Townsend_ the project manager’s fees were £111,321, and its appointment required cover of £10 million for any one occurrence or series of occurrences ([\[2012\] EWHC 2137 (TCC)](https://caselaw.nationalarchives.gov.uk/ewhc/tcc/2012/2137)).

**The period** follows limitation. A claim under a simple contract can be brought for six years from the breach, and under a deed for twelve (Limitation Act 1980, [section 5](https://www.legislation.gov.uk/ukpga/1980/58/section/5) and [section 8](https://www.legislation.gov.uk/ukpga/1980/58/section/8)). So appointments signed as deeds commonly ask you to maintain cover for twelve years after completion. On housing, claims under the Defective Premises Act can run for longer still ([Building Safety Act 2022, section 135](https://www.legislation.gov.uk/ukpga/2022/30/section/135)).

Each collateral warranty repeats the promise to someone new: a funder, a purchaser, a tenant.

## Where firms get caught

-   **The basis does not match.** The appointment says “each and every claim”. The policy gives that for most claims, but fire safety, pollution or asbestos cover in the aggregate. On a residential block that gap may matter most.
-   **A twelve year promise on a twelve month policy.** PI is renewed each year, and terms can change at any renewal. A promise to keep a set limit for twelve years is safer if it applies only while cover is available at commercially reasonable rates and terms, with a duty to tell the client if it is not.
-   **The role is not in the business description.** A limit is no help if insurers were never told you act as employer’s agent, principal designer or development manager.
-   **A retroactive date moves.** A change of insurer can leave past projects outside the new policy unless the dates carry across.
-   **The firm closes.** The promise outlives the company. Without run off cover it cannot be kept. [Run off cover explained](https://www.hammondpi.com/insights/run-off-cover.md)
-   **The certificate says less than the clause.** Clients ask for evidence each year. A broker’s letter should describe the cover as it is, not as the appointment wishes it were.

## Set the limit by the project, not the scale

A project manager’s fee is a small fraction of the project it manages. A late completion, an unsigned contract or an uncollected bond can cost the client many times that fee. So the right limit starts with your largest project and the roles you hold on it, not with a turnover band.

Then look at how the limit works. An any one claim limit is available again for the next claim. An aggregate limit can be used up by the first. The series of claims wording decides whether one failed system across several projects is one claim or many. We read these with you before recommending a figure. [The clause guide](https://www.hammondpi.com/clauses.md)

## Five checks before you sign an insurance clause

1.  Compare the amount and basis asked for with your schedule, including any aggregate sections.
2.  Check the period, and that the promise depends on cover being available at commercially reasonable rates and terms.
3.  Check every role in the appointment against the business description on your policy.
4.  Read the cap beside the insurance promise. A low cap next to a high insurance requirement can be hard to defend.
5.  Send us the clause before you sign. If it asks for something your policy does not give, we would rather say so now than after a claim. [Contract reviews](https://www.hammondpi.com/contract-reviews.md)

## Asked to promise a limit for twelve years?

Send us the insurance clause and your schedule, and we will tell you where the two differ before you commit.