Building contractors and design and construct businesses

# Professional indemnity for building contractors and design and construct businesses

Design and construct PI, read clause by clause by specialist brokers. We know where a contractor’s design liability starts, what JCT, NEC and employers’ requirements really ask of your policy, and how contractors’ wordings differ from the ones your consultants buy.

[Speak to a PI specialist](https://www.hammondpi.com/contact.md)[Send us your renewal for review](https://www.hammondpi.com/renewal.md)[Get a quote](https://www.hammondpi.com/quote/?profession=design-and-build-contractors.md)

-   **Since 1990**Specialist PI brokers
-   **30+ insurers**Plus specialist agencies and Lloyd’s
-   **4.9 out of 5**From 228 Google reviews
-   **FCA authorised**FRN 302911, independently owned

On this page

-   Your map
-   Our experience
-   Who requires PI
-   Claim scenarios
-   Inside the wording
-   Law and duties
-   Specialist work
-   Your presentation
-   Business changes
-   Other covers
-   Questions
-   Forms and claims

Your map

## The building contractors and design and construct map: from your work to the policy and beyond

Your business’s work on one side, the policy on the other. Select a point to see what it connects to, then follow the link to the part of this page that explains it.

Still 3D render (motion off)

### The map, area by area

Each heading below is one area of the map, and the number shows how many points it holds. Open a heading and tap any point: it lights up on the map with everything it connects to, and a short note explains why.

### Practice and business risks 12

-   
-   
-   
-   
-   
-   
-   
-   
-   
-   
-   
-   

### Your terms and framework agreements 8

-   
-   
-   
-   
-   
-   
-   
-   

### Appointments and contracts 6

-   
-   
-   
-   
-   
-   

### Legislation 3

-   
-   
-   

### Policy documents and schedule 10

-   
-   
-   
-   
-   
-   
-   
-   
-   
-   

### Main policy wording 8

-   
-   
-   
-   
-   
-   
-   
-   

### Exclusions and restrictions 3

-   
-   
-   

### Succession, closure and earlier work 4

-   
-   
-   
-   

### Other insurance and final assessment 8

-   
-   
-   
-   
-   
-   
-   
-

Our experience

## Why design and build contractors come to a specialist

Two contractors with the same turnover can carry very different design risk. A contractor’s designed portion on a traditional job, a full JCT design and build with novated consultants, a specialist façade or building services package and a principal designer appointment each put different promises over your signature, and different questions to your policy.

Hammond PI has specialised in professional indemnity since 1990. We read the wording itself: how each insurer defines your professional activities, where the workmanship exclusion stops and negligent design starts, and what it does with fitness for purpose, collateral warranties, fire safety and the cost of putting a defect right. Then we present your business so insurers underwrite the design risk you actually carry.

When a defect or a letter of claim arrives we stay involved. We put the matter to insurers, separate the design allegation from the workmanship, gather what they need and follow it through with the claims handler.

1.  **The work**Design and build, contractor’s designed portions, specialist packages and dutyholder roles, by sector and contract value
2.  **What can go wrong**Design errors, wrong specification, fire safety and cladding defects, water ingress, consultants’ mistakes that land on you
3.  **What the policy must answer**The negligent design trigger, contractual liability, fitness for purpose, fire safety terms, rectification costs and past work
4.  **How we present it**Design control, novation and subcontract terms and cladding history explained, with wordings compared across insurers

Who requires PI

## No professional body sets a contractor’s PI. Your contracts do

No regulator or professional body sets a minimum for contractors. The requirement comes from the building contract, the client’s tender conditions and the funder’s terms. These are the sources we see most, with what each one actually asks for.

PI requirements: Who requires PI

Who

Minimum cover

Excess

After you stop

Other conditions

JCT Design and Build Contract (clauses 6.15 and 6.16)

No fixed figure. Clause 6.15 obliges the contractor to hold PI at the level the employer enters in the Contract Particulars. The 2024 edition adds space there for sub-limits and for policy exclusions, such as fire safety. Basis: as stated in the Contract Particulars.

Not specified

For the period the Contract Particulars state, so long as cover stays available at commercially reasonable rates and terms

If cover stops being available on those terms, clause 6.16 requires the contractor to tell the employer so that both can discuss how to protect their positions. Employers’ amendments often change both clauses.

NEC4 Engineering and Construction Contract (secondary option X15)

No fixed figure. The core clauses do not require cover for design negligence. Where secondary option X15 is chosen, clause X15.5 requires the contractor to take out PI.

Not specified

PI is the one contractor’s insurance that must continue after the defects certificate is issued

X15 sets the design duty at the skill and care normally used by professionals designing similar works. Where X15 is not used, NEC advises the client to state a PI requirement in the contract data.

Public contracts and frameworks (Procurement Act 2023 and the Construction Playbook)

Each contracting authority sets its own figure as a condition of participation. The condition must be proportionate to the nature, complexity and cost of the contract. Basis: set by each tender.

Not specified

Set by each contract

An authority may not require the insurance to be in place before the contract is awarded. The Construction Playbook tells authorities not to ask suppliers to take unlimited liabilities.

Sources: [JCT (DB 2024 edition)](https://www.jctltd.co.uk/docs/contents-pages/DB-2024.pdf), [NEC4 (NEC4 ECC, as described in NEC’s own insurance guidance)](https://www.neccontract.com/news/insurance-what-every-ecc-pm-should-know), [Public sector (Procurement Act 2023, section 22; Construction Playbook version 1.1, September 2022)](https://www.legislation.gov.uk/ukpga/2023/54/section/22). Businesses answering to more than one must meet each set of rules.

A minimum is not a recommendation. Many businesses need more, and cover for each and every claim can protect better than an aggregate limit.

Why the minimum is rarely the right limit

A contract figure is set for one project. Your policy answers every project you have ever designed, on the terms in force when the claim is made. One cladding or fire safety claim can exceed a contract minimum on its own, an aggregate limit can be spent by a single matter, and claims over dwellings can now reach back up to 30 years. Check the basis, the sub-limits and the exclusions before you check the amount.

Claim scenarios

## When a claim arrives: how we would handle it

Situations design and build contractors face, the risk hidden in each, and the strategy we would follow from the first letter. Choose a scenario.

### Water is getting into a finished block and the employer blames workmanship

The situationEighteen months after practical completion, water is entering flats at the balcony thresholds of a block you built under a JCT design and build contract. The employer’s agent writes alleging defective workmanship and demands that you return and put it right at your own cost.

The riskTreating it as snagging. PI wordings for contractors usually exclude pure workmanship and respond only where negligent design or specification caused the defect. If your team opens up and rebuilds before anyone asks who designed the threshold detail, the evidence goes, and so may the cover for the cost.

Our strategy

1.  Notify insurers as a circumstance before anyone returns to site, describing the defect, the employer’s letter and the possible design issue, whatever your own view on liability.
2.  Establish who designed the threshold detail: the novated architect, your design manager or the window subcontractor. That answer decides whether this is a design claim or a workmanship problem.
3.  Ask insurers to agree to opening up, investigation and any early repair as mitigation costs. Most wordings pay these only with prior written consent.
4.  Record what is found with photographs and an independent report before anything is replaced, so the design and installation causes can be separated later.
5.  Put the subcontractor and designer on written notice, without admitting anything to the employer, so their insurers are engaged and your rights of recovery are kept.

What we aim forThe design element of the defect dealt with under the policy, repairs agreed with insurers in advance, and recovery rights against the designer and subcontractor preserved.

The lesson**Ask who designed the detail before you fix it. Workmanship is excluded. Negligent design is what PI is for.**

### Your engineer finds a design error in the frame before handover

The situationMidway through a school project, your temporary works engineer notices that the transfer beams designed by your structural subconsultant are undersized. Two floors are already built on them. The employer does not know and nobody has made a claim.

The riskStrengthening the frame quietly and absorbing it as a site cost. Some contractors’ wordings will pay to rectify a design defect found before handover, but usually only if insurers are told first and agree the steps. Your own profit and mark up are normally excluded either way.

Our strategy

1.  Notify insurers at once as a circumstance, with the engineer’s calculations, the affected areas and the programme, before any strengthening work is instructed.
2.  Show why a claim would follow if nothing were done: the design falls below the standard, the building contract makes you answerable for it, and the employer would have a claim on completion.
3.  Agree the remedial scheme and its cost with insurers in writing under the mitigation or rectification clause, and keep cost records net of profit and mark up.
4.  Put the structural subconsultant on notice and ask for its PI details, so its insurers are engaged and the cost can be pursued against the party that made the error.
5.  Agree with insurers what the employer is told and when, so that openness about the defect is not read as an admission that prejudices the policy.

What we aim forThe remedial cost agreed by insurers before it is spent, the programme protected, and a recovery pursued against the subconsultant’s policy.

The lesson**Rectification cover works only if insurers agree first. Tell us on the day the error is found.**

### The floor fails its performance specification although the design followed the standard

The situationYou designed and built a distribution warehouse on amended JCT terms. The Employer’s Requirements said the slab would carry a stated racking load for 25 years. It is cracking after three. Your engineer followed the recognised design guidance and nobody alleges carelessness.

The riskAssuming PI answers any design failure. The employer is claiming on the performance promise, not on negligence. Contractors’ wordings usually exclude liability more onerous than the ordinary duty of skill and care, including guarantees of fitness for purpose or of meeting a performance specification.

Our strategy

1.  Notify insurers in full, enclosing the Employer’s Requirements and the schedule of amendments, so the contractual and negligence routes are both in front of them from the start.
2.  Have panel solicitors test whether the promise is truly absolute. In MT Højgaard v E.ON the Supreme Court enforced a service life requirement although the contractor had followed the design standard.
3.  Investigate whether there was also a failure of skill and care in the ground investigation, loading assumptions or joint design. Cover usually responds to the extent liability would exist without the warranty.
4.  Look to the engineer’s appointment. If it promised only reasonable skill and care, the gap between your promise and theirs may sit with you, uninsured.
5.  For the next tender, send us the amendments before you sign, so the fitness for purpose wording can be negotiated out or accepted knowingly.

What we aim forInsurers engaged on the negligence element, a clear view of what is uninsured, and no surprise about which promise the claim is really made on.

The lesson**PI insures reasonable skill and care. A fitness for purpose promise may go further than any policy will follow.**

### The novated architect got the cavity barriers wrong and has since gone into liquidation

The situationOn a student residence, the architect novated to you by the employer detailed the cavity barriers incorrectly. The employer claims against you under the building contract. The architect’s practice went into liquidation last year.

The riskTelling the employer it is the architect’s problem. Under design and build you answer for the whole design. Your own wording may also ask whether you checked the consultant’s PI when you took the novation, and may exclude loss where your contract gave away rights of recovery.

Our strategy

1.  Notify your own insurers straight away. The claim is against you, and your policy is the one that must respond first.
2.  Produce the evidence that you checked the architect’s PI at novation and each year after. Some wordings make that check, and the record of it, a condition of cover for subcontracted design.
3.  Read the novation agreement for liability caps, net contribution clauses or a missing warranty for services before novation. Anything that restricts recovery needs explaining to insurers now.
4.  Identify the architect’s insurer for the relevant year. The Third Parties (Rights against Insurers) Act 2010 can transfer an insolvent firm’s policy rights to the party it is liable to.
5.  Check whether the architect’s policy carried a fire safety exclusion, because that decides how much of any recovery is real.

What we aim forYour policy responding to the employer’s claim, with every available route to the architect’s insurers kept open.

The lesson**A novated consultant’s PI is not your PI. Check it at novation and keep the evidence.**

### A claim arrives over the cladding on flats you finished in 2011

The situationA housing association’s solicitors write about a nine storey block you designed and built in 2011. They allege combustible insulation and missing cavity barriers, cite the Defective Premises Act and seek the cost of full remediation plus a waking watch.

The riskReplying that the claim is out of time. For dwellings, the Building Safety Act extended the Defective Premises Act period to 30 years for older work. Meanwhile your current policy may exclude fire safety claims or cap them in the aggregate, so where the claim attaches matters greatly.

Our strategy

1.  Search past policy years first. If this building, or a review of your cladding projects, was notified to an earlier insurer before fire safety exclusions were applied, the claim may attach to that policy.
2.  Notify the current insurer as well, in full, so that neither can say it was not told.
3.  Establish who specified the system and who installed it, and trace the subcontractor, the designer and their insurers. In URS v BDW the longer period was held to support contribution claims too.
4.  Warn insurers that adjudication is possible. In BDW v Ardmore an adjudicator decided a Defective Premises Act claim on a 2002 contract and the court enforced an award of over £14 million.
5.  Tell us about group companies. A building liability order can make an associated company answer for the original contractor’s liability.

What we aim forThe claim attached to the most favourable policy year available, the defence funded, and recovery routes against designers and subcontractors identified early.

The lesson**Old projects are live again. Your past notifications may be worth more than your current policy.**

### A notice of adjudication over your smoke ventilation design lands on a Friday

The situationYou are a mechanical services subcontractor with design responsibility. The main contractor has withheld your final account and now serves a notice of adjudication, claiming the smoke ventilation system you designed does not meet the fire strategy and must be replaced.

The riskHanding it to your quantity surveyor as a payment dispute. The counterclaim is a design claim. Some wordings cover adjudication only if insurers are told within days of the notice, and defence costs incurred without consent are not paid. The timetable leaves no room to catch up.

Our strategy

1.  Send us the notice the day it arrives. We would notify insurers at once, because some wordings allow as little as two working days for an adjudication.
2.  Separate the two disputes. The unpaid account is a commercial debt and is not insured. The allegation that your design was negligent is what the policy is for.
3.  Ask insurers to appoint solicitors and a fire engineering expert immediately, so the response is prepared inside the adjudication timetable and with insurers’ consent to the cost.
4.  Check the subcontract for the design standard you accepted, any fitness for purpose wording and who approved the fire strategy your design had to meet.
5.  Agree nothing on the account that could be read as accepting the defect. Any settlement of the design claim needs insurers’ written consent first.

What we aim forA funded, expert defence of the design allegation within the timetable, and the payment dispute kept from prejudicing the policy.

The lesson**Adjudication moves faster than most policies allow for. Notify on the day the notice arrives.**

### A tenant claims under a collateral warranty wider than your building contract

The situationNine years after completing an office building, you receive a claim from the tenant for defective curtain walling design. It sues on a collateral warranty you signed at handover. The warranty runs for fifteen years and has no clause limiting your liability to that under the building contract.

The riskAssuming every warranty you sign is insured. Contractors’ wordings usually cover collateral warranties only where the benefit is no greater and lasts no longer than the duty owed to the original client, and not for guarantees of fitness for purpose or completion dates.

Our strategy

1.  Notify insurers with the warranty, the building contract and the dates of each side by side, so the differences are identified at the outset.
2.  Compare the two documents: standard of care, limitation period, losses recoverable, step in rights and how many assignments are allowed.
3.  Have solicitors take every equivalent rights defence available, so the tenant recovers no more than the employer could have.
4.  Check whether the tenant can adjudicate. In Abbey Healthcare the Supreme Court held that a warranty merely repeating the contractor’s promises to the employer is not a construction contract.
5.  Trace the curtain walling subcontractor and its warranty, so the design liability can be passed to the party that produced the design.

What we aim forCover confirmed for the part of the warranty that mirrors the building contract, and the uninsured excess identified and defended.

The lesson**Every warranty should give no greater liability, for no longer, than the building contract. Send them to us first.**

Illustrative scenarios. How any real claim is handled depends on the facts, the policy wording and insurers’ agreement.

### Four things design and build contractors should know about PI

The date of the work and the date of the claim are different

A claim today may concern a building you designed and handed over several years ago. PI is written on a claims made basis: the policy in force when the claim is made responds, provided the work falls after the retroactive date and nothing was already notified under an earlier policy.

Year 1Year 2Year 3Year 4Year 5

**Design issued****Defect found****Employer claims**This year’s policy responds

Claims made cover: the policy in force when the claim is made is the one that responds.

A valid notification of circumstances can connect a later claim to an earlier policy. That is why continuity matters when you change insurers or stop a particular service. [How claims made cover works](https://www.hammondpi.com/insights/professional-indemnity-explained.md)

Bad workmanship is not a PI claim. Negligent design is

A contractor’s PI policy is not a guarantee of the building. Most design and construct wordings exclude the construction work itself and bring cover back only where the loss comes from a negligent design, specification or other professional activity listed in the policy. The first question on any defect is therefore who designed it, and whether the design or the installation failed. Many defects are both, and the policy may then answer only the design share. That is why we ask you to notify before you repair: once the work is opened up and replaced, the evidence that separates the two has gone.

For dwellings, your liability can now run for up to 30 years

The Defective Premises Act 1972 requires anyone who takes on work for the provision of a dwelling to do it in a workmanlike or professional manner, with proper materials, so the dwelling is fit for habitation. You cannot contract out of that duty ([Defective Premises Act 1972](https://www.legislation.gov.uk/ukpga/1972/35)). The Building Safety Act 2022 extended the time limit to 30 years for claims that had already accrued before 28 June 2022, and to 15 years for later claims ([Building Safety Act 2022, section 135](https://www.legislation.gov.uk/ukpga/2022/30/section/135)). PI is written on a claims made basis, so it is the policy in force when the claim arrives, with its current fire safety terms, that has to respond.

How your limit of indemnity works

Two unrelated covered claims of £750,000 each come to £1.5 million. Under a £1 million limit in the aggregate, the policy pays up to £1 million for the year in total. Under a £1 million limit for each and every claim, each claim has its own £1 million, subject to the policy’s aggregation wording and other terms.

£1 million in the aggregate

Covered £1mNot covered £500k

£1 million each and every claim

Claim 1 £750k

Claim 2 £750k

The same two claims under an aggregate limit and an each and every claim limit.

Then check whether defence costs are paid in addition to the limit or use it up, and when the excess applies.

Inside the wording

## Twelve clauses that decide design and build contractors’ claims

Two policies with the same limit can answer the same claim very differently. These are the clauses we read first, what each means for a design and build contractor and what we check.

Insuring clause and “professional duty”

What it doesCovers liability for breach of professional duty in your business. The policy defines that duty as a list: design, specification, technical calculations, feasibility studies, surveying and any other activities named in the schedule.

For a design and build contractorIf design management, principal designer duties, fire engineering input or temporary works design is not within the definition or the schedule, a claim from it may fall outside cover.

What we checkThe definition and the schedule against every design activity you actually perform or manage.

Workmanship and construction exclusion

What it doesExcludes liability from constructing, installing, altering or repairing, by you or your subcontractors, unless the loss was caused by a breach of professional duty.

For a design and build contractorThis is the clause that separates your PI from a consultant’s. A defect must be traced to negligent design or specification before the policy will respond.

What we checkHow the exception is worded, and whether it needs negligence or responds to any breach of professional duty.

Supervision of your own works

What it doesSupervision may count as a professional activity only where the works supervised are not carried out by you, a connected company or your subcontractors.

For a design and build contractorA failure by your own site managers to spot bad work is usually treated as workmanship, not as a professional error. Inspection duties under design and build can fall into that gap.

What we checkWhether supervision and inspection of your own packages sits inside or outside the professional duty definition.

Contractual liability and fitness for purpose

What it doesExcludes liability more onerous than the law would imply, including guarantees, penalties and liquidated damages.

For a design and build contractorAmended JCT and NEC terms often ask for fitness for purpose, performance guarantees or wide indemnities. The policy usually follows you only as far as reasonable skill and care.

What we checkThe exclusion against your usual contract amendments, and whether cover remains for liability that would exist without the onerous term.

Collateral warranties

What it doesBrings warranties and duty of care agreements back into cover, provided the benefit is no greater and lasts no longer than the duty owed to your client.

For a design and build contractorFunders, purchasers and tenants each want one. A longer period, wider losses or unlimited assignment can take a warranty outside this protection.

What we checkEach warranty for a no greater liability clause, its duration and its assignment terms, before you sign.

Mitigation and rectification costs

What it doesPays agreed costs of avoiding a claim, or reducing a loss, that the policy would otherwise cover. Insurers’ prior written consent is usually required.

For a design and build contractorThis is the route to funding the repair of a design defect before handover or before the employer claims. Your own profit and mark up are normally excluded.

What we checkWhether rectification before handover is covered, the consent needed, any sub-limit and how the costs must be recorded.

Fire safety and cladding

What it doesOften added by endorsement: an exclusion, or an aggregate sub-limit, for claims about combustibility, fire performance or external wall systems.

For a design and build contractorA current policy with a fire safety exclusion may not answer a claim about a block finished years ago, however good the cover was when you built it.

What we checkThe exact wording, what it catches beyond cladding, whether defence costs sit inside the sub-limit, and what was notified in earlier years.

Subconsultants and subcontracted design

What it doesCover for work you subcontract can depend on your having checked that the subconsultant or subcontractor holds adequate PI, and on keeping evidence of the check.

For a design and build contractorMost of your design is produced by others: novated consultants, specialist subcontractors and suppliers. Their errors are your liability to the employer.

What we checkThe condition itself, your procedure for collecting PI evidence each year, and whether limits and exclusions are checked as well as the existence of a policy.

Rights of recovery

What it doesExcludes or reduces cover where an agreement you made has restricted your rights of recovery against a third party.

For a design and build contractorLiability caps, net contribution clauses and limited warranties in consultants’ appointments and novation agreements can all restrict what is recoverable.

What we checkYour standard appointment and subcontract terms for anything that limits what insurers could recover.

Adjudication

What it doesCovers adjudication only if insurers are notified very quickly, sometimes within two working days of the notice, and the timetable is no more onerous than the statutory scheme.

For a design and build contractorDesign counterclaims regularly arrive inside payment adjudications. A late notice, or a bespoke contract timetable, can put cover at risk.

What we checkThe notice period, the conditions on procedure, and your internal route for getting a notice to us the same day.

Notification and aggregation

What it doesClaims and circumstances must be notified as soon as reasonably possible. Claims arising from one originating cause are treated as one claim with one limit.

For a design and build contractorA detail repeated across several blocks, or one specification used on many projects, can be one claim. Whether that helps or hurts depends on the limit and the excess.

What we checkThe definition of a circumstance, the aggregation words, and whether the limit is any one claim or in the aggregate.

Pollution and asbestos

What it doesPollution cover is usually limited to sudden incidents caused by a professional error, within a lower aggregate limit that includes costs. Asbestos is often excluded altogether.

For a design and build contractorRefurbishment and brownfield work bring both. JCT’s Contract Particulars have long provided for a pollution and contamination sub-limit to be stated.

What we checkSub-limits and exclusions against the contract’s insurance clause, so you do not promise cover you do not hold.

[The clause guide: how each part of a PI policy works](https://www.hammondpi.com/clauses.md)

Law and duties

## Design liability, the Building Safety Act and how long you stay liable

### The Building Safety Act and dwellings

-   **Dutyholders.** Since 1 October 2023, Part 2A of the Building Regulations 2010 has put duties on principal contractors and principal designers to plan, manage and monitor the work so that it complies. Each must be competent for the role ([Building Regulations 2010, Part 2A](https://www.legislation.gov.uk/uksi/2010/2214/part/2A)).
-   **Higher-risk buildings.** At completion, the principal contractor and the principal designer each sign a declaration that they fulfilled their Part 2A duties ([Higher-Risk Buildings Procedures Regulations 2023, regulation 40](https://www.legislation.gov.uk/uksi/2023/909/regulation/40)). Tell us before you accept either role on such a building.
-   **Defective Premises Act.** Work on dwellings must be done in a workmanlike or professional manner, with proper materials, so the dwelling is fit for habitation. The time limit is now 15 years, or 30 for claims that accrued before 28 June 2022 ([Building Safety Act 2022, section 135](https://www.legislation.gov.uk/ukpga/2022/30/section/135)).
-   **Building liability orders.** The High Court can make an associated company liable for another company’s liability under the Defective Premises Act, or for a building safety risk, where that is just and equitable, even if the original company has been dissolved ([Building Safety Act 2022, section 130](https://www.legislation.gov.uk/ukpga/2022/30/section/130)).

### Contract terms and third parties

-   **Skill and care or fitness for purpose.** JCT’s 2024 Design and Build Contract states that the contractor’s design duty is no greater than the required level of skill and care, so far as statute permits. Employers’ amendments often remove that protection ([Browne Jacobson, JCT 2024 overview of changes](https://www.brownejacobson.com/insights/jct-2024-overview-of-changes)).
-   **NEC4.** Secondary option X15 limits design liability to the skill and care normally used by professionals designing similar works. NEC’s own guidance notes that cover for a fitness for purpose standard is unlikely to be available ([NEC, insurance guidance](https://www.neccontract.com/news/insurance-what-every-ecc-pm-should-know)).
-   **Limitation.** A simple contract carries six years and a deed twelve ([Limitation Act 1980, section 5](https://www.legislation.gov.uk/ukpga/1980/58/section/5) and [section 8](https://www.legislation.gov.uk/ukpga/1980/58/section/8)). Building contracts and warranties are commonly executed as deeds, and the Defective Premises Act periods now run longer still.
-   **Third party rights.** Funders, purchasers and tenants can be given direct rights by collateral warranty or under the Contracts (Rights of Third Parties) Act 1999 ([section 1](https://www.legislation.gov.uk/ukpga/1999/31/section/1)). Each is a further party who can claim on your design.

### Court decisions behind these points

\[2017\] UKSC 59

### MT Højgaard v E.ON Climate and Renewables

A contractor that followed the design standard with reasonable skill and care was still liable on a 20 year service life requirement. The stricter obligation prevailed.

[Read the judgment](https://caselaw.nationalarchives.gov.uk/uksc/2017/59)

\[2025\] UKSC 21

### URS Corporation v BDW Trading

The retrospective 30 year period also supports negligence and contribution claims that depend on Defective Premises Act liability. No rule bars recovery of repair costs incurred voluntarily.

[Read the judgment](https://caselaw.nationalarchives.gov.uk/uksc/2025/21)

\[2022\] EWHC 1813 (TCC)

### Martlet Homes v Mulalley

A design and build contractor was liable for specifying combustible external wall insulation under a 2005 contract, and for installation defects. Waking watch costs were recoverable.

[Read the judgment](https://caselaw.nationalarchives.gov.uk/ewhc/tcc/2022/1813)

\[2024\] EWHC 3235 (TCC)

### BDW Trading v Ardmore Construction

An adjudicator could decide a Defective Premises Act claim arising from a 2002 building contract. The court enforced an award of over £14 million against the contractor.

[Read the judgment](https://caselaw.nationalarchives.gov.uk/ewhc/tcc/2024/3235)

\[2024\] EWHC 3569 (TCC)

### 381 Southwark Park Road RTM v Click St Andrews

A building liability order made a parent company liable for its insolvent subsidiary’s fire safety and structural defects.

[Read the judgment](https://caselaw.nationalarchives.gov.uk/ewhc/tcc/2024/3569)

\[2024\] UKSC 23

### Abbey Healthcare (Mill Hill) v Augusta 2008 (formerly Simply Construct)

A collateral warranty that only repeats the contractor’s promises under the building contract is not a construction contract, so it carries no statutory right to adjudicate.

[Read the judgment](https://caselaw.nationalarchives.gov.uk/uksc/2024/23)

These decisions explain where a professional’s duty lies. They do not decide whether a particular policy responds.

Specialist work

## The work that changes your cover

A turnover split on a proposal form says little about design risk. These are the areas where we ask most, starting with the two that shape every contractor’s renewal now: fire safety and the Building Safety Act dutyholder roles.

Fire safety and cladding: what does your policy still cover?

Insurers restrict fire safety cover across construction. In the Construction Leadership Council’s 2021 survey of 1,066 firms, over 60% had some restriction on cladding or fire safety cover, one in three had a total exclusion for cladding claims and one in five a total exclusion for fire claims ([Construction Industry Council, CLC survey results](https://www.cic.org.uk/news/professional-indemnity-insurance-restrictions-harming-industry)). Terms still differ sharply between insurers.

-   **The wording.** Some exclusions catch only external wall systems. Others reach any claim about fire performance, including fire stopping, compartmentation, fire doors and smoke control.
-   **The basis.** A sub-limit may be in the aggregate and include defence costs, so one claim can use it up.
-   **The contract.** JCT’s 2024 Contract Particulars have space to record sub-limits and exclusions, so the employer knows what you hold ([Mills & Reeve, JCT DB 2024 insurance](https://www.mills-reeve.com/blogs/construction/august-2024/jct-d-b-2024-insurance-and-reinstatement/)).
-   **The past.** Claims made cover means today’s terms apply to yesterday’s buildings.

We ask for your project list by height, use and external wall type, what has been surveyed and what has been notified. In _Martlet Homes v Mulalley_ a contractor was held liable in 2022 for a system installed under a 2005 contract.

Principal contractor and principal designer: which roles have you accepted?

A design and build contractor is usually the principal contractor, and often the principal designer too, under two separate regimes. JCT’s 2024 form names both roles for the CDM Regulations and again for the Building Regulations ([JCT DB 2024, articles 6 and 7](https://www.jctltd.co.uk/docs/contents-pages/DB-2024.pdf)).

-   **CDM 2015.** Health and safety duties to plan, manage, monitor and coordinate the construction phase ([HSE, principal contractors](https://www.hse.gov.uk/construction/cdm/2015/principal-contractors.htm)).
-   **Building Regulations Part 2A.** Since 1 October 2023, duties to plan, manage and monitor so that the work complies with the building regulations, with a competence requirement for each role ([Part 2A](https://www.legislation.gov.uk/uksi/2010/2214/part/2A)).
-   **Higher-risk buildings.** Buildings of at least 18 metres or seven storeys with two or more residential units go through the Building Safety Regulator, with further duties on both roles ([GOV.UK guidance](https://www.gov.uk/guidance/design-and-building-work-meeting-building-requirements)).

For PI the questions are whether the principal designer role is within your insured activities, who in the business is the designated competent individual, and whether you perform the role yourself or pass the tasks to a consultant. Delegating the tasks does not transfer the legal responsibility. Wordings usually exclude fines, and cover for defending a prosecution is usually a separate, limited extension.

Contractor’s designed portion: a small package with a full design duty

On a traditionally procured job the architect designs the building and you design named parts: the piling, the frame connections, the cladding fixings or the mechanical and electrical installation. It looks like a small design role, but for that portion you carry a designer’s liability, and you usually pass the work to a specialist subcontractor.

We ask which portions you take on, who actually produces the design, what the subcontract says about the design standard and insurance, and how the interface with the architect’s design is checked. Claims often start at that interface, where each side assumed the other had designed the detail. If your proposal says you do “no design”, a contractor’s designed portion is the work that contradicts it.

Novated consultants: whose PI stands behind the design?

Under design and build, the employer’s architect and engineers are often novated to you when the contract is awarded. From then on you answer to the employer for their design, including, depending on the wording, what they did before novation.

-   **Their cover.** Check the limit, the basis and the exclusions each year, not just that a policy exists. A consultant with a fire safety exclusion leaves that risk with you.
-   **Your condition.** Some contractors’ wordings make evidence of those checks a condition of cover for subcontracted design.
-   **The terms.** Liability caps and net contribution clauses in the appointment limit what you, and your insurers, can recover.
-   **Insolvency.** If the consultant fails, the [Third Parties (Rights against Insurers) Act 2010](https://www.legislation.gov.uk/ukpga/2010/10/section/1) may give a route to its insurer.

Fitness for purpose, performance guarantees and other promises PI may not follow

PI follows the professional standard: reasonable skill and care. Many employers’ amendments ask for more: that the works will be fit for purpose, will meet a performance specification, or will comply with the Employer’s Requirements whatever care was taken. In _MT Højgaard v E.ON_ the Supreme Court held a contractor to a service life requirement although it had followed the design standard ([\[2017\] UKSC 59](https://caselaw.nationalarchives.gov.uk/uksc/2017/59)).

We read tender amendments for these terms, and for wide indemnities, uncapped liability and liquidated damages linked to design. The Construction Playbook tells public authorities not to ask suppliers to take unlimited liabilities ([GOV.UK, the Construction Playbook](https://www.gov.uk/government/publications/the-construction-playbook)). Where a term cannot be removed, you should at least know that it sits outside the policy.

Collateral warranties and third party rights

A design and build contract rarely ends with the employer. JCT provides for collateral warranties or third party rights in favour of funders, purchasers and tenants, from you and from your subcontractors ([JCT DB 2024, section 7](https://www.jctltd.co.uk/docs/contents-pages/DB-2024.pdf)). Each one creates a direct claim on your design.

Most wordings cover warranties only if they give no greater benefit, for no longer, than the building contract. We check the standard of care, the limitation period, the losses recoverable, step in rights, the number of assignments and any promise to maintain PI at a stated level. A promise to hold a fixed limit for twelve years, whatever the market offers, is a promise about something you do not control.

Specialist subcontractors with design responsibility

Façade, roofing, mechanical and electrical, fire protection, piling, steelwork and modular specialists often design what they install, under a subcontract that passes down the main contract’s design terms in full. The main contractor may then ask for PI at the main contract level and a warranty to the employer.

We look at whether design is done in house or bought in, and who signs it off, because some wordings require design to be done or supervised by a qualified or suitably experienced person. We also separate product supply from design: a defective product is not a PI claim unless a design or specification error lies behind it.

Remediation and refurbishment of existing residential buildings

Replacing cladding, upgrading fire stopping or converting a building into flats is design work on someone else’s building. Work completed since 28 June 2022 on any building containing a dwelling carries its own Defective Premises Act duty ([Building Safety Act 2022, section 134](https://www.legislation.gov.uk/ukpga/2022/30/section/134)). In the Construction Leadership Council’s 2021 survey, one in three firms said they had been unable to carry out remedial work they wanted to do ([Construction Industry Council](https://www.cic.org.uk/news/professional-indemnity-insurance-restrictions-harming-industry)).

Insurers ask who designs the remedial scheme, who the fire engineer is, what survey information you rely on and what you sign at completion about the external wall. A fire safety exclusion that seems tolerable for new commercial work can remove cover for the very job you are tendering.

Your presentation

## A proposal should explain the work behind the numbers

An unexplained label can make a modest exposure look broader than it is, while a vague one can hide an important responsibility. Here is how we turn brief answers into a picture insurers can underwrite properly.

Brief proposal answers and what we send instead

What insurers often see

What we send instead

“We do no design. It is all subcontracted.”

Which packages carry design, who produces it, the design terms passed down and the PI evidence you collect from each designer.

“Design and build: 40% of turnover.”

The projects behind the figure by sector, contract value, height and form of contract, and the design responsibility accepted on each.

“No cladding work.”

Residential and high rise projects over the past 15 years, external wall types, what has been surveyed and anything already notified.

“Standard JCT terms.”

Your usual amendments: design standard, fitness for purpose, liability caps, warranties and the PI clause you are asked to sign.

“Consultants carry their own PI.”

Who checks limits, exclusions and renewal dates for each consultant, how often, and where the evidence is kept.

“No claims, only a few defects.”

Defects notices, withheld retentions, adjudications and letters alleging design fault, with their status and what insurers were told.

Illustrations of common answers, not statements about particular clients.

### How we handle your renewal

1.  **You send what you have**Schedule, wording, endorsements, last proposal and your renewal date.
2.  **We find what needs explaining**Design split, forms of contract, fire safety history, dutyholder roles, novated consultants, warranties given and past projects.
3.  **We approach suited insurers**From more than 30 insurers, specialist agencies and Lloyd’s, chosen for the work you do.
4.  **We compare the wordings**Cover, clauses, excess and limits side by side, with the differences explained.

Business changes

## When your business changes, the insurance needs reviewing

### A larger or taller project

A first higher-risk building, a new sector or a contract well above your usual size changes the risk. Tell us at tender stage, before the PI clause is agreed.

### Taking on principal designer

Check the role is within your insured activities and that a competent individual is designated. Tell us whether you perform it yourself or appoint a consultant.

### A new group company

Each contracting entity needs to be named on the policy. Building liability orders mean an associated company can be made to answer for another’s building safety liabilities.

### Buying or merging a business

You may inherit its completed projects. Establish its notification history, its fire safety terms and who insures its past work from the day of completion.

### Changing insurer

Notify every known defect and circumstance to the outgoing insurer first. Check the retroactive date carries across, and compare the fire safety terms line by line.

### Ceasing to trade

Liability under a deed lasts twelve years, and Defective Premises Act claims can run for 15 or 30. Plan run off before the company is closed.

[Run off cover explained](https://www.hammondpi.com/insights/run-off-cover.md)

What if we cannot get the cover our contract requires?

Tell us as soon as you know. JCT’s Design and Build Contract makes the PI obligation subject to cover being available at commercially reasonable rates and, in the 2024 edition, on reasonable terms. If it is not, clause 6.16 requires you to notify the employer so that both sides can discuss how to protect their positions ([Mills & Reeve, JCT DB 2024 insurance](https://www.mills-reeve.com/blogs/construction/august-2024/jct-d-b-2024-insurance-and-reinstatement/)). That protection is often amended out, so read the contract you signed. We would set out for the employer what the market is offering and why, a better conversation before signing than after a breach.

Alongside your PI

## Contractors’ all risks and public liability to consider alongside your PI

PI answers claims that your design or specification was negligent. It is not built to pay for damage to the works during construction, or for injury and damage caused by site operations. We recommend contractors consider contractors’ all risks and public and products liability alongside it, because one defect can involve all three.

### Which policy responds?

Tap a situation for the explanation. A general guide only: the answer always depends on the actual wordings.

SituationPIAll risksPublic liability

Fire damages the part built works before practical completionNot built for itBuilt for itNot built for it

Physical loss or damage to the works, site materials and plant during the contract is what contractors’ all risks insures. Under JCT the works are insured under Insurance Option A, B or C. PI is not a property policy.

A design error is found and built work has to be taken down and rebuiltMay respondMay respondNot built for it

PI may fund rectification of a negligent design, with insurers’ prior consent. All risks policies usually exclude the cost of correcting the defective part itself, but may pay for resulting damage to sound work, depending on the defects exclusion.

A passer by is injured by a falling panel during installationNot built for itNot built for itBuilt for it

Injury to the public and damage to third party property arising from site operations is public liability. Contractors’ PI wordings usually exclude injury and damage unless they result from negligent design, specification or advice.

After handover, a negligently designed fixing fails and a panel injures someoneBuilt for itNot built for itMay respond

Injury or damage caused by negligent design is where PI and liability cover meet. Many public and products liability policies exclude design or advice given for a fee, so the design claim usually sits with PI. We would notify both.

Poor workmanship is found, with no design error and no damageNot built for itNot built for itNot built for it

The cost of redoing your own defective work is a business risk that none of the three policies is built to pay. That is why the split between design and workmanship matters on every defect.

Built for itMay respondNot built for it

Contractors’ all risks explained: the works, materials and plant

Contractors’ all risks covers physical loss or damage to the contract works and, usually, site materials, temporary works and owned or hired plant while the project is being built.

-   **Who insures.** JCT’s Design and Build Contract offers three options: all risks insurance of new buildings by the contractor (Option A) or by the employer (Option B), and joint names insurance by the employer of existing structures and the works in them (Option C) ([JCT DB 2024, schedule 3](https://www.jctltd.co.uk/docs/contents-pages/DB-2024.pdf)).
-   **Defects.** Policies carry a defects exclusion. Its wording decides what is paid when a design or workmanship fault damages the works.
-   **Conditions.** Hot works, site security and, where the contract applies it, the Joint Fire Code.

Cover for the works usually ends around practical completion. Design liability does not.

Public and products liability explained: injury and damage to others

Public liability covers your legal liability for injury to third parties and damage to their property arising from your operations. Products liability does the same for what you have supplied or installed. JCT requires the contractor to insure its liability for personal injury and property damage ([JCT DB 2024, clause 6.4](https://www.jctltd.co.uk/docs/contents-pages/DB-2024.pdf)).

-   **Design exclusions.** Many liability policies exclude design or advice given for a fee. That is the boundary with PI.
-   **Your own work.** Liability policies pay for damage your work causes, not for redoing the work itself.
-   **Financial loss.** A claim with no injury or damage, such as a building that cannot be let, is usually outside public liability unless an extension is bought.

Employers’ liability is separate and compulsory for most employers, with a minimum of £5 million ([GOV.UK](https://www.gov.uk/employers-liability-insurance)). [The other covers we arrange](https://www.hammondpi.com/other-covers.md)

[The other covers we arrange](https://www.hammondpi.com/other-covers.md)

## Questions every firm asks

- [I am retiring. What happens to my PI?](https://www.hammondpi.com/insights/questions/#cq-1)
- [Does using AI invalidate my PI?](https://www.hammondpi.com/insights/questions/#cq-5)
- [Does my policy cover a freelancer or consultant who works for us?](https://www.hammondpi.com/insights/questions/#cq-9)
- [A client wants our liability cap raised to match our PI limit. Does that affect cover?](https://www.hammondpi.com/insights/questions/#cq-15)

[See all common questions](https://www.hammondpi.com/insights/questions.md)

_Guidance only. Cover depends on your own policy wording; speak to us about your position._

## Guides for design and build contractors

[Professional indemnity explainedGuide](https://www.hammondpi.com/insights/professional-indemnity-explained.md)[Fair presentationGuide](https://www.hammondpi.com/insights/fair-presentation.md)[The clause guideGuide](https://www.hammondpi.com/clauses.md)[Fire safety exclusionsGuide](https://www.hammondpi.com/insights/fire-safety-exclusions.md)[Principal designer: when to signGuide](https://www.hammondpi.com/insights/principal-designer-when-to-sign.md)[Contract reviewsGuide](https://www.hammondpi.com/contract-reviews.md)[Run off coverGuide](https://www.hammondpi.com/insights/run-off-cover.md)[Freelancers and subconsultantsGuide](https://www.hammondpi.com/insights/freelancers-and-sub-consultants.md)[Claims supportGuide](https://www.hammondpi.com/claims-support.md)

Proposal form

## Prefer to fill in a form?

Ask us for the appropriate proposal form, or send us your details when you request a quote.

Beyond the policy

## Claims support and contract reviews

If you receive a complaint or become aware of something that could lead to a claim, email [claims@hammondpi.com](mailto:claims@hammondpi.com), or call [0333 222 4257](tel:03332224257) if it is urgent or sensitive. We report the matter, follow up with the insurer and explain updates. If a deadline is near, follow the notification instructions in your policy immediately. Do not admit liability before speaking to us.

Before you sign, send us the building contract or subcontract amendments, the Employer’s Requirements on design and insurance, any novation agreement, collateral warranty or third party rights schedule, and the PI clause you are asked to accept. Highlight the wording that concerns you. We can flag insurance points to discuss with you and, where needed, your insurer. Your solicitor can advise on the legal effect. A review cannot guarantee cover for a claim.

[Claims support](https://www.hammondpi.com/claims-support.md)  ·  [Contract reviews](https://www.hammondpi.com/contract-reviews.md)

Review your cover

## Let a specialist read your PI cover

Send us your current schedules, wordings, endorsements and renewal information. Tell us about your design responsibility, fire safety history, dutyholder roles and any contract terms that worry you. We will tell you where the cover fits the design risk you carry, where it does not, and what we would change.

[Speak to a PI specialist](https://www.hammondpi.com/contact.md)[Send us your renewal](https://www.hammondpi.com/renewal.md)[Get a quote](https://www.hammondpi.com/quote/?profession=design-and-build-contractors.md)

-   Your PI schedule, policy wording and endorsements
-   Renewal date and your last proposal form
-   Turnover split by design and build, contractor’s design and construct only
-   Any fire safety or cladding exclusion, sub-limit or questionnaire
-   Your usual contract amendments, warranties and consultants’ appointments
-   Past notifications, open defects and anything that needs explaining