---
title: "Profession guides in full"
description: "Full text of Hammond PI profession guides: the questions firms ask about professional indemnity, the topics that matter and the clauses we check first."
url: "https://hpic-production.up.railway.app/who-we-cover/guides/"
updated: "2026-11-16T21:17:32.274Z"
---

[Home](https://hpic-production.up.railway.app/index.md) / [Who we cover](https://hpic-production.up.railway.app/who-we-cover.md) / Profession guides

# Profession guides in full

The full text of each launch profession page on one page: the questions we are asked, the topics that matter, how we work with insurers and the clauses we check first.

1.  [Architects](https://hpic-production.up.railway.app/who-we-cover/guides.md#guide-architects)
2.  [Town planners](https://hpic-production.up.railway.app/who-we-cover/guides.md#guide-town-planners)
3.  [Civil and structural engineers](https://hpic-production.up.railway.app/who-we-cover/guides.md#guide-civil-and-structural-engineers)
4.  [Geotechnical and tunnelling](https://hpic-production.up.railway.app/who-we-cover/guides.md#guide-geotechnical-and-tunnelling)
5.  [Acoustic consultants](https://hpic-production.up.railway.app/who-we-cover/guides.md#guide-acoustic-consultants)
6.  [Environmental consultants](https://hpic-production.up.railway.app/who-we-cover/guides.md#guide-environmental-consultants)
7.  [Accountants](https://hpic-production.up.railway.app/who-we-cover/guides.md#guide-accountants)

## [Architects](https://hpic-production.up.railway.app/who-we-cover/architects.md)

Architects

**PI for architects, checked against your appointments and warranties.**

An appointment can change several times between concept design and completion. A novation, a warranty or a return to site can change who relies on the practice and what it has promised.

**Construction technical guidance**

Design responsibility, contract terms, consultant PI, claims and how fire safety exclusions differ between insurers.

**The Hammond architects PI scheme**

See illustrative premiums for your turnover and limit, and download our architects premium guide.

Your map

### The architects map: risks, exposures and the policy features that matter

#### Risks and exposures (8)

-   Fire safety design (Read with: Endorsements)
-   Basements (Read with: Exclusions and write-backs)
-   Swimming pools (Read with: Exclusions and write-backs)
-   Cladding (Read with: Exclusions and write-backs)
-   International work (Read with: Definitions)
-   Large projects (Read with: Limit and excess)
-   Novation and design and build (Read with: Collateral warranties)
-   Inherited work and certification (Read with: Conditions)

#### Policy features that matter (4)

-   Fire safety endorsements and the retroactive date (Read with: Endorsements)
-   Collateral warranties and novation cover (Read with: Extensions)
-   Design and build contracting work (Read with: Definitions)
-   Run-off when the practice closes or merges (Read with: Run-off)

#### Not usually part of the picture (1)

-   Contract works

Select a point to light it on the map and read the note. The same points appear on the homepage Wording Map when this profession is chosen.

Questions and answers

### Questions architects may ask

1.  **A contractor wants us to sign a new appointment after novation. What should we send you?**
    
    Send the original appointment, the proposed novation agreement and any new warranty. Tell us who appointed you at each stage, what you designed and whether anyone is asking you to take responsibility for earlier work. That gives us the documents to compare with the duties described in your PI policy.
    
2.  **Which date should we check for fire-related design work?**
    
    Start with the design dates and the work your practice actually carried out. Send those alongside the policy schedule and any fire endorsement. The question for review is whether the dates and restrictions in those documents apply to that work. Flag any existing notification separately.
    
3.  **Another consultant designed part of the project. What should we tell you?**
    
    Identify who appointed the consultant, who prepared the drawings and what your practice agreed to check, coordinate or certify. Include the relevant appointments. This lets us distinguish the work each party did from the responsibility your practice accepted.
    

#### What matters to your practice

-   Fire safety restrictions and the years of design they reach
-   Collateral warranties, novations and fitness for purpose obligations
-   Basement, pool and cladding projects
-   Responsibility for design by subconsultants
-   Site inspections, certification and work inherited from another architect

#### How we work with insurers

We take the project chronology, appointment and fire responsibilities to specialist underwriters. That gives us a basis for challenging an endorsement and comparing the scope offered elsewhere.

Preparing for a review

### Preparing an appointment for review

-   Gather the proposed appointment, amendments and any warranty or novation agreement.
-   Mark who will rely on your work and which services you agreed to provide.
-   Note who designed, checked and certified any work shared with another consultant.
-   List the relevant design and appointment dates and flag any earlier notification separately.

Evidence

### From our reviews

No evidence item yet. This space is for a wording review, a contract review extract with permission, or a guidance note, once one is prepared and approved.

Proposal form

### Prefer to fill in a form?

Download the form, complete it in Word and upload it with your schedule on either quote route.

Beyond the policy

### Claims support and contract reviews

If you receive a complaint or become aware of something that might lead to a claim, contact us promptly with the correspondence and key dates. We can help you put the information together for your insurer, explain the notification steps and follow up on the response. Your insurer decides its position on cover under your policy.

Before you sign, send the proposed appointment or collateral warranty, any amendments and a short description of your role. Highlight the wording you have been asked to accept. We can flag insurance points to discuss with you and, where needed, your insurer. Your solicitor can advise on the legal effect. A review cannot guarantee cover for a claim.

[Claims support](https://hpic-production.up.railway.app/claims-support.md)  ·  [Contract reviews](https://hpic-production.up.railway.app/contract-reviews.md)

[Open the Architects page and get a quote](https://hpic-production.up.railway.app/who-we-cover/architects.md)

## [Town planners](https://hpic-production.up.railway.app/who-we-cover/town-planners.md)

Town planners

**PI for town planners, from first advice to appeal.**

A feasibility opinion prepared for one developer can later be relied on by a purchaser, lender or project team with a different purpose in mind.

Your map

### The town planners map: risks, exposures and the policy features that matter

#### Risks and exposures (6)

-   Reliance on appraisals by third parties (Read with: Clients, contracts and frameworks)
-   Prospects of consent versus promises (Read with: Skill and care v fitness for purpose)
-   Appeal and submission deadlines (Read with: Conditions)
-   Viability advice overlapping with valuation (Read with: Definitions)
-   Heritage and environmental specialists engaged by the planner (Read with: Sub-consultancy agreements)
-   Changes of client or scope during a project (Read with: Clients, contracts and frameworks)

#### Policy features that matter (4)

-   Third-party reliance within the policy (Read with: Extensions)
-   Planning, viability and expert witness work within the definition (Read with: Definitions)
-   Deadline and appeal circumstances: notification (Read with: Conditions)
-   RTPI requirements (Read with: RTPI requirements)

#### Not usually part of the picture (1)

-   Contract works

Select a point to light it on the map and read the note. The same points appear on the homepage Wording Map when this profession is chosen.

Questions and answers

### Questions town planners may ask

1.  **A purchaser wants to rely on our appraisal. What should we send?**
    
    Send the original instruction, the report and the proposed reliance letter. Identify the purchaser and the decision they intend to make. We can then compare the new request with the purpose and audience agreed when you prepared the appraisal.
    
2.  **A client wants us to confirm that consent will be granted. How should we raise this?**
    
    Send the exact sentence and the part of the appointment describing your role. An opinion on prospects and a promise of a particular outcome are different commitments. Flag that difference before signing so the proposed obligation can be considered alongside your policy.
    
3.  **Our viability report includes figures from a specialist. What detail matters?**
    
    Explain who produced the figures, whether you gave a valuation yourself, who appointed the specialist and what you agreed to check. Send the scope and the relevant part of the report. A description such as “planning consultancy” alone leaves those questions unanswered.
    

#### What matters to your practice

-   Reliance on planning appraisals by third parties
-   Advice on prospects versus promises of consent
-   Appeal and submission deadlines
-   Viability advice that overlaps with valuation
-   Environmental or heritage specialists engaged by the planner
-   Changes of client or scope during a project

#### How we work with insurers

We give specialist underwriters the appointment, proposed letter and intended use. That lets us negotiate around the actual undertaking and explain which contractual promises need revisiting.

Example

### An illustrative scenario

**Illustrative scenario**  
A purchaser asks for a reliance letter and a warranty that consent will be obtained. The two requests create different obligations even though they concern the same report.  
  
_Illustrative planning scenario. A request to rely on a report and a promise to secure consent need separate review. Not a client case, insurer response or outcome. Does not meet the evidence requirement; awaiting technical and compliance approval._

Proposal form

### Prefer to fill in a form?

Download the form, complete it in Word and upload it with your schedule on either quote route.

Beyond the policy

### Claims support and contract reviews

If you receive a complaint or become aware of something that might lead to a claim, contact us promptly with the correspondence and key dates. We can help you put the information together for your insurer, explain the notification steps and follow up on the response. Your insurer decides its position on cover under your policy.

Before you sign, send the proposed appointment or collateral warranty, any amendments and a short description of your role. Highlight the wording you have been asked to accept. We can flag insurance points to discuss with you and, where needed, your insurer. Your solicitor can advise on the legal effect. A review cannot guarantee cover for a claim.

[Claims support](https://hpic-production.up.railway.app/claims-support.md)  ·  [Contract reviews](https://hpic-production.up.railway.app/contract-reviews.md)

[Open the Town planners page and get a quote](https://hpic-production.up.railway.app/who-we-cover/town-planners.md)

## [Civil and structural engineers](https://hpic-production.up.railway.app/who-we-cover/civil-and-structural-engineers.md)

Civil and structural engineers

**PI for civil and structural engineers: who designed, checked and signed?**

A drainage layout can depend on levels supplied by someone else. A structural check can lead to a request to sign a certificate or advise during excavation. For a PI review, start with one project and show where your responsibility began, what others designed and what changed once work started on site.

**Construction technical guidance**

Design responsibility, contract terms, consultant PI, claims and how fire safety exclusions differ between insurers.

Your map

### The engineers map: risks, exposures and the policy features that matter

#### Risks and exposures (5)

-   Permanent and temporary works (Read with: Definitions)
-   Basements, underpinning and adjoining structures (Read with: Exclusions and write-backs)
-   Delegated design and others' information (Read with: Sub-consultancy agreements)
-   Site instructions and certification (Read with: Conditions)
-   Design and construct roles (Read with: Contract works)

#### Policy features that matter (4)

-   Temporary works and independent checks (Read with: Definitions)
-   Adjoining property and underpinning endorsements (Read with: Endorsements)
-   Aggregate limit against several live projects (Read with: Limit and excess)
-   Contract works alongside PI for design and construct (Read with: Contract works)

#### Not usually part of the picture (0)

-   Every point on the map is usually relevant to engineers.

Select a point to light it on the map and read the note. The same points appear on the homepage Wording Map when this profession is chosen.

Questions and answers

### Questions civil and structural engineers may ask

1.  **We designed the drainage but others set the site levels. What should we provide?**
    
    Bring the scope, the level information you received and the drawing issued for construction. Identify who coordinated the two designs and who approved later changes.
    
2.  **We checked another engineer’s design. Which documents explain our role?**
    
    Share the checking brief, your comments and the certificate you were asked to sign. Flag any statement covering the whole design when your check concerned only part of it.
    
3.  **We visited during excavation. How do we describe our involvement?**
    
    Provide the inspection scope and a sample visit record. Point out any instructions you gave and who could authorise a change or stop the works.
    

#### What matters to your practice

-   Drainage layouts, road levels and connections to existing infrastructure
-   Permanent works, temporary works and independent design checks
-   Basements, underpinning and adjoining structures
-   Inspection visits, site instructions and certification
-   Delegated design and information supplied by other consultants

#### How we work with insurers

A marked-up responsibility schedule and one worked project example give an underwriter a way to follow the job. They help frame precise questions about civil design, independent checking and the authority your engineers exercised on site.

Evidence

### From our reviews

No evidence item yet. This space is for a wording review, a contract review extract with permission, or a guidance note, once one is prepared and approved.

Proposal form

### Prefer to fill in a form?

Download the form, complete it in Word and upload it with your schedule on either quote route.

Beyond the policy

### Claims support and contract reviews

If you receive a complaint or become aware of something that might lead to a claim, contact us promptly with the correspondence and key dates. We can help you put the information together for your insurer, explain the notification steps and follow up on the response. Your insurer decides its position on cover under your policy.

Before you sign, send the proposed appointment or collateral warranty, any amendments and a short description of your role. Highlight the wording you have been asked to accept. We can flag insurance points to discuss with you and, where needed, your insurer. Your solicitor can advise on the legal effect. A review cannot guarantee cover for a claim.

[Claims support](https://hpic-production.up.railway.app/claims-support.md)  ·  [Contract reviews](https://hpic-production.up.railway.app/contract-reviews.md)

[Open the Civil and structural engineers page and get a quote](https://hpic-production.up.railway.app/who-we-cover/civil-and-structural-engineers.md)

## [Geotechnical and tunnelling](https://hpic-production.up.railway.app/who-we-cover/geotechnical-and-tunnelling.md)

Geotechnical and tunnelling

**PI for geotechnical and tunnelling work: from investigation to site decisions**

A borehole log records what was found at one location. A designer may then use that information to select support for an excavation or plan a tunnel drive. Describe which part your firm undertook, who operated the equipment and who could change the method on site. Those details give a PI enquiry a more useful starting point than the project title alone.

**Construction technical guidance**

Design responsibility, contract terms, consultant PI, claims and how fire safety exclusions differ between insurers.

Your map

### The geotechnical and tunnelling map: risks, exposures and the policy features that matter

#### Risks and exposures (5)

-   Factual logs, interpretive reports and sampling limits (Read with: Definitions)
-   Tunnel alignment, excavation support and design assumptions (Read with: Exclusions and write-backs)
-   Drilling, monitoring and authority to intervene on site (Read with: Contract works)
-   Settlement, vibration and groundwater near other property (Read with: Public and products liability)
-   Reliance on reports when the method changes (Read with: Clients, contracts and frameworks)

#### Policy features that matter (4)

-   Interpretive against factual reporting in the definition (Read with: Definitions)
-   Ground movement and pollution exclusions and write-backs (Read with: Exclusions and write-backs)
-   Costs inclusive limits on long projects (Read with: Limit and excess)
-   Site intervention and the contract works boundary (Read with: Contract works)

#### Not usually part of the picture (0)

-   Every point on the map is usually relevant to geotechnical and tunnelling.

Select a point to light it on the map and read the note. The same points appear on the homepage Wording Map when this profession is chosen.

Questions and answers

### Questions geotechnical and tunnelling firms may ask

1.  **We investigated the site but another firm designed the support. What should we send?**
    
    Provide the investigation brief, the report issued to the designer and any later advice. Identify where you set out sampling limits and gaps in the data.
    
2.  **We monitor movement during a tunnel drive. What will help explain the appointment?**
    
    Supply the monitoring plan and trigger levels. Say who reads the results, who receives an alert and who decides whether work continues.
    
3.  **The contract asks us to accept unforeseen ground conditions. What should we flag?**
    
    Provide the exact paragraph, your tender assumptions and the relevant ground information. Identify who selected the construction method and whether your responsibility changed after tender.
    

#### What matters to your practice

-   Factual logs, interpretive reports and sampling limits
-   Tunnel alignment, excavation support and design assumptions
-   Drilling, monitoring and authority to intervene on site
-   Settlement, vibration and groundwater drawdown near other property
-   Reliance on reports when the design or excavation method changes

#### How we work with insurers

A short chronology can connect an investigation finding to a design decision and a site instruction. If more than one insurance layer is proposed, use the same example to ask how each wording treats the alleged design error, physical damage and any resulting loss of income.

Evidence

### From our reviews

No evidence item yet. This space is for a wording review, a contract review extract with permission, or a guidance note, once one is prepared and approved.

Proposal form

### Prefer to fill in a form?

There is no proposal form for this profession yet. One will be added once an approved Hammond form is available. You can still get a quote below.

Beyond the policy

### Claims support and contract reviews

If you receive a complaint or become aware of something that might lead to a claim, contact us promptly with the correspondence and key dates. We can help you put the information together for your insurer, explain the notification steps and follow up on the response. Your insurer decides its position on cover under your policy.

Before you sign, send the proposed appointment or collateral warranty, any amendments and a short description of your role. Highlight the wording you have been asked to accept. We can flag insurance points to discuss with you and, where needed, your insurer. Your solicitor can advise on the legal effect. A review cannot guarantee cover for a claim.

[Claims support](https://hpic-production.up.railway.app/claims-support.md)  ·  [Contract reviews](https://hpic-production.up.railway.app/contract-reviews.md)

[Open the Geotechnical and tunnelling page and get a quote](https://hpic-production.up.railway.app/who-we-cover/geotechnical-and-tunnelling.md)

## [Acoustic consultants](https://hpic-production.up.railway.app/who-we-cover/acoustic-consultants.md)

Acoustic consultants

**PI for acoustic consultants: what was measured, specified or promised?**

A noise survey used for a planning application answers a different question from a sound insulation test on a finished building. A project may also move from prediction to specification and then to testing. Tell us which stages you undertook, how the performance target was set and whether the client later asked you to confirm that it had been achieved.

**Construction technical guidance**

Design responsibility, contract terms, consultant PI, claims and how fire safety exclusions differ between insurers.

Your map

### The acoustic consultants map: risks, exposures and the policy features that matter

#### Risks and exposures (5)

-   Baseline noise surveys and the conditions during measurement (Read with: Definitions)
-   Planning reports and prediction assumptions (Read with: Skill and care v fitness for purpose)
-   Facade, partition and services specifications (Read with: Exclusions and write-backs)
-   Changes to materials, equipment or installation details (Read with: Sub-consultancy agreements)
-   Completion testing and performance statements (Read with: Skill and care v fitness for purpose)

#### Policy features that matter (4)

-   Performance statements and fitness for purpose (Read with: Skill and care v fitness for purpose)
-   Specification and substitution exclusions (Read with: Exclusions and write-backs)
-   Testing and certification within the definition (Read with: Definitions)
-   Run-off years after completion testing (Read with: Run-off)

#### Not usually part of the picture (1)

-   Contract works

Select a point to light it on the map and read the note. The same points appear on the homepage Wording Map when this profession is chosen.

Questions and answers

### Questions acoustic consultants may ask

1.  **Our report predicts noise from proposed equipment. What should we bring?**
    
    Provide the brief, the equipment data and the assumptions about operating hours and location. Mark anything that changed after the prediction was issued.
    
2.  **A contractor substituted a partition detail. What will explain our role?**
    
    Share the original specification, the proposed change and your reply. Identify who approved the substitution and whether your appointment included inspecting the installation.
    
3.  **We tested selected rooms and were asked to sign for the whole building. What should we flag?**
    
    Provide the sampling brief, test report and requested certificate. Identify the rooms and conditions tested so the extent of the requested statement is clear.
    

#### What matters to your practice

-   Baseline noise surveys and the conditions during measurement
-   Planning reports and assumptions used in noise predictions
-   Façade, partition and building services specifications
-   Changes to materials, equipment or installation details
-   Completion testing, test locations and performance statements

#### How we work with insurers

The brief, one report and any requested certificate show where measurement ended and design advice began. Use them to ask about the services described in the PI terms and any uncertainty raised by a promised performance level.

Evidence

### From our reviews

No evidence item yet. This space is for a wording review, a contract review extract with permission, or a guidance note, once one is prepared and approved.

Proposal form

### Prefer to fill in a form?

Download the form, complete it in Word and upload it with your schedule on either quote route.

Beyond the policy

### Claims support and contract reviews

If you receive a complaint or become aware of something that might lead to a claim, contact us promptly with the correspondence and key dates. We can help you put the information together for your insurer, explain the notification steps and follow up on the response. Your insurer decides its position on cover under your policy.

Before you sign, send the proposed appointment or collateral warranty, any amendments and a short description of your role. Highlight the wording you have been asked to accept. We can flag insurance points to discuss with you and, where needed, your insurer. Your solicitor can advise on the legal effect. A review cannot guarantee cover for a claim.

[Claims support](https://hpic-production.up.railway.app/claims-support.md)  ·  [Contract reviews](https://hpic-production.up.railway.app/contract-reviews.md)

[Open the Acoustic consultants page and get a quote](https://hpic-production.up.railway.app/who-we-cover/acoustic-consultants.md)

## [Environmental consultants](https://hpic-production.up.railway.app/who-we-cover/environmental-consultants.md)

Environmental consultants

**PI for environmental consultants: what decision was your report written for?**

A buyer may commission an environmental appraisal before acquiring a site. A developer may later want to use the same report to discharge a planning condition or support a change of use. A useful PI review starts with the original purpose, the limits of the investigation and any further advice you agreed to give when the project changed.

Your map

### The environmental consultants map: risks, exposures and the policy features that matter

#### Risks and exposures (6)

-   Due diligence for acquisitions and disposals (Read with: Clients, contracts and frameworks)
-   Desk studies, historic uses and gaps in the records (Read with: Definitions)
-   Sampling strategies and laboratory scope (Read with: Exclusions and write-backs)
-   Remediation advice, monitoring and verification (Read with: Contract works)
-   Pollution and contamination claims (Read with: Exclusions and write-backs)
-   Reuse of findings for another site use or client (Read with: Clients, contracts and frameworks)

#### Policy features that matter (4)

-   Pollution exclusion write-back for advice (Read with: Exclusions and write-backs)
-   Reliance letters and reuse of reports (Read with: Extensions)
-   Verification reports and the retroactive date (Read with: Definitions)
-   Contract works boundary for remediation (Read with: Contract works)

#### Not usually part of the picture (0)

-   Every point on the map is usually relevant to environmental consultants.

Select a point to light it on the map and read the note. The same points appear on the homepage Wording Map when this profession is chosen.

Questions and answers

### Questions environmental consultants may ask

1.  **A lender wants to use our acquisition report. What should we send?**
    
    Provide the original brief, report limitations and the lender’s request. Explain the intended use and whether the site, proposed development or information available has changed.
    
2.  **A laboratory analysed samples for us. Which facts matter?**
    
    Identify who chose the sampling locations and substances to test, who collected the samples and who interpreted the results. Include the agreed scope and any limitations reported by the laboratory.
    
3.  **We prepared the remediation strategy and later issued a verification report. What should we flag?**
    
    Bring both instructions and the evidence used for the final report. Distinguish work you observed from records supplied by the contractor, and identify who signed off any changes.
    

#### What matters to your practice

-   Environmental due diligence for acquisitions and disposals
-   Desk studies, historic site uses and gaps in the records
-   Sampling strategies and the scope of laboratory analysis
-   Remediation advice, monitoring and verification reports
-   Requests to reuse findings for another site use, client or project stage

#### How we work with insurers

A timeline from initial appraisal to final report makes a change of role easier to see. Where contamination is relevant, describe the condition, the advice given and the responsibility accepted. Those facts help frame questions about pollution restrictions and the professional services described in the wording.

Evidence

### From our reviews

No evidence item yet. This space is for a wording review, a contract review extract with permission, or a guidance note, once one is prepared and approved.

Proposal form

### Prefer to fill in a form?

Download the form, complete it in Word and upload it with your schedule on either quote route.

Beyond the policy

### Claims support and contract reviews

If you receive a complaint or become aware of something that might lead to a claim, contact us promptly with the correspondence and key dates. We can help you put the information together for your insurer, explain the notification steps and follow up on the response. Your insurer decides its position on cover under your policy.

Before you sign, send the proposed appointment or collateral warranty, any amendments and a short description of your role. Highlight the wording you have been asked to accept. We can flag insurance points to discuss with you and, where needed, your insurer. Your solicitor can advise on the legal effect. A review cannot guarantee cover for a claim.

[Claims support](https://hpic-production.up.railway.app/claims-support.md)  ·  [Contract reviews](https://hpic-production.up.railway.app/contract-reviews.md)

[Open the Environmental consultants page and get a quote](https://hpic-production.up.railway.app/who-we-cover/environmental-consultants.md)

## [Accountants](https://hpic-production.up.railway.app/who-we-cover/accountants.md)

Accountants

**PI for accountants: who relies on the work?**

A lender asking to see a forecast may have a different purpose from the client who commissioned it. An acquired fee book can bring reporting deadlines that were agreed before your team took over. Start with the engagement letter, the services you actually deliver and who uses the finished work. That sets the context for a review of your PI arrangements.

Your map

### The accountants map: risks, exposures and the policy features that matter

#### Risks and exposures (5)

-   Audit and assurance engagements (Read with: Definitions)
-   Tax advisory assignments (Read with: Exclusions and write-backs)
-   Lender reports and third-party reliance (Read with: Clients, contracts and frameworks)
-   Outsourced payroll and payment instructions (Read with: Conditions)
-   Acquired fee books and earlier work (Read with: Run-off)

#### Policy features that matter (4)

-   Check the current PI rules of the body that regulates your practice, including any rules for authorised activities.
-   Fee recovery and employee dishonesty extensions (Read with: Extensions)
-   Third-party reliance and audit within the definition (Read with: Definitions)
-   Run-off on retirement or sale (Read with: Run-off)

#### Not usually part of the picture (4)

-   Collateral warranties
-   Sub-consultancy agreements
-   Skill and care v fitness for purpose
-   Contract works

Select a point to light it on the map and read the note. The same points appear on the homepage Wording Map when this profession is chosen.

Questions and answers

### Questions accountants may ask

1.  **A bank wants to rely on our forecast. What should we provide?**
    
    Send the original engagement, the forecast assumptions and the bank’s requested wording. Explain the decision the bank intends to make and any additional checks it expects.
    
2.  **We handle payroll but our client releases the payments. What detail matters?**
    
    Set out who prepares the figures, approves changes and releases funds. If a payroll provider is involved, include its scope and the agreed handover points.
    
3.  **We bought a fee book. How do we explain the change?**
    
    Give the transfer date, a summary of the work taken on and the arrangements for incomplete returns or filings. Flag any earlier matter already raised with an insurer.
    

#### What matters to your practice

-   Accounts preparation, audit and assurance engagements
-   Routine tax compliance and separate advisory assignments
-   Forecasts, lender reports and third-party reliance requests
-   Outsourced payroll, filing deadlines and payment instructions
-   Acquired fee books and responsibility for earlier work

#### How we work with insurers

An income split puts the scale of each service in context. A sample engagement or payment authority then shows how it works in practice. Where a concern involves diverted funds, identify whose money moved and how before asking which PI, crime or cyber terms need examination.

Evidence

### From our reviews

No evidence item yet. This space is for a wording review, a contract review extract with permission, or a guidance note, once one is prepared and approved.

Proposal form

### Prefer to fill in a form?

Download the form, complete it in Word and upload it with your schedule on either quote route.

Beyond the policy

### Claims support and contract reviews

If you receive a complaint or become aware of something that might lead to a claim, contact us promptly with the correspondence and key dates. We can help you put the information together for your insurer, explain the notification steps and follow up on the response. Your insurer decides its position on cover under your policy.

Before you sign, send the proposed appointment or collateral warranty, any amendments and a short description of your role. Highlight the wording you have been asked to accept. We can flag insurance points to discuss with you and, where needed, your insurer. Your solicitor can advise on the legal effect. A review cannot guarantee cover for a claim.

[Claims support](https://hpic-production.up.railway.app/claims-support.md)  ·  [Contract reviews](https://hpic-production.up.railway.app/contract-reviews.md)

[Open the Accountants page and get a quote](https://hpic-production.up.railway.app/who-we-cover/accountants.md)
