Project managers

# Professional indemnity for project managers

Professional indemnity for project managers, employer’s agents and contract administrators, read clause by clause. We know where your claims start: the letter of intent, the late notice, the optimistic programme report, the dutyholder role nobody appointed you to, and the cap in your appointment.

[Speak to a PI specialist](https://www.hammondpi.com/contact.md)[Send us your renewal for review](https://www.hammondpi.com/renewal.md)[Get a quote](https://www.hammondpi.com/quote/?profession=project-managers.md)

-   **Since 1990**Specialist PI brokers
-   **30+ insurers**Plus specialist agencies and Lloyd’s
-   **4.9 out of 5**From 228 Google reviews
-   **FCA authorised**FRN 302911, independently owned

On this page

-   Your map
-   Our experience
-   Who requires PI
-   Claim scenarios
-   Inside the wording
-   Duties and dutyholders
-   Specialist work
-   Your presentation
-   Consultancy changes
-   D&O and cyber
-   Questions
-   Forms and claims

Your map

## The project managers map: from your work to the policy and beyond

Your consultancy’s work on one side, the policy on the other. Select a point to see what it connects to, then follow the link to the part of this page that explains it.

Still 3D render (motion off)

### The map, area by area

Each heading below is one area of the map, and the number shows how many points it holds. Open a heading and tap any point: it lights up on the map with everything it connects to, and a short note explains why.

### Practice and business risks 11

-   
-   
-   
-   
-   
-   
-   
-   
-   
-   
-   

### Your terms and framework agreements 8

-   
-   
-   
-   
-   
-   
-   
-   

### Appointments and contracts 6

-   
-   
-   
-   
-   
-   

### Legislation 3

-   
-   
-   

### Policy documents and schedule 10

-   
-   
-   
-   
-   
-   
-   
-   
-   
-   

### Main policy wording 8

-   
-   
-   
-   
-   
-   
-   
-   

### Exclusions and restrictions 3

-   
-   
-   

### Succession, closure and earlier work 4

-   
-   
-   
-   

### Other insurance and final assessment 8

-   
-   
-   
-   
-   
-   
-   
-

Our experience

## Why project managers come to a specialist

The letter of intent that was never replaced by a contract. The notice that went out a day late. The monthly report that stayed green. Project managers are blamed when cost, time or compliance slips, and employer’s agent, contract administrator, NEC Project Manager, development manager and dutyholder roles each change what the policy must do.

Your appointment, not your job title, sets what a policy must answer. Hammond PI has been a professional indemnity specialist since 1990, and we check how the wording defines your business, treats adjudication, fire safety, dutyholder roles and warranties, groups related claims and meets RICS minimum terms where they apply. Insurers then see your roles appointment by appointment.

An extension of time referred to adjudication, a missed reply to a quotation or a contractor’s failure with no bond in place: we notify insurers, track the deadlines with you, gather the appointment, reports and notices, and stay to the end.

1.  **The work**Project management, employer’s agent, contract administration, development management and dutyholder roles, in their real proportions
2.  **What can go wrong**A letter of intent never replaced by a contract, a missed notice, an overrun reported late
3.  **What the policy must answer**Insuring clause, adjudication terms, fire safety, contractual liability, warranties, aggregation, excess and past work
4.  **How we present it**A clear submission by role and project, appointments summarised, questions answered, wordings compared across insurers

Who requires PI

## Check the minimum RICS requires, and what APM and CIOB ask for

Project management has no single regulator. RICS sets a fixed scale for the firms it regulates: enter your turnover for the preceding year to see it. APM and CIOB set no minimum, so your appointments and warranties usually decide the limit you must hold.

Type in your turnover for the preceding year to see the minimum limit, the excess rule and the run off required when you stop under [the RICS PII requirements](https://www.rics.org/regulation/regulatory-compliance/professional-indemnity/pii-in-the-uk).

RICS sets the least a regulated firm may hold. A funder’s warranty or a large appointment usually decides the limit you really need.

Whose rules RICS

Turnover in the preceding year

See the rules below.

The rules side by side

PI requirements: Who requires PI

Who

Minimum cover

Excess

After you stop

Other conditions

Royal Institution of Chartered Surveyors (regulated firms)

Turnover in the preceding year of £100,000 or less: £250,000. £100,001 to £200,000: £500,000. £200,001 and above: £1,000,000. A new firm uses its estimated turnover. Basis: any one claim, or aggregate with unlimited round the clock reinstatement. Asbestos, pollution and fire safety cover can be in the aggregate.

Limit of £10,000,000 or less: no more than the greater of 2.5% of the sum insured or £10,000, each and every claim. Above £10,000,000: no set limit.

Fully retroactive run off when the firm stops. Consumer claims: £1,000,000 in all for six years. Other claims: adequate and appropriate cover, expected for at least six years.

A RICS listed insurer, on the RICS minimum policy wording or wider, on a full civil liability basis. Defence costs in addition to the limit, except for asbestos, pollution and fire safety. Fully retroactive, except that fire safety cover for buildings of five storeys and above may carry a retroactive date of 1 July 2024 or later.

Association for Project Management

No PI requirement. The Code of Professional Conduct binds members and Chartered Project Professionals and does not mention insurance.

Not specified

Not specified

No listed insurers or minimum wording. The Code does require members to act with due skill, care and diligence, to claim expertise only where their skills are demonstrably adequate, and to be accurate in reporting and realistic in forecasting.

Chartered Institute of Building (Chartered Building Consultancy scheme)

No fixed minimum. A consultancy applying to the scheme must send its relevant insurance certificates, and the rules name professional indemnity as an example.

Not specified

Not specified

No listed insurers or minimum wording in the scheme rules.

Sources: [RICS (PII requirements Version 11, with effect from 1 July 2025)](https://www.rics.org/regulation/regulatory-compliance/professional-indemnity/pii-in-the-uk), [APM (Code of Professional Conduct as published on 20 November 2026)](https://www.apm.org.uk/about-us/how-apm-is-run/apm-code-of-professional-conduct/), [CIOB (Scheme rules, first revision 1 April 2020)](https://www.ciob.org/media/497/download). Consultancies answering to more than one must meet each set of rules.

Why the minimum is rarely the right limit

The RICS scale stops at £1 million for any firm with turnover above £200,000, and APM and CIOB set no figure at all. A project manager’s fee is a small fraction of the project it manages. A delayed completion, an unsigned contract or a missing bond can cost the client many times that fee, and appointments often require a stated limit for twelve years. Set the limit by your largest project and the roles you hold.

Claim scenarios

## When a claim arrives: how we would handle it

Project management claims often trace back to paperwork: an unsigned contract, a missed reply, a report that stayed green. Pick a scenario to see the risk and our approach.

### Works run on letters of intent and the contract is never signed

The situationYou project manage a £9 million school building. To hold the start date the contractor begins under a letter of intent, then a second, then a fifth. The works finish five months late. With no signed contract the client cannot enforce its liquidated damages clause, and its solicitors say you should have warned it.

The riskRelying on the cap in your appointment and saying so to the client. In the Ampleforth Abbey case a cap at the level of the fees failed because the same appointment required £10 million of cover. Insurers need the full exposure, and a letter arguing the cap is not yours to send.

Our strategy

1.  Notify insurers at the first letter, with the appointment, every letter of intent, your reports and the advice you gave about signing the contract.
2.  Report the full potential loss, not the capped figure. Whether a cap is reasonable is a question of law, and insurers must hear the worst case.
3.  Make no admission and do not offer to waive fees. Leave the argument about the cap to panel solicitors.
4.  Build the chronology of what held up signature: who was asked for what, when, and what you told the client about the risk of carrying on.
5.  Have causation tested early: would the contractor have signed if pressed, and on what terms? The claim may be for a lost chance, not the whole sum.

What we aim forCover intact, the claim measured by the real chance of a signed contract that was lost, and the cap argued by lawyers, not asserted by you.

The lesson**Every letter of intent needs an expiry date, a value limit and written advice on its risks.**

### A quotation goes unanswered and the contractor says your silence accepted it

The situationYou are the named Project Manager on a £14 million infrastructure contract. A team member leaves, and a compensation event quotation for £620,000 sits unanswered past the contract period. The contractor says the contract now treats it as accepted. The client refuses to pay the difference and tells you the cost is yours.

The riskWriting to the contractor to argue the quotation was never valid, or to the client to apologise. Both letters become evidence. The client’s statement is already a claim or a circumstance, and if either side starts an adjudication many wordings need notice within two working days.

Our strategy

1.  Notify insurers the same day with the contract data, the quotation, the reply periods and the client’s message, so the matter is on record before anything else is written.
2.  Ask insurers to agree who answers the contractor and in what terms. Whether silence means acceptance depends on the contract’s own notice steps, and panel solicitors should check each one.
3.  Separate two figures: what the event was really worth on a proper assessment, and the excess over that. Only the excess is loss the missed reply caused.
4.  Audit every other open quotation, programme and notice on the contract at once, and tell insurers what you find, so one missed date does not become several claims.
5.  Read the series of claims wording, in case more missed replies come to light, to see whether one excess applies or several.

What we aim forCover protected, the client’s loss limited to any real overpayment, and the remaining contract dates brought back under control.

The lesson**Reply periods run whether or not the person named is at their desk. Diarise them centrally.**

### The contractor fails and the bond and warranties were never collected

The situationThe building contract required a 10% performance bond, sub-contractor warranties and proof of the contractor’s insurance. As project manager you listed them as outstanding in early reports, then the item dropped off. The contractor enters administration at month eleven. There is no bond, and the cladding sub-contractor never gave a warranty.

The riskTelling the client the documents were its solicitors’ job. The court in the Ampleforth Abbey case recalled an earlier ruling that a project manager had a duty to ensure the contractor’s required insurances were in place, and could not simply act as a post box.

Our strategy

1.  Notify insurers when the contractor fails and the gap is found, before the client frames a demand, enclosing the appointment and the reports that tracked the documents.
2.  Establish scope from the appointment: who was to obtain, check and chase the bond, warranties and insurance evidence, and what the client was told while they stayed outstanding.
3.  Mitigate with insurers’ agreement: ask the administrator and the sub-contractors whether warranties can still be given, and whether the contractor’s insurer was on risk.
4.  Value the loss properly. A bond would have paid no more than its stated sum, and a warranty is worth only what the sub-contractor and its insurer can pay.
5.  Check whether payments were certified after the bond was due. That is a separate allegation and should be notified with the first.

What we aim forThe claim confined to what the missing documents would really have recovered, with late warranties obtained where they still can be.

The lesson**Keep a live schedule of bonds, warranties and insurances, and report it every month until it is empty.**

### No principal designer was appointed and the client says it was you

The situationOn a seven storey residential scheme the client appointed nobody in writing as principal designer under the building regulations. You chaired the design meetings, tracked the compliance documents and signed a compliance statement. The regulator rejects the completion application. The client says you held the role and claims its delay costs.

The riskArguing the point with the regulator or the client before insurers are told. Two cover questions come first: whether a principal designer role sits within the professional business you declared, and whether the fire safety clause applies, which can mean an aggregate limit, a negligence trigger or no cover.

Our strategy

1.  Notify insurers at once, describing the building, your appointment, what you signed and every party who has written, so that later claims attach to this policy year.
2.  Read the business description and the fire safety clause with us before anything is sent, and ask insurers to confirm how they treat the role you are said to have held.
3.  Give panel solicitors the regulations’ own answer: where a client makes no appointment, the client must fulfil the principal designer’s duties until someone is appointed.
4.  Ask insurers about the legal defence costs extension. If the regulator investigates, representation may be covered under a separate, smaller limit, and fines are not.
5.  Stop acting in the disputed role until it is settled in writing: a competent designer properly appointed, or your own appointment on terms insurers have agreed.

What we aim forCover confirmed for the role alleged, the statutory default placed where the regulations put it, and no further drift while the dispute runs.

The lesson**Never sign a compliance statement for a role you were not appointed to in writing.**

### Building control approval takes far longer than your programme allowed

The situationYour master programme for a nine storey block allowed twelve weeks for building control approval before work could start. The first application is rejected as incomplete, and approval arrives seven months late. The developer’s finance costs mount, its contractor claims for the delayed start, and it says your programme advice was negligent.

The riskDefending the programme by blaming the design team in open correspondence. That invites cross claims and gives away points insurers would want argued carefully. The claim may also be treated as fire safety related under the wording, with a lower aggregate limit and defence costs inside it.

Our strategy

1.  Notify insurers at the first complaint, with the appointment, each issue of the programme, the risk register and what you told the client about the approval period.
2.  Show what the programme said. Twelve weeks is the regulator’s period to decide a valid application, unless a longer one is agreed. It was never a promise of approval.
3.  Establish who assembled the application and who reviewed it for completeness. Under the regulations the client applies, and the appointments decide who did the work.
4.  Ask insurers to protect contribution rights against the designers whose information was rejected, and check that no appointment term or settlement has given those rights away.
5.  Read how widely the fire safety clause is drawn, and agree with insurers which section responds before defence costs are spent.

What we aim forThe claim tested against what you advised at the time, responsibility shared with those who prepared the application, and the right policy section identified early.

The lesson**Show regulatory approval as a risk with a range, in writing, on every programme.**

### Monthly reports stayed green while the project slid six months

The situationAs client side project manager on a hotel refurbishment you issued monthly reports showing completion on time. The contractor’s own programme had been slipping since month four. At month ten you report a six month delay. The owner has taken bookings and signed an operator agreement, and claims its lost revenue from you.

The riskReissuing earlier reports with “clarifications”, or sending the owner a long defence. In Great Eastern Hotel v John Laing the court found a construction manager had submitted incorrect information about delays, and held it responsible for the losses the delay caused. Your reports are the evidence. Leave them as they are.

Our strategy

1.  Notify insurers before replying, with the appointment, every report, the contractor’s programmes and your site notes, and preserve all emails and drafts.
2.  Fix the date from which a competent project manager would have reported the slippage. Only decisions the owner took after that date can count as loss.
3.  Ask what the owner would have done with earlier warning: moved the bookings, paid to accelerate, or carried on? Loss it would have suffered anyway is not yours.
4.  Separate the delay itself, which is the contractor’s, from the loss caused by not knowing about it. Insurers will want that distinction made from the first letter.
5.  Expect fees to be withheld. Recovering fees is outside the policy but the counterclaim is not, so agree the approach with insurers before issuing any fee claim.

What we aim forA defence built on what earlier reporting would really have changed, with the contractor’s delay kept apart from the project manager’s share.

The lesson**A report is advice. If the programme is slipping, say so in the month you see it.**

### You refuse an extension of time and an adjudicator overturns it

The situationAs contract administrator you refused the contractor’s claim for a fourteen week extension, after the employer made clear it expected a firm line. The employer deducted liquidated damages. An adjudicator awards the full extension, and the employer must repay the damages with interest and costs. It now says your assessment was negligent.

The riskAssuming that following the client’s wishes protects you. A certifier must decide independently, impartially, fairly and honestly, even though the employer pays it. Emails showing the client shaped the decision help neither of you, and the next adjudication may name you.

Our strategy

1.  Notify insurers when the decision arrives and the employer first blames you. If a notice of adjudication names you, tell us that day: many wordings allow two working days.
2.  Gather the contractor’s notices, your assessment, the programme analysis you relied on and every exchange with the employer about the decision.
3.  Have panel solicitors separate the heads of loss. Damages repaid were never the employer’s to keep if the extension was due. The real loss is usually interest and costs.
4.  Ask insurers before you help the employer challenge the decision or run the dispute again, so that your support counts as mitigation and not as an admission.

What we aim forThe claim reduced to the loss a wrong assessment really caused, and the certifier’s independence shown from the file.

The lesson**When you certify, record your reasons and keep the client’s wishes out of them.**

Illustrative scenarios. How any real claim is handled depends on the facts, the policy wording and insurers’ agreement.

### Four things project managers should know about PI

The date of the work and the date of the claim are different

A claim today may concern advice, a report or a certificate given several years ago. PI is written on a claims made basis: the policy in force when the claim is made responds, provided the work falls after the retroactive date and nothing was already notified under an earlier policy.

Year 1Year 2Year 3Year 4Year 5

**Programme advice given****Overrun discovered****Client claims**This year’s policy responds

Claims made cover: the policy in force when the claim is made is the one that responds.

A valid notification of circumstances can connect a later claim to an earlier policy. That is why continuity matters when you change insurers or stop a particular service. [How claims made cover works](https://www.hammondpi.com/insights/professional-indemnity-explained.md)

A cap in your appointment may not hold

Most project managers cap their liability, and a cap may have to pass the reasonableness test in the Unfair Contract Terms Act. Where liability is limited to a set sum, the court looks in particular at the resources you could expect to have and how far it was open to you to insure ([Unfair Contract Terms Act 1977, section 11](https://www.legislation.gov.uk/ukpga/1977/50/section/11)). In _Ampleforth Abbey Trust v Turner & Townsend_ a cap at the level of the fees paid, £111,321, was held unreasonable because the same appointment required £10 million of professional indemnity cover ([\[2012\] EWHC 2137 (TCC)](https://caselaw.nationalarchives.gov.uk/ewhc/tcc/2012/2137)). Agree a cap that sits sensibly beside the cover you promise, and draw it to the client’s attention.

If nobody is appointed, the dutyholder role does not disappear

Where a project has more than one contractor, the client must appoint a principal designer in writing under both CDM 2015 and the building regulations. If it does not, the client must fulfil that role’s duties itself ([CDM 2015, regulation 5](https://www.legislation.gov.uk/uksi/2015/51/regulation/5); [Building Regulations 2010, regulation 11D](https://www.legislation.gov.uk/uksi/2010/2214/part/2A)). Clients lean on their project manager to fill the gap. But a principal designer must be a designer with control over the pre-construction phase, and nobody may accept the role without the competence to perform it. If you take it on, your policy’s business description must include it. If you do not, say so in writing and advise the client to appoint.

How your limit of indemnity works

Two unrelated covered claims of £750,000 each come to £1.5 million. Under a £1 million limit in the aggregate, the policy pays up to £1 million for the year in total. Under a £1 million limit for each and every claim, each claim has its own £1 million, subject to the policy’s aggregation wording and other terms.

£1 million in the aggregate

Covered £1mNot covered £500k

£1 million each and every claim

Claim 1 £750k

Claim 2 £750k

The same two claims under an aggregate limit and an each and every claim limit.

Then check whether defence costs are paid in addition to the limit or use it up, and when the excess applies.

Inside the wording

## Twelve clauses that decide project managers’ claims

A consultant who builds nothing can still meet a construction exclusion. These are the twelve clauses that decide most project management claims, explained for the roles you hold, with what we check.

Insuring clause and “professional business”

What it doesMost wordings cover civil liability arising from the ordinary conduct of your professional business, defined by the kind of firm named in the schedule and by what you told insurers.

For a project manager“Project management” is not a closed list of services. Principal designer, employer’s agent, development management and funder monitoring roles may be said to fall outside it unless they were declared.

What we checkThe business description against every role in your live appointments, including appointments held in a personal name.

Construction and supply

What it doesExcludes liability arising from building, installing or supplying where you, a connected company or your sub-contractor has contracted to do that work.

For a project managerConstruction management and development management sit close to this line. If you place trade contracts or orders in your own name, insurers may treat you as a contractor.

What we checkWhether you ever contract as principal, whether a connected company builds, and how the wording treats each.

Contractual liability

What it doesExcludes duties more onerous than the law would imply, together with liquidated damages, penalties and guarantees.

For a project managerAn appointment that promises completion by a date or within a budget, or passes the client’s liquidated damages to you, can be uninsured even where your management was careful.

What we checkEach appointment for absolute obligations, indemnities, fee abatement tied to delay and uncapped liability before you sign.

Collateral warranties

What it doesWarranties are usually covered if the benefit is no greater and no longer lasting than your client has, but not fitness for purpose, performance guarantees or completion dates.

For a project managerFunders, purchasers and tenants each want a warranty from the project manager. One that outlasts or exceeds the appointment may be only partly insured.

What we checkDuration, assignment, step in rights, net contribution and the insurance promise in every warranty and third party rights schedule.

Adjudication

What it doesCovers adjudication only if insurers are told within two working days of a notice, or of learning one is intended, the adjudicator is independent, and the timetable is no tighter than the statutory Scheme.

For a project managerYour own appointment can be adjudicated. You are also the first to hear of adjudications between employer and contractor about your certificates, which can become claims against you.

What we checkThe notice period, the adjudication clause in each appointment, and that everyone in the team knows to call the same day.

Fire safety

What it doesSome wordings exclude claims in any way related to the fire safety of a building. Others give limited cover: in the aggregate, with defence costs inside the limit and a later retroactive date.

For a project managerYou design nothing, but claims about compliance statements, completion and gateway delay on residential blocks can all be drawn into the definition.

What we checkWhether fire safety is excluded or limited, the height threshold, the retroactive date and what has already been notified.

Loss of rights of recovery

What it doesExcludes or limits cover where an agreement you made has restricted your right to recover from someone else.

For a project managerProject managers who engage planners, cost consultants or clerks of works as sub-consultants sometimes accept their caps and waivers without noticing what that does to their own cover.

What we checkCaps and waivers in sub-consultant terms and joint venture agreements, and that each sub-consultant holds its own cover.

Notification of claims and circumstances

What it doesRequires notice as soon as reasonably possible of a claim, a threat of one, or a circumstance, including a shortcoming you know of that the client does not. Notice must arrive in or shortly after the period.

For a project managerA slipping programme not yet reported, a missed reply, an unsigned contract, a contractor insolvency or withheld fees can each be a circumstance long before a letter of claim.

What we checkWhat counts as a circumstance, the deadline after expiry, and what the wording does about late notice.

Series of claims and excess

What it doesThe limit applies to any one claim, or a series of claims arising from one originating cause or source. The excess can apply to each claimant where there are several.

For a project managerOne failed notice system can touch several projects. One late project can bring claims from the client, its funder and its purchasers.

What we checkThe aggregation words, read with whether your limit is any one claim or aggregate, and how the excess is counted.

Defence costs and regulatory proceedings

What it doesDefence costs are usually paid in addition to the limit. Many wordings also pay legal costs of defending health and safety, CDM or building regulation proceedings, under a separate aggregate limit, with insurers’ consent. Fines are not covered.

For a project managerDutyholder roles bring the regulator as well as the claimant. The investigation often comes first and shapes the civil claim.

What we checkThe sub-limit, whether consent is needed before solicitors are instructed, and when cover for a prosecution stops.

Fees

What it doesMany wordings exclude claims for the return or reduction of fees, and allegations of overcharging.

For a project managerA client unhappy with delay often withholds fees first and answers your invoice with a counterclaim. The counterclaim is a PI matter. Recovering the fee is not.

What we checkHow fee disputes, set off and counterclaims are treated, and when a fee dispute should be notified.

Directorships and joint ventures

What it doesExcludes claims against you as a director or officer of any company, and limits joint venture cover to claims arising from your own professional business.

For a project managerDevelopment managers and project directors are often asked to join the board of the client’s project company. Decisions taken there are not professional services under the policy.

What we checkAny board seats your people hold, how joint ventures are declared, and whether each venture needs its own cover.

[The clause guide: how each part of a PI policy works](https://www.hammondpi.com/clauses.md)

Duties and dutyholders

## What the law expects of the person managing the project

### Managing, certifying and paying

-   **Guardian of the client’s interests.** A project manager owes the skill and care of a reasonably competent member of the profession. The courts describe the role as co-ordinator and guardian of the client’s interests, not a post box passing documents on without comment ([Ampleforth Abbey Trust v Turner & Townsend](https://caselaw.nationalarchives.gov.uk/ewhc/tcc/2012/2137)).
-   **Get the contract signed.** In the same case the project manager was liable for letting works run on repeated letters of intent. A competent project manager would have advised that further letters were inappropriate and that every effort should go into executing the contract ([\[2012\] EWHC 2137 (TCC)](https://caselaw.nationalarchives.gov.uk/ewhc/tcc/2012/2137)).
-   **Certifying fairly.** When deciding payments, extensions of time and completion, a certifier engaged by the employer must act independently, impartially, fairly and honestly ([Scheldebouw v St James Homes](https://caselaw.nationalarchives.gov.uk/ewhc/tcc/2006/89)). In _Costain v Bechtel_ the court thought it at least arguable that an NEC project manager assessing sums due must act impartially ([\[2005\] EWHC 1018 (TCC)](https://caselaw.nationalarchives.gov.uk/ewhc/tcc/2005/1018)).
-   **Notices and adjudication.** Without a payment or pay less notice in time, the notified sum must be paid ([Construction Act 1996, sections 110A to 111](https://www.legislation.gov.uk/ukpga/1996/53/part/II/crossheading/payment)), and the true value adjudicated only afterwards ([S&T v Grove](https://caselaw.nationalarchives.gov.uk/ewca/civ/2018/2448)). A dispute can be referred at any time, for decision within 28 days unless extended ([section 108](https://www.legislation.gov.uk/ukpga/1996/53/section/108)).

### Dutyholders, time limits and sharing liability

-   **Client and principal designer.** Where there is more than one contractor the client must appoint a principal designer and principal contractor in writing. If it does not, the client must fulfil their duties ([CDM 2015, regulation 5](https://www.legislation.gov.uk/uksi/2015/51/regulation/5); [Building Regulations 2010, Part 2A](https://www.legislation.gov.uk/uksi/2010/2214/part/2A)). Nobody may accept either role without the competence it requires.
-   **Gateways.** Work on a higher-risk building cannot start until the regulator grants building control approval ([Higher-Risk Buildings Procedures Regulations 2023, regulation 3](https://www.legislation.gov.uk/uksi/2023/909/regulation/3)). The regulator has 12 weeks to decide a valid application, and 8 weeks for a completion certificate, unless longer is agreed ([regulation 5](https://www.legislation.gov.uk/uksi/2023/909/regulation/5), [regulation 41](https://www.legislation.gov.uk/uksi/2023/909/regulation/41)).
-   **Six, twelve, fifteen and thirty years.** Contract claims run six years, or twelve under a deed. Negligence has a fifteen year long stop (Limitation Act 1980, [section 5](https://www.legislation.gov.uk/ukpga/1980/58/section/5), [section 8](https://www.legislation.gov.uk/ukpga/1980/58/section/8), [section 14B](https://www.legislation.gov.uk/ukpga/1980/58/section/14B)). Defective Premises Act claims run 15 years, or 30 for rights arising before 28 June 2022 ([Building Safety Act 2022, section 135](https://www.legislation.gov.uk/ukpga/2022/30/section/135)).
-   **Net contribution.** Anyone liable for damage can claim a contribution from others liable for the same damage ([Civil Liability (Contribution) Act 1978](https://www.legislation.gov.uk/ukpga/1978/47/section/1)), which is worth little if they are insolvent. A net contribution clause limits you to your fair share. The Court of Appeal upheld one in _West v Ian Finlay_ ([\[2014\] EWCA Civ 316](https://caselaw.nationalarchives.gov.uk/ewca/civ/2014/316)).

### Court decisions behind these points

\[2012\] EWHC 2137 (TCC)

### Ampleforth Abbey Trust v Turner & Townsend Project Management

A project manager was liable for letting works proceed on repeated letters of intent. A cap at the level of its fees was unreasonable beside a £10 million insurance obligation.

[Read the judgment](https://caselaw.nationalarchives.gov.uk/ewhc/tcc/2012/2137)

\[2005\] EWHC 181 (TCC)

### Great Eastern Hotel v John Laing Construction

A construction manager owes a professional’s duty of skill and care, not a guarantee of the trade contractors’ performance. It was liable for delay its failure to manage caused.

[Read the judgment](https://caselaw.nationalarchives.gov.uk/ewhc/tcc/2005/181)

\[2017\] EWCA Civ 254

### Lejonvarn v Burgess

A professional who project managed a friend’s works with no contract and no fee still owed a duty of care in tort for the services she actually performed.

[Read the judgment](https://caselaw.nationalarchives.gov.uk/ewca/civ/2017/254)

\[2006\] EWHC 89 (TCC)

### Scheldebouw v St James Homes (Grosvenor Dock)

A certifier must act independently, impartially, fairly and honestly. An employer cannot appoint itself to the role without express words.

[Read the judgment](https://caselaw.nationalarchives.gov.uk/ewhc/tcc/2006/89)

\[2005\] EWHC 1018 (TCC)

### Costain v Bechtel

On an interim application, it was at least properly arguable that a project manager under an NEC form must act impartially when assessing sums due to the contractor.

[Read the judgment](https://caselaw.nationalarchives.gov.uk/ewhc/tcc/2005/1018)

\[2006\] EWHC 5 (TCC)

### Plymouth & South West Co-operative Society v Architecture, Structure & Management

Consultants should have advised that design and phasing were not advanced enough to enter into the building contract, which was let almost entirely on provisional sums.

[Read the judgment](https://caselaw.nationalarchives.gov.uk/ewhc/tcc/2006/5)

These decisions explain where a professional’s duty lies. They do not decide whether a particular policy responds.

Specialist work

## The work that changes your cover

Dutyholder roles under the building regulations, and the gateway approvals your programme depends on, have changed fastest, so they open the list. The others are the roles and promises insurers ask about once they see “project management” on a form.

Dutyholder roles: client duties, principal designer and the gaps between

The building regulations in England now place duties on clients, designers and contractors, not only on tall buildings. The client must make suitable arrangements for planning, managing and monitoring the project, and must appoint a principal designer and principal contractor in writing where there is more than one contractor ([Building Regulations 2010, regulations 11A and 11D](https://www.legislation.gov.uk/uksi/2010/2214/part/2A)). These roles sit beside the CDM 2015 roles of the same name, which concern health and safety. One person can hold both, but the client must confirm it in writing ([GOV.UK, meeting building requirements](https://www.gov.uk/guidance/design-and-building-work-meeting-building-requirements)).

Project managers are exposed in three ways: by accepting a principal designer appointment, by carrying out the client’s duties for it, and by drifting into either with no appointment at all. The same guidance says a principal designer must be part of the design team, not a third party without influence over design decisions.

-   **What we ask.** Which dutyholder roles you hold, on which buildings, and under what written terms.
-   **What we check.** That the business description names them, and how the fire safety clause treats them.
-   **What you sign.** Compliance statements and declarations, and whether your appointment says you give them.

Gateways on higher-risk buildings: what does your programme promise?

A higher-risk building has at least seven storeys or is at least 18 metres high, with at least two residential units or use as a hospital or care home. Work cannot start until the Building Safety Regulator grants building control approval, and work without approval is a criminal offence ([GOV.UK, building control approval for higher-risk buildings](https://www.gov.uk/guidance/building-control-approval-for-higher-risk-buildings)). The regulator has 12 weeks to decide a valid application, 6 weeks for a change control application and 8 weeks for a completion certificate, unless longer is agreed ([Higher-Risk Buildings Procedures Regulations 2023, regulation 5](https://www.legislation.gov.uk/uksi/2023/909/regulation/5), [regulation 22](https://www.legislation.gov.uk/uksi/2023/909/regulation/22) and [regulation 41](https://www.legislation.gov.uk/uksi/2023/909/regulation/41)). Work affected by a major change must stop until it is approved.

Those periods are for valid applications, and GOV.UK says the time taken depends on the quality of the application and the complexity of the work. In June 2025 the government announced reforms to the regulator to unblock delays ([GOV.UK, 30 June 2025](https://www.gov.uk/government/news/reforms-to-building-safety-regulator-to-accelerate-housebuilding)). A programme that shows the statutory period as a fixed duration is advice the client will rely on.

We ask how your programmes and reports treat approval risk, who assembles each application, and whether your appointment makes you responsible for its content.

Letters of intent and unsigned contracts

Starting on a letter of intent is common. Finishing on one is where claims come from. In _Ampleforth Abbey Trust v Turner & Townsend_ the works covered by the letters came to more than 25% of the contract price, the court heard that it is extremely unusual for a project of that scale to be completed under letters of intent, and the project manager was liable for not pressing the contract to signature ([\[2012\] EWHC 2137 (TCC)](https://caselaw.nationalarchives.gov.uk/ewhc/tcc/2012/2137)). The client recovered £226,667, two thirds of the value the court put on having a signed contract.

We ask how letters of intent are authorised, whether each carries an expiry date and a value limit, who tracks them, and how you record your advice on the protection the client gives up while the contract stays unsigned. Insurers read a clear procedure as a sign of a well run consultancy.

Contract administration and the NEC Project Manager role

A contract administrator or NEC Project Manager is named in someone else’s contract and must act as that contract says, to its timetable. The Construction Act lets the contract name a specified person to give payment and pay less notices for the payer ([sections 110A and 111](https://www.legislation.gov.uk/ukpga/1996/53/part/II/crossheading/payment)). Where the contract is silent, the Scheme requires a pay less notice no later than seven days before the final date for payment ([Scheme for Construction Contracts, Part II](https://www.legislation.gov.uk/uksi/1998/649/schedule/part/II)).

When assessing and certifying, you must act fairly between the parties, whoever pays you ([Scheldebouw v St James Homes](https://caselaw.nationalarchives.gov.uk/ewhc/tcc/2006/89)). We ask which forms you administer, who is named in each, how notice and reply dates are diarised and checked, who covers absence, and how you record the reasons for each decision.

Employer’s agent on design and build

The employer’s agent role is whatever the appointment says it is. Some agents only administer the contract. Others also review the contractor’s design proposals, inspect the works, certify completion and manage the novation of the design team. Insurers see these as very different risks.

We set out which duties you accept, whether you inspect and to what standard, and who reviews design. Watch for appointments that make you responsible for the contractor’s compliance with the employer’s requirements. A promise of that kind goes beyond reasonable skill and care, and may fall within the contractual liability exclusion. On housing, anyone taking on work for or in connection with the provision of a dwelling may owe the statutory duty that it will be fit for habitation ([Defective Premises Act 1972, section 1](https://www.legislation.gov.uk/ukpga/1972/35)).

Procurement advice, contract choice and checking the paperwork

Advice on procurement route, contract form and when to let the contract is advice like any other. In _Plymouth & South West Co-operative Society v ASM_ consultants were in breach for not advising that design and phasing were too undeveloped to contract on. About 87% of the contract sum was provisional ([\[2006\] EWHC 5 (TCC)](https://caselaw.nationalarchives.gov.uk/ewhc/tcc/2006/5)).

The paperwork matters as much. The court in _Ampleforth_ recalled an earlier ruling that a project manager had a duty to ensure the insurances required of the contractor were in place, and could not act as a post box ([\[2012\] EWHC 2137 (TCC)](https://caselaw.nationalarchives.gov.uk/ewhc/tcc/2012/2137)). We ask whether you advise on procurement and contract terms, and who checks bonds, warranties, parent company guarantees and insurance certificates: you, or the client’s solicitors, and where that is written down.

Programme and cost reporting

The monthly report is the service the client sees most, and the document read hardest when a project fails. APM’s Code of Professional Conduct requires members to be accurate in reporting and realistic in forecasting ([APM, Code of Professional Conduct](https://www.apm.org.uk/media/ivjcpn0f/apm-code-of-professional-conduct.pdf)). In _Great Eastern Hotel v John Laing_ the court found the construction manager had submitted incorrect information on delays and their causes, and held it responsible for the delay its management failures caused ([\[2005\] EWHC 181 (TCC)](https://caselaw.nationalarchives.gov.uk/ewhc/tcc/2005/181)).

We ask who relies on your reports: the client alone, or funders, boards, grant bodies and joint venture partners. We ask how you test the contractor’s programme before repeating it, how risk and contingency are shown, and whether your terms limit reliance to the named client.

Caps, net contribution and warranties to funders and purchasers

Your terms decide how much of a project’s loss can land on you. A cap must be defensible: in _Ampleforth_ a cap at the level of the fees failed beside a £10 million insurance obligation ([\[2012\] EWHC 2137 (TCC)](https://caselaw.nationalarchives.gov.uk/ewhc/tcc/2012/2137)). A net contribution clause limits you to a fair share where others are also liable, and the Court of Appeal upheld one in an architect’s appointment with homeowners, leaving the clients with the risk of the contractor’s insolvency ([West v Ian Finlay, \[2014\] EWCA Civ 316](https://caselaw.nationalarchives.gov.uk/ewca/civ/2014/316)).

Warranties and third party rights extend your duties to funders, purchasers and tenants ([Contracts (Rights of Third Parties) Act 1999, section 1](https://www.legislation.gov.uk/ukpga/1999/31/section/1)). We ask for your standard terms, the share of work done on clients’ own terms, how many warranties each project carries, and whether each repeats the cap and the net contribution clause.

Development management and construction management

These roles move you closer to the project’s commercial risk. In _Great Eastern Hotel v John Laing_ the court read the construction management agreement as a whole and held that it imposed a professional’s obligations, not an absolute duty to procure the trade contractors’ compliance ([\[2005\] EWHC 181 (TCC)](https://caselaw.nationalarchives.gov.uk/ewhc/tcc/2005/181)). The wording of your agreement decides which you have.

We ask whether trade contracts and orders are placed in the client’s name or yours, whether your fee depends on profit or completion dates, and whether anyone sits on the board of the project company. On residential schemes we ask about time limits too: Defective Premises Act claims can now run for up to 30 years, and the Supreme Court has applied that period to related negligence and contribution claims ([URS v BDW, \[2025\] UKSC 21](https://caselaw.nationalarchives.gov.uk/uksc/2025/21)).

Your presentation

## A proposal should explain the work behind the numbers

“Liability is capped” only helps if the cap survives in every appointment. Here are brief answers we often see from project managers, and what we send insurers in their place.

Brief proposal answers and what we send instead

What insurers often see

What we send instead

“Project management consultancy.”

The split between client side project management, employer’s agent, contract administration, development management, dutyholder and monitoring roles, with the fee income for each.

“No design.”

What you do take on: briefs, employer’s requirements, design co-ordination, value engineering decisions, and any principal designer role under CDM or the building regulations.

“We use standard contracts.”

Which forms you administer, who is named as contract administrator, employer’s agent or Project Manager, and how notice and reply dates are diarised.

“Some residential.”

Each residential building by height and storeys, your role on it, whether it is a higher-risk building, and any cladding or remediation work.

“Liability is capped.”

Your standard terms, the cap and net contribution clause, the share of appointments on clients’ own terms, and the warranties given on each project.

“No claims.”

Circumstances as well as claims: unsigned contracts, late projects, contractor insolvencies, withheld fees, adjudications and regulator enquiries, with the status of each.

Illustrations of common answers, not statements about particular clients.

### How we handle your renewal

1.  **You send what you have**Schedule, wording, endorsements, last proposal and your renewal date.
2.  **We find what needs explaining**Fee split by role, forms administered, dutyholder appointments, building heights, largest projects, caps and warranties, late or unsigned contracts.
3.  **We approach suited insurers**From more than 30 insurers, specialist agencies and Lloyd’s, chosen for the work you do.
4.  **We compare the wordings**Cover, clauses, excess and limits side by side, with the differences explained.

Consultancy changes

## When your consultancy changes, the insurance needs reviewing

### A director leaving

The consultancy’s policy should still cover a former director for past work. A leaver setting up alone needs their own cover from day one, and any appointment held in a personal name needs a home.

### A new entity

Make sure the old company’s work stays covered, as a predecessor on the new policy or by run off, and that appointments and warranties are novated or left with an insured entity.

### Buying or merging consultancies

Decide whether the successor’s policy takes on the acquired firm’s past work or it buys run off. Ask what has been notified, and read its live appointments, caps and warranties first.

### Taking on new roles

Tell us before you accept your first principal designer, employer’s agent, NEC Project Manager, development management or funder monitoring appointment. A role outside the declared business may not be covered until insurers agree it.

### Changing insurer

Notify every known circumstance to the outgoing insurer first, including late projects and unsigned contracts. Disclose them to the new one, and check the retroactive dates carry across, including any separate date for fire safety.

### Retirement or closure

Appointments and warranties signed as deeds can bring claims for twelve years, and housing claims for longer. RICS regulated firms must arrange run off. Plan cover to match the documents you have signed.

[Run off cover explained](https://www.hammondpi.com/insights/run-off-cover.md)

We have been asked to act as principal designer. Does our policy cover it?

It depends on the wording and on what insurers were told. Most policies cover the professional business described in the schedule and proposal, so a new dutyholder role should be declared before you accept it. Under the building regulations nobody may accept a principal designer appointment unless they meet the competence requirements, and an organisation must designate an individual to manage the role ([Building Regulations 2010, regulations 11E and 11G](https://www.legislation.gov.uk/uksi/2010/2214/part/2A)). Send us the appointment first. We ask insurers to confirm the role in writing, and check how the fire safety clause applies to it.

Alongside your PI

## D&O and cyber cover to consider alongside your PI

Project managers sit on project company boards, hold dutyholder roles and run the information and payment flows a fraudster targets. PI covers claims about your professional work, not a director’s personal defence or the cost of restoring locked systems. We recommend considering directors’ and officers’ cover and cyber cover alongside it.

### Which policy responds?

Tap a situation for the explanation. A general guide only: the answer always depends on the actual wordings.

SituationPID&OCyber

A director is investigated personally after a building regulations offence is alleged against the consultancyMay respondBuilt for itNot built for it

An officer can be guilty of the company’s offence where it involved their consent, connivance or neglect. Some PI wordings pay limited defence costs for proceedings arising from professional work. Directors’ and officers’ cover is built to defend the individual. Criminal fines are not covered.

Your project director sits on the board of the client’s development company, which failsNot built for itBuilt for itNot built for it

PI wordings commonly exclude claims made against a person as director or officer of any company. A claim by a liquidator or investors about board decisions is a management liability matter, and a seat on an outside board may need to be arranged specifically.

Ransomware locks your project files and the shared data environment you hostNot built for itNot built for itBuilt for it

Incident response, forensic help, data restoration and income lost while you cannot work are cyber covers. PI wordings commonly exclude loss directly caused by a cyber act on your own systems, and PI does not pay to get you working again.

A fraudster in your mailbox sends the client a false payment certificate with new bank detailsMay respondNot built for itBuilt for it

The client may claim its loss from you. Whether PI responds depends on the cyber exclusion in the wording. Cyber cover provides the investigation and response. The two wordings have to be read together.

A client claims that your late programme report caused its lossBuilt for itNot built for itNot built for it

This is the professional risk PI is built for. Neither of the other covers is designed to pay a client’s claim about your advice, reports or certificates.

Built for itMay respondNot built for it

Directors’ and officers’ cover explained: personal exposure for dutyholders

Contravening the building regulations is a criminal offence, carrying up to two years’ imprisonment or a fine on indictment ([Building Act 1984, section 35](https://www.legislation.gov.uk/ukpga/1984/55/section/35)). Where a company’s offence was committed with the consent or connivance of a director or manager, or through their neglect, that person commits the offence too ([section 112A](https://www.legislation.gov.uk/ukpga/1984/55/section/112A)). Health and safety law has the same rule ([Health and Safety at Work etc. Act 1974, section 37](https://www.legislation.gov.uk/ukpga/1974/37/section/37)).

D&O cover can fund an individual’s defence, and can respond to claims about how the business, or a project company whose board you sit on, was run. PI wordings usually exclude claims against a person as a director or officer. Some give limited defence costs for prosecutions arising from professional work. Criminal fines are not covered.

Cyber cover explained: response, recovery and payment fraud

-   **Incident response.** Forensic investigators and legal advice from the first call. A notifiable personal data breach must be reported to the ICO within 72 hours of becoming aware of it ([ICO](https://ico.org.uk/for-organisations/report-a-breach/personal-data-breach/personal-data-breaches-a-guide/)).
-   **Restoration and interruption.** Rebuilding systems and project data, and the income lost while the consultancy cannot work.
-   **Payment fraud.** Some policies add cover for funds lost to fraudulent instructions, often with a lower limit and call back conditions.

Many PI wordings exclude loss directly caused by a cyber act on your own systems, and liability under data protection law. If a payment has gone astray, the NCSC’s advice is to contact your bank directly, using its official website or phone number ([NCSC, business payment fraud](https://www.ncsc.gov.uk/section/respond-recover/business-payment-fraud)).

[The other covers we arrange](https://www.hammondpi.com/other-covers.md)

## Questions every firm asks

- [I am retiring. What happens to my PI?](https://www.hammondpi.com/insights/questions/#cq-1)
- [Does using AI invalidate my PI?](https://www.hammondpi.com/insights/questions/#cq-5)
- [Does my policy cover a freelancer or consultant who works for us?](https://www.hammondpi.com/insights/questions/#cq-9)
- [A client wants our liability cap raised to match our PI limit. Does that affect cover?](https://www.hammondpi.com/insights/questions/#cq-15)

[See all common questions](https://www.hammondpi.com/insights/questions.md)

_Guidance only. Cover depends on your own policy wording; speak to us about your position._

## Guides for project managers

[Letters of intent and project managers’ PI claimsGuide](https://www.hammondpi.com/insights/project-managers-letters-of-intent.md)[Project managers’ PI requirements: RICS and appointmentsGuide](https://www.hammondpi.com/insights/project-managers-pi-requirements.md)[Project managers’ liability caps and net contributionGuide](https://www.hammondpi.com/insights/project-managers-liability-caps.md)[Gateway 2 delays and project managers’ PIGuide](https://www.hammondpi.com/insights/project-managers-gateway-two-delays.md)[Professional indemnity explainedGuide](https://www.hammondpi.com/insights/professional-indemnity-explained.md)[Fair presentationGuide](https://www.hammondpi.com/insights/fair-presentation.md)[The clause guideGuide](https://www.hammondpi.com/clauses.md)[Fire safety exclusionsGuide](https://www.hammondpi.com/insights/fire-safety-exclusions.md)[Principal designer: when to signGuide](https://www.hammondpi.com/insights/principal-designer-when-to-sign.md)[Contract reviewsGuide](https://www.hammondpi.com/contract-reviews.md)[Run off coverGuide](https://www.hammondpi.com/insights/run-off-cover.md)[Freelancers and subconsultantsGuide](https://www.hammondpi.com/insights/freelancers-and-sub-consultants.md)[Claims supportGuide](https://www.hammondpi.com/claims-support.md)

Proposal form

## Prefer to fill in a form?

Ask us for the appropriate proposal form, or send us your details when you request a quote.

Beyond the policy

## Claims support and contract reviews

If you receive a complaint or become aware of something that could lead to a claim, email [claims@hammondpi.com](mailto:claims@hammondpi.com), or call [0333 222 4257](tel:03332224257) if it is urgent or sensitive. We report the matter, follow up with the insurer and explain updates. If a deadline is near, follow the notification instructions in your policy immediately. Do not admit liability before speaking to us.

Before you sign, send us the appointment, letter of intent, collateral warranty, third party rights schedule or dutyholder appointment you have been asked to accept, with the project value and a short description of your role. Highlight the wording that concerns you. We can flag insurance points to discuss with you and, where needed, your insurer. Your solicitor can advise on the legal effect. A review cannot guarantee cover for a claim.

[Claims support](https://www.hammondpi.com/claims-support.md)  ·  [Contract reviews](https://www.hammondpi.com/contract-reviews.md)

Review your cover

## Let a specialist read your PI cover

With the schedule, wording, endorsements and renewal papers, include your roles, largest projects, dutyholder appointments and the caps and warranties you have agreed. We will say where the cover fits your consultancy, where it leaves gaps, and what we would change.

[Speak to a PI specialist](https://www.hammondpi.com/contact.md)[Send us your renewal](https://www.hammondpi.com/renewal.md)[Get a quote](https://www.hammondpi.com/quote/?profession=project-managers.md)

-   Your schedule, policy wording and endorsements
-   Renewal date and your last proposal form
-   Your fee split by role and service
-   Your largest projects, with values, building heights and your role on each
-   Your standard terms, and any appointment or warranty awaiting signature
-   Any claims, circumstances or adjudications, with their status