Part L 2026: what the new energy rules mean for building services PI

The 2026 edition of Approved Document L takes effect in England on 24 March 2027. For building services engineers it means a longer paper trail: forecasts, commissioning plans and notices that can later be compared with how the building actually performs.

Guidance only. Cover depends on your own policy wording; speak to us about your position.

The dates, and which projects are caught

The Building Regulations etc. (Amendment) (England) Regulations 2026 come into force on 24 March 2027, and apply to higher-risk building work from 24 September 2027. Government’s stated aim is that new homes and non-domestic buildings are built with low carbon heating and high levels of energy efficiency (GOV.UK, Circular 01/2026). The 2026 edition of Approved Document L takes effect on the same dates (Approved Document L, volume 2, 2026 edition).

When the 2026 Part L rules apply
Type of workNew rules apply fromOld rules continue where
Work that is not higher-risk building work24 March 2027A building notice, initial notice or full plans application was given before 24 March 2027, and the work is commenced before 24 March 2028.
Higher-risk building work24 September 2027A valid building control approval application went to the regulator before 24 September 2027 and has not been rejected.

Check each project and each building with building control, and do not assume. For a year or more you may be running projects under both editions. This article covers volume 2, for buildings other than dwellings.

The energy forecast is a document someone can measure against

For new non-domestic buildings over 1,000 square metres, the 2026 edition says the building log book should include a forecast of actual energy use in kilowatt hours a year, by fuel type, covering all metered uses including unregulated loads. It may use design calculations, benchmarks or a method such as CIBSE’s TM54 (paragraph 8.3). The same paragraph warns that the compliance outputs of approved software are not suitable for direct use as energy forecasts.

Read that with the metering guidance. Submetering should allow forecast energy use to be compared with energy use in operation, and buildings over 1,000 square metres should have automatic meter reading and data collection (paragraph 4.19).

The owner therefore receives your forecast and the means to test it. A forecast is a prediction, not a promise, unless your appointment makes it one. But it will be read years later by someone who was not at the design meetings. The report needs to say what it assumed about hours, occupancy, small power and controls, who supplied each input, and what it does not cover.

Commissioning: a plan with names in it

Fixed building services must be commissioned, and the person carrying out the work must give building control a notice confirming it (Building Regulations 2010, regulation 44). The 2026 edition sets out what sits behind that notice.

  • A commissioning plan. It should identify the systems to test, the tests, the schedule, the roles and responsibilities and the documents required, and be given to building control with the design stage calculations (paragraphs 7.4 and 7.5).
  • A commissioning manager. One should be appointed for large or complex projects (paragraph 7.3).
  • A notice with content. It should confirm that the plan was followed, that systems were inspected, and that test results show performance reasonably in line with the design. Where services do not perform as intended, written commentary should be included (paragraph 7.7).

For a consultant, the point is the entry for roles and responsibilities. If the plan says you witness, manage or certify, that is the document a claimant’s expert may start with. Hands on commissioning can also fall within the supply and installation exclusions found in many consultants’ wordings.

As built calculations and who signs them

The building’s primary energy rate and emission rate must be calculated twice: before work starts, using design values, and at completion, using the building as constructed, including changes to the specification and the measured air permeability (paragraph 2.2). The as built compliance report should be signed by the energy assessor to confirm the calculations are accurate, and must be signed by the client to confirm the building matches the specifications in it (Appendix C).

Late substitutions are where this can go wrong. Plant is changed on site, the as built inputs come from the contractor, and the assessor’s signature goes on a report built from someone else’s information. If your consultancy is the assessor, keep a record of who gave you each as installed figure. If a freelance modeller does the work, your own review is what you will rely on. Freelancers and sub-consultants

There is also less margin: the guidance says space heating systems should not be significantly oversized (paragraph 4.11).

What this means for your cover

None of this changes what a PI policy is. It changes the evidence a claim is built on, and it adds services that have to be described to insurers.

  • Business description. Energy forecasting, energy assessment and commissioning management need to be within the description of your professional business.
  • Forecast or target. If an appointment turns your forecast into a figure the building “will achieve”, the claim may be argued as a broken promise, which many wordings treat differently from negligence.
  • Notification. Metered data showing a gap, sent with a complaint, may be a circumstance that should be notified. Tell us when it arrives.
  • Records. PI is written on a claims made basis, and these claims can arrive years after handover. Keep the model files, the inputs and the issued reports.

The clause guide

What to do before March 2027

  1. List live and pipeline projects and note which edition applies to each.
  2. Rewrite the standard wording of your energy forecast reports: assumptions, sources of inputs, limits and who may rely on them.
  3. Check what each appointment says about commissioning, and that commissioning plans describe your role in the same words.
  4. Agree at the start who supplies as built data, who signs the as built report and what happens when plant is substituted.
  5. Tell us before you take on a new service, such as energy assessment or commissioning management, so it is agreed with insurers first. Renewal
  6. Send us any appointment with an energy, carbon or temperature target before you sign it. Contract reviews

Ready for March 2027?

Tell us how your energy and commissioning work is changing, and we will check that your cover reflects it.

Speak to a PI specialistPI for building services engineers