Who requires a Principal Designer to hold PI, and on what terms?

The regulations that create both Principal Designer roles say nothing about insurance. The requirement comes from your professional body and your appointment, and they do not ask for the same thing. Here is what each requires, and where firms get caught.

Guidance only. Cover depends on your own policy wording; speak to us about your position.

The regulations test competence, not insurance

Neither CDM 2015 nor Part 2A of the Building Regulations 2010 requires a Principal Designer to hold PI (Building Regulations 2010, Part 2A). Both test competence: skills, knowledge and experience, and organisational capability for a firm (CDM 2015, regulation 8; regulation 11G). On higher-risk building work the client must ask whether you have had a serious sanction in the previous five years, and keep a record of its checks (regulation 11E).

The requirement reaches you by two other routes: the professional body or regulator you answer to, and the appointment you sign. They differ, and a firm can satisfy one while breaching the other.

What each body asks for

PI requirements of the bodies most Principal Designers belong to
BodyLimitRun offWorth knowing
APSAdequate and appropriate PI. No figure is publishedRun off “as appropriate”. No period is setMembers confirm each year that they hold PI and legal defence cover, for amounts compatible with the scale and extent of their services
RIBA Chartered PracticesSuitable insurance for liabilities from negligence or breach of contract. No figureAdequate run off on ceasing. RIBA’s guidance note says at least six yearsThe Principal Designer Register assesses competence. It sets no separate PI requirement
CIATAdequate PI for Chartered Members who provide services directly to clients. No figureAll reasonable steps to put adequate run off in placeCIAT can ask principals for evidence of cover
ARBAt least £250,000, each and every claim, adequate for the nature and scope of your workAt least six years (five in Scotland), at the level of your last year in practiceCovers business related to architecture, which may include a Principal Designer role

Sources: APS guidance and APS Code; RIBA Code of Practice and register; CIAT Code of Conduct; ARB guidance. If you belong to another body, check its rules as well.

ARB: the only requirement with figures

ARB’s guidance, published on 19 June 2025, is the most specific of the four (ARB, PII guidance).

  • Aggregate cover is accepted only for fire safety, cladding, asbestos and pollution claims, at a level that reflects the risk of several claims. It may cover direct losses only.
  • Restrictions should be accepted only after all reasonable steps to find comprehensive cover. Try to remove them at each renewal, and keep evidence.
  • Work that is completely excluded from cover is not acceptable.
  • If a new exclusion affects earlier projects, ARB expects you to contact the former clients affected. If cover for a live appointment is no longer available, tell the client without delay and write to ARB.

For a Principal Designer the third point matters most. ARB defines a fire safety claim as any liability arising from or in any way related to the fire safety of a building, and coordinating a fire strategy is related to it. A policy that excludes fire safety entirely may therefore put an architect’s Principal Designer appointments outside the guidance. Compliance is not mandatory, but an architect who departs from it must be prepared to justify why.

The appointment is usually the stricter rule

For most Principal Designers the binding requirement is contractual. Read four things:

  • The limit and basis. A promise of a stated sum “for each and every claim” may not match a policy that gives fire safety cover as one aggregate sum.
  • The period. Check how many years after completion you must keep the cover in place, and what the clause says if such cover stops being generally available.
  • Two appointments. A RIBA professional feature points out that separate design and Principal Designer appointments may create two pots of liability for one project, and that the cap on each needs care (RIBA, separate appointments).
  • Evidence. Whatever is confirmed to the client should say no more than the policy does.

A promise to maintain cover that you cannot keep may be a breach of contract in its own right.

What a policy needs before it fits the role

  • Business description. Each role you hold, CDM, Building Regulations or both, should sit inside the description of your business in the schedule and proposal.
  • Who is appointed. Check whether the firm or a named individual holds each appointment, and that the policy covers that person.
  • Fire safety terms. Read whether the endorsement excludes or limits, whether cover given back is aggregate, and whether costs sit inside it.
  • Legal defence. APS asks its members for legal defence cover as well as PI. Check any sub-limit for defending building regulation and health and safety prosecutions, and whether it protects individuals.
  • Retroactive date. Roles held before the policy started, including at an earlier firm, need to fall inside it.
  • Run off. Set it against how long you can be sued, not against your body’s minimum.

Where firms get caught

The role arrives sideways. A client can certify that its CDM Principal Designer is treated as appointed under the Building Regulations (regulation 11D). A CDM consultancy may then hold a role its insurers were never told about. When to say yes, and when not to sign

Higher-risk buildings are looked at differently. CIAT’s Principal Designer page says liability for higher-risk building roles is assessed case by case, and that insurers will likely need more information than usual. Tell us before you tender.

Six years is a floor. ARB and RIBA guidance start at six years’ run off. ARB itself warns of liabilities that outlast the normal time limits: twelve years under a deed, and claims under the Defective Premises Act, which for housing may be brought for 15 years, or 30 where the right arose before 28 June 2022 (Limitation Act 1980, section 4B). Run off cover explained

We read all three side by side. Fair presentation explained

Not sure your PI fits the role?

Send us your schedule, endorsements and a typical appointment, and we will tell you where the three do not meet.