[2025] UKSC 21
URS Corporation v BDW Trading
A design consultant owed the Defective Premises Act duty to the developer, and the 30 year period reaches related negligence and contribution claims.
Home / Who we cover / Principal designers
Principal designers
Principal Designers’ PI, read clause by clause by specialist brokers. We know the two statutory roles, what a compliance declaration commits you to, how insurers treat coordinating design as against designing, and why a role that ends at completion can be claimed on years later.
Speak to a PI specialistSend us your renewal for reviewGet a quote
Your map
Your firm’s work on one side, the policy on the other. Select a point to see what it connects to, then follow the link to the part of this page that explains it.
Still 3D render (motion off)
Each heading below is one area of the map, and the number shows how many points it holds. Open a heading and tap any point: it lights up on the map with everything it connects to, and a short note explains why.
Our experience
Your name goes on the compliance declaration when the role ends, yet the claim can come years later. A CDM appointment on a warehouse refit, the Building Regulations role on a block of flats, both roles as lead designer, a default role on an extension and an adviser’s role behind a contractor each owe different duties to different people.
Coordinating design is not the same as designing, and insurers do not always treat it the same way. Our specialism since 1990 has been professional indemnity, so Hammond PI checks that each Principal Designer role sits inside your professional business, how fire safety restrictions reach a coordinator, what happens to “ensure” clauses and declarations, and how far a prosecution is defended. Insurers then see each role, project by project.
A regulator’s letter, HSE questions after a site injury or a client’s delay claim needs care from the first day. We notify insurers, gather your appointment, responsibility matrix and review records, and stay with the claims handler.
Who requires PI
Neither CDM 2015 nor the Building Regulations requires a Principal Designer to hold insurance. The requirement comes from your professional body and your appointment, and only ARB names a figure.
| Who | Minimum cover | Excess | After you stop | Other conditions |
|---|---|---|---|---|
| Association for Project Safety | Adequate and appropriate PI for you, your business and your employees, kept adequate to meet a claim (Rule 4). The Code speaks of a minimum level of cover, but APS publishes no figure. Members confirm each year that they hold PI and legal defence cover on terms and for amounts compatible with the scale and extent of their services. | Not specified | Run off cover “as appropriate”. No period is set | No approved insurer list or minimum wording. The annual confirmation does not apply to members who only work as employees. The Code’s guidance gives, as an example of a breach, accepting an appointment without telling the client that PI is insufficient for its scope. It also says insurers should be told of any likely claim as soon as possible |
| RIBA (Chartered Practices and the Principal Designer Register) | Suitable insurance for potential liabilities from negligence or breach of contract in your professional activities (Code of Practice, 10.1). No figure is set. The Principal Designer Register assesses individual Chartered Members’ competence, at General or higher-risk building level. Its pages set no separate PI requirement. | Not specified | Adequate run off when the practice ceases. RIBA’s guidance note says at least six years, at the highest level held in the three years before closing | No approved insurer list or minimum wording. RIBA’s published guidance says architects should not assume the Building Regulations role is covered because they are insured as architects or have acted as CDM Principal Designer, and should have cover confirmed before accepting an appointment |
| Chartered Institute of Architectural Technologists | Adequate PI for Chartered Members who provide services directly to clients, and for the practices they run (Clause A4). No figure is set. CIAT runs Principal Designer Registers for non higher-risk buildings and for higher-risk buildings. Joining is not mandatory. | Not specified | Former principals must take all reasonable steps to put adequate run off in place, or otherwise discharge their duty while protecting their clients’ interests | No approved insurer list or minimum wording. CIAT can ask principals for evidence. Its Principal Designer page says higher-risk building roles are likely to be assessed case by case, with more information asked for than usual |
| Architects Registration Board (architects acting as Principal Designer) | At least £250,000, at a level adequate for the nature and scope of your work. The guidance supports Standard 4 of the Architects Code and concerns liability incurred in practice or business related to architecture, which may include a Principal Designer role. Basis: each and every claim. An aggregate limit is accepted for fire safety, cladding, asbestos and pollution claims, if it is high enough for the risk of several claims. | Not specified | At least six years (five if you practise in Scotland), at the same level as your last year in practice, and keep monitoring the risk after that | No approved insurer list or minimum wording. Fire safety and cladding restrictions only after all reasonable steps to find comprehensive cover, reviewed at each renewal. Work that is completely excluded from cover is not acceptable |
| CDM 2015 and the Building Regulations 2010, Part 2A | No insurance requirement at all. Both sets of regulations test competence: skills, knowledge and experience, the right behaviours under Part 2A, and organisational capability for a firm. In practice your PI requirement is whatever the client’s appointment says. Basis: set by your appointment. | Not specified | Not specified. Check how long your appointment requires PI to be maintained after the project | On higher-risk building work the client must ask whether you have had a serious sanction in the last five years, and keep a record of its competence checks. Expect insurers to ask the same questions |
Sources: APS (Code of Professional Conduct, April 2024), RIBA (Code of Practice dated 1 April 2021; register and guidance pages as read on 20 November 2026), CIAT (Code of Conduct effective 1 January 2022), ARB (PII guidance published 19 June 2025), The regulations (Legislation as in force on 20 November 2026 (Part 2A applies in England from 1 October 2023)). Firms answering to more than one must meet each set of rules.
Only ARB names a figure, and it is a floor for architects, not a measure of a Principal Designer’s exposure on a higher-risk building.
A Principal Designer’s fee is small against the cost of what can go wrong: a building control rejection that stops a programme, a design team whose work was never coordinated for compliance, or a declaration relied on at completion. You may be joined to claims against every designer you coordinated. Set the limit by the projects, not the fee. Check whether fire safety claims share one aggregate limit, and whether your appointment promises a limit you can keep buying.
Claim scenarios
A Principal Designer’s claim can begin with a declaration, a rejected application or an HSE visit. Choose a scenario to see where the role exposes you and what we would do.
The situationYou were Building Regulations Principal Designer on a 40 home scheme until the end of technical design, when the contractor took over the role. At completion the client’s agent sends a form for your signature. It says the design and the completed work comply with the Building Regulations. The contractor changed several products after you left.
The riskSigning to keep the handover moving. The regulations ask only for a statement that you fulfilled your duties as Principal Designer, with your appointment dates. A promise that the building complies is a warranty of a result, for a period you did not cover. Many wordings exclude express warranties and guarantees.
Our strategy
What we aim forA declaration that says what the regulations ask and no more, signed with insurers’ knowledge, and a clear record of the period it covers.
The lessonDeclare what you did, for the dates you did it. Never certify the building.
The situationYour consultancy is CDM Principal Designer on an office to residential conversion. The client’s project manager emails a certificate stating that the CDM Principal Designer is treated as Principal Designer under the Building Regulations. Nobody replies. A year later building control refuses a completion certificate over ventilation and fire stopping, and the client claims.
The riskAssuming silence meant nothing. The regulations let a client comply by certificate, and you carried on working. You must not act in the role unless competent for it, and your policy describes your business as CDM and health and safety consultancy. The claim may sit outside the insured business as well as outside your expertise.
Our strategy
What we aim forThe question of whether you held the role dealt with alongside a funded defence, and those who produced the non-compliant work brought into the claim.
The lessonAnswer every certificate, appointment letter and project directory that names you. Silence can make you the Principal Designer.
The situationYou drew planning and building regulations drawings for a rear extension and loft conversion. Your appointment ended when building control approved the plans. The homeowner appointed nobody as Principal Designer. The builder changed the steelwork and insulation. Building control will not issue a completion certificate, and the owner’s solicitors say you held the role by default.
The riskReplying that you were never appointed. Where a domestic client makes no appointment, the designer in control is the Principal Designer under both sets of regulations. The real questions are whether you still controlled the design when the changes were made, and whether your insurers knew you took such roles.
Our strategy
What we aim forThe claim answered on who controlled the design when it went wrong, with the default role explained to insurers and not left for them to discover.
The lessonOn domestic work, write down when your design role ends and who takes over. Tell us you do it.
The situationA contractor holds the Principal Designer and Principal Contractor roles on a student residence. It engages your firm as “Principal Designer adviser”. The agreement says you will discharge the contractor’s duties as Principal Designer and indemnify it against any breach. After a compliance notice and a three month delay, the contractor claims its losses and legal costs under the indemnity.
The riskTreating the indemnity as the measure of your liability, or as a commercial matter to settle quietly. The contractor cannot transfer the statutory role, but it can sue on the contract. An indemnity against any breach goes further than negligence, and wordings commonly exclude duties more onerous than the law would imply, as well as fines and penalties.
Our strategy
What we aim forA funded defence of the advice you actually gave, with the contractual extras identified at the start and not discovered at settlement.
The lessonAdvise the contractor’s Principal Designer if your PI allows it. Do not become it by indemnity.
The situationYou are CDM Principal Designer on a factory refurbishment. A roofer falls through a fragile rooflight that no survey or drawing identified. HSE asks for your pre-construction information and invites a director to an interview under caution. The roofing contractor’s insurers write that they will look to you for a contribution to the injury claim.
The riskHandling the HSE interview yourself and leaving the civil letter for later. What a director says to an inspector may be read by the claimant’s solicitors. Criminal defence costs under PI usually need insurers’ consent first, and the wording may not protect the director personally.
Our strategy
What we aim forOne coordinated response to the regulator and the civil claim, funded where the wording allows, with nothing said in one that harms the other.
The lessonAn inspector’s question and a solicitor’s letter are one event. Notify them together.
The situationYou are Principal Designer on a 12 storey residential block under construction. Your design review finds that a transfer structure detail, already issued by the structural engineer, may not carry the load. It meets the test for a safety occurrence. You must notify the Building Safety Regulator without undue delay and send a written report within 10 days.
The riskReporting to the regulator and forgetting your insurers, or delaying the report while you ask them. The report is a statutory duty with a deadline. It is also a written statement that a design on your project is unsafe, which is plainly a circumstance. The regulations limit its use in criminal proceedings. They say nothing about civil claims.
Our strategy
What we aim forThe report made within the statutory time, insurers on notice before any claim, and a factual record that does not decide liability between the designers.
The lessonA safety occurrence report and a notification to insurers belong in the same hour.
The situationYou are Principal Designer, but not a designer, on a new 20 storey residential tower. The Building Safety Regulator rejects the building control approval application, citing an incomplete fire and emergency file and an unclear Building Regulations compliance statement. Work cannot start. The client claims six months of finance costs and says you failed to coordinate the design team.
The riskAssuming a fire safety exclusion cannot apply because you designed nothing. Many restrictions catch any claim arising from or in any way related to fire safety, whoever produced the design. If limited cover is given back, it may be one aggregate sum including defence costs, and may exclude consequential losses such as delay.
Our strategy
What we aim forThe claim placed under the widest cover the wording allows, defended on what a coordinating role requires, with the delay kept as short as possible.
The lessonRead your fire safety restriction as if you had designed the building. It may be written that way.
Illustrative scenarios. How any real claim is handled depends on the facts, the policy wording and insurers’ agreement.
A claim today may concern a role you finished several years ago. PI is written on a claims made basis: the policy in force when the claim is made responds, provided the work falls after the retroactive date and nothing was already notified under an earlier policy.
A valid notification of circumstances can connect a later claim to an earlier policy. That is why continuity matters when you change insurers or stop a particular service. How claims made cover works
At completion, each Principal Designer signs a statement giving the dates of their appointment and confirming that they fulfilled their duties under Part 2A (Building Regulations 2010, regulation 16). On higher-risk buildings the same confirmation goes to the regulator as a compliance declaration (Higher-Risk Buildings Procedures Regulations 2023, regulation 40). It is the client who states that the work complies, to the best of its knowledge. Clients’ own forms often ask you for more. A promise that the design or the building complies is a warranty of a result, and many PI wordings exclude express warranties and guarantees. Sign the statutory statement, for your own dates, and send us anything wider first.
Contravening the Building Regulations is a criminal offence, and breach of CDM 2015 is an offence under the Health and Safety at Work etc. Act 1974. Both can be charged against a director personally (Building Act 1984, section 112A; 1974 Act, section 37). PI wordings exclude fines and penalties. Some add a limited sum for defending building regulation and health and safety prosecutions, with insurers’ prior consent, and commonly exclude claims against you as a director or officer. RIBA’s published guidance makes the same point: do not expect PI to pay a regulatory fine or criminal penalty.
Two unrelated covered claims of £750,000 each come to £1.5 million. Under a £1 million limit in the aggregate, the policy pays up to £1 million for the year in total. Under a £1 million limit for each and every claim, each claim has its own £1 million, subject to the policy’s aggregation wording and other terms.
£1 million in the aggregate
£1 million each and every claim
Then check whether defence costs are paid in addition to the limit or use it up, and when the excess applies.
Inside the wording
Coordinating design raises questions a designer’s wording was not written for. Twelve clauses do most of the deciding. Open each for what it does, what it means for a Principal Designer and what we check.
What it doesCover is for civil liability arising from the ordinary conduct of your professional business: the work ordinarily expected of a firm of the type named in the schedule and proposal, plus personal appointments.
For a principal designerA CDM consultancy acting as Building Regulations Principal Designer, or an architect taking either role, may be outside the type of firm insurers thought they were covering. An individual named in person holds a personal appointment.
What we checkThe business description against every role you hold, who is appointed (the firm or a person), and that each role was declared.
What it doesLiability for breach of contract is typically excluded so far as the duty claimed is more onerous than common law or statute would imply, along with liquidated damages and penalties.
For a principal designerThe regulations ask for all reasonable steps. Appointments often say you will “ensure” or “procure” compliance, or meet the Employer’s Requirements. The gap between the two is what the exclusion removes.
What we checkEvery “ensure”, “procure” and “guarantee” in the appointment, against the words of regulation 11M and CDM regulation 11.
What it doesLiability assumed under an express warranty or guarantee is commonly excluded unless you would have been liable anyway. Guarantees of fitness for purpose, or of meeting a performance specification, stay excluded.
For a principal designerA completion form stating that the building complies, or a certificate to a funder, can be an express warranty. The statutory statement, that you fulfilled your duties, is narrower.
What we checkDeclaration and certificate wording before signature, against the regulations’ own words and your appointment dates.
What it doesCover is usually given back for collateral warranties and duty of care agreements, provided the benefit is no greater or longer lasting than your client’s. Guarantees remain excluded.
For a principal designerFunders and purchasers ask the Principal Designer for warranties as they ask designers. A warranty that outlasts or outreaches the appointment may be uninsured to that extent.
What we checkEach warranty against the appointment: duration, assignments, beneficiaries, standard of care, and whether the role suits a warranty at all.
What it doesAn endorsement, not usually part of the printed wording, that excludes or limits claims arising from or in any way related to fire safety or combustible external walls.
For a principal designerCoordinating a fire strategy, a fire and emergency file or a compliance statement is related to fire safety. The restriction can bite on a firm that designs nothing.
What we checkThe definition, whether cover is given back on an aggregate basis, whether costs sit inside it, and whether consequential loss is excluded.
What it doesFines and penalties are excluded. Some wordings add a small aggregate sub-limit for defending prosecutions under building regulation or health and safety law, with prior written consent.
For a principal designerBoth Principal Designer roles are enforced by criminal law. Cover can stop on a guilty plea, or when counsel sees no reasonable prospect of a defence, and never pays the fine.
What we checkWhether the extension exists, its limit, when consent is needed, and whether it protects individuals as well as the firm.
What it doesClaims arising from, or brought against you in, your capacity as a director or officer of your own firm or any other company are commonly excluded.
For a principal designerWhere a company’s offence is committed with a director’s consent or connivance, or through neglect, the director is guilty too. A PI policy may leave that person without a defence.
What we checkHow the exclusion sits with the criminal defence extension, and what separate protection the directors have.
What it doesLegal costs of representation at an inquiry or other proceeding may be paid, with prior written consent, where insurers consider the outcome relevant to a claim the policy would cover.
For a principal designerA regulator’s investigation, a building control dispute or an inquest can shape the civil claim that follows. But cover is at insurers’ discretion and tied to an insured claim.
What we checkThe trigger, the consent requirement, the limit, and whether an interview under caution counts as a proceeding.
What it doesInjury and property damage are excluded unless caused by a breach of professional duty, such as negligent advice, design or specification.
For a principal designerAn injury blamed on missing pre-construction information is a professional claim. A visitor hurt at your office, or damage you cause on a site visit, is not.
What we checkThat injury claims arising from CDM advice are inside the PI wording, and how the boundary with any public liability policy is drawn.
What it doesMany designers’ wordings exclude liability arising from construction, installation or alteration where you, a connected business or your sub-contractor has entered into a contract to build.
For a principal designerA contractor acting as Principal Designer needs a wording built for design and construction. A consultancy linked to a contracting company can lose cover on the group’s own projects.
What we checkGroup structure, connected companies, any contract that includes carrying out work, and which type of wording fits.
What it doesSome wordings exclude a claim where, by agreement with a third party, your rights of recovery against that party have been restricted in any way.
For a principal designerA Principal Designer sued for a design team’s failure needs to pass the loss to the designer at fault. Accepting a sub-consultant’s low cap, or waiving claims in a framework, can undo that.
What we checkCaps and waivers in sub-consultant and framework terms, and that those you appoint carry adequate PI.
What it doesClaims and circumstances must be notified as soon as reasonably possible, whatever your view on liability. A circumstance includes becoming aware of any shortcoming in your work.
For a principal designerA building control rejection, a compliance or stop notice, a safety occurrence report, a declaration you cannot sign, or a client withholding fees after complaining, may each be a circumstance.
What we checkThe definition, the time limits, the cut off after expiry, and how late notice affects the claim.
Two statutory roles
[2025] UKSC 21
A design consultant owed the Defective Premises Act duty to the developer, and the 30 year period reaches related negligence and contribution claims.
[2023] EWHC 2620 (TCC)
A consultant with duties of review and coordination, not control, was not bound to oversee others’ compliance. Any duty to review a design depends on the contract.
[2021] EWHC 590 (TCC)
An independent design checker engaged by a sub-contractor owed the main contractor no duty of care, and its check certificates were not warranties to it.
[2010] EWHC 2300 (TCC)
An engineer who reasonably relied on a specialist contractor’s advice was not negligent. Reasonable reliance on a specialist can discharge the duty of care.
[2017] UKSC 59
A promise of a result in a technical schedule was enforced, although the contractor had used reasonable skill and care and followed the design standard.
[2024] EWHC 3569 (TCC)
The court made a building liability order, so a group company became liable for the relevant liability of an associated company in liquidation.
These decisions explain where a professional’s duty lies. They do not decide whether a particular policy responds.
Specialist work
Which role you hold, and whether any of your buildings are higher-risk, now decide most Principal Designers’ cover, so those two lead. The rest follow underwriters’ questions on declarations, design and build, domestic work, appointments, specialists and competence.
The two roles share a title and little else. The CDM role coordinates health and safety before construction. The Building Regulations role coordinates the whole design for compliance, and government guidance says its holder should be part of the design team, not an outsider with no influence over design decisions (GOV.UK, dutyholder guidance).
Insurers do not treat the roles alike. RIBA’s published guidance tells architects not to assume the Building Regulations role is covered because they are insured as architects, or have acted as CDM Principal Designer. CIAT says higher-risk building roles are likely to be assessed case by case (CIAT, Principal Designer).
We ask:
Each answer should match your policy’s description of your business.
On a higher-risk building the Principal Designer must be appointed before the building control application goes to the Building Safety Regulator (Building Regulations 2010, regulation 11D). No building work may start until the application is approved, and the regulator has 12 weeks to assess one for a new building (GOV.UK, building control approval for higher-risk buildings).
The role then carries duties that ordinary projects do not:
Each step produces a document with your name on it. We ask how many higher-risk projects you hold, at what stage, who the designated individual is and what register level they hold. Expect insurers to look hard at fire safety terms.
You may be asked for three different documents. At completion, a signed statement that you fulfilled your Part 2A duties (Building Regulations 2010, regulation 16). When your appointment ends early, a document for the client, within 28 days, explaining the arrangements you put in place (regulation 11M). On a higher-risk building where you are replaced, a signed statement certifying that you fulfilled your duties, or explaining which you could not fulfil and why (Higher-Risk Buildings Procedures Regulations 2023, regulation 29). RIBA advises limiting any statement to the duration, stages and activities of your own appointment (RIBA, top 10 questions). The last of those documents can read as an admission. Send us the draft before it goes, so that insurers see it first.
The client must make the appointment, so the Principal Designer role cannot simply be novated with the design team. RIBA’s position is that on a typical design and build project the contractor should hold both principal roles, with the novated architect advising it where the architect’s PI extends to that service. RIBA also notes that the contractor cannot transfer the statutory liability to a consultant (RIBA, Principal Designer in design and build). That is the statutory position. The contract can say something else: adviser agreements often ask you to perform the contractor’s duties and indemnify it. We read what the agreement makes you promise, whether your earlier role was properly ended and handed over, and whether insurers know that you advise contractors. A contractor that holds the role needs a design and construction wording of its own.
Homeowners rarely appoint anyone in writing. When they do not, the designer in control of the design phase is the Principal Designer, under CDM 2015 and under the Building Regulations (CDM 2015, regulation 7; Building Regulations 2010, regulation 11C). Where there is one contractor and one designer, that designer must fulfil the Principal Designer’s duties (regulation 11D). A practice that only draws plans for approval can therefore hold the role without a fee for it, and may be asked to sign the statement at completion long after its work ended. RIBA recommends a domestic form of appointment that provides for both roles (RIBA, top 10 questions). We ask how many domestic projects you take, where your appointment stops, what you tell clients about their duties, and how you record the handover.
Many consultancies hold the CDM role without designing, or advise a client or another firm’s Principal Designer. The CDM Principal Designer must make sure designers comply with their own duty to design out risk, help the client with pre-construction information and prepare the health and safety file (CDM 2015, regulation 11; regulation 12). HSE prosecutes when coordination fails. In September 2026 a developer that was also Principal Designer and Principal Contractor was convicted and fined £1 million after a window fell from a tower and killed a passer-by. HSE’s inspector said Principal Designers must clarify what each designer and consultant will provide, and monitor their performance (HSE press release, 24 September 2026). We ask which appointments make you the dutyholder and which make you an adviser. An adviser’s liability depends on its contract, and on whether anyone has made it promise the dutyholder’s result.
RIBA recommends a separate appointment for the Principal Designer role, to keep statutory duties apart from design deliverables, and publishes a Building Regulations Principal Designer contract for it (RIBA, Principal Designer contract). A RIBA professional feature warns that two appointments can mean two pots of liability, and that some clients draft bespoke terms making the Principal Designer answer for the Employer’s Requirements (RIBA, separate appointments). We read:
A Principal Designer is not expected to be an expert in every design specialism, but is expected to know enough to assess whether a design will comply (GOV.UK, dutyholder guidance). Each designer keeps its own duty to design for compliance and to report concerns to you (Building Regulations 2010, regulation 11K). The courts have accepted that a professional who reasonably relies on a specialist may discharge its duty that way (Cooperative Group v John Allen Associates), and that a consultant with duties of review and coordination, not control, is not thereby bound to oversee everyone else’s compliance (Lendlease v Aecom). Both cases turned on their contracts. If you appoint your own fire engineer or CDM adviser as a sub-consultant, their error is yours first. We check their PI, and that you have not capped your recovery against them. Freelancers and sub-consultants
Government guidance points to PAS 8671 as the recommended competence framework for the Building Regulations role (GOV.UK, dutyholder guidance). It was published in 2022, covers individuals, and does not set thresholds for the CDM role or for a firm’s organisational capability (BSI, PAS 8671:2022). APS, RIBA and CIAT each run registers with a general level and a higher-risk building level, and CIOB runs a certification scheme (APS; RIBA; CIAT; CIOB). No register is compulsory: RIBA says neither set of regulations requires one, and that competence still has to be reviewed project by project (RIBA, top 10 questions). We present the named individual’s evidence, the firm’s procedures for matching people to projects, and what you do when a project proves to be beyond you. The regulations treat refusing such work as part of competence.
Your presentation
“We act as Principal Designer” does not say which role, on which buildings, or whether you also design. These are short answers we often see, and what we send insurers instead.
| What insurers often see | What we send instead |
|---|---|
| “We act as Principal Designer.” | CDM, Building Regulations or both, by project, with building type, height, contract value and whether you also design. |
| “CDM consultancy.” | Each service with its fee share: CDM Principal Designer, client adviser, adviser to a contractor’s Principal Designer, Building Regulations Principal Designer, audits and training. |
| “No higher-risk buildings.” | How you check: height, storeys and use for each project, who reviews it as the design changes, and any higher-risk work you declined. |
| “Competent staff.” | Each designated individual’s qualifications, register entries and level, experience by building type, and how you match people to projects. |
| “Standard terms.” | The share on published standard forms, bespoke terms accepted, any “ensure” wording, indemnities to contractors, warranties given and declarations signed. |
| “No claims.” | Building control rejections, compliance or stop notices, HSE contact, safety occurrence reports, declarations you declined to sign, and notified circumstances with their status. |
Illustrations of common answers, not statements about particular clients.
Firm changes
Tell us before the first appointment, including any client certificate that extends a CDM role. The role must sit inside your business description, and insurers will ask about competence, project types and terms.
Tell us before you tender. Insurers commonly look at these roles case by case and want the designated individual’s evidence, the building, your part in the applications to the regulator and your fire safety terms.
Advising a contractor that holds the role, or acting as its sub-consultant, changes who can sue you and on what terms. Send us the agreement, especially any indemnity or promise to discharge its duties.
Appointments name a legal person. A new company needs the old firm’s past roles covered, usually by naming the predecessor and keeping the retroactive date, and clients need to know who holds each live appointment.
Decide whether the successor’s policy picks up the other firm’s past roles or that firm buys run off. Some wordings need insurers’ written agreement to cover work done after a takeover or merger.
Cover ends when the policy does. The exposure does not. ARB and RIBA guidance start at six years’ run off, yet claims about housing can be brought for 15 years, so plan for longer.
A firm appointed as Principal Designer must designate an individual to manage the role, and must first take all reasonable steps to satisfy itself that the person is competent (Building Regulations 2010, regulation 11G). If the firm can no longer meet the competence requirement for the project, it must notify the client (regulation 11I). Name a successor, record the handover and tell us, because insurers will have assessed the firm on the named person’s evidence. Check too that your policy still covers former directors and employees for the work they did.
Alongside your PI
Both Principal Designer roles are enforced through criminal law, against individuals as well as firms. PI deals with civil claims about your work. It will not defend a director at an interview under caution, nor meet injury or damage unconnected with your advice, so we recommend considering directors’ and officers’ (management liability) and public liability cover.
Tap a situation for the explanation. A general guide only: the answer always depends on the actual wordings.
This is what PI is for: civil liability for your professional work, with defence costs. Management liability policies usually exclude professional services, and public liability policies usually exclude professional advice.
Some PI wordings carry a small sub-limit for defending such prosecutions, and commonly exclude claims against directors as directors. Management liability cover is designed to defend individuals, and the company if entity cover is included. Some public liability policies defend health and safety prosecutions that follow an insured incident. Criminal fines are not usually insurable.
Costs start long before any charge. Management liability policies commonly fund representation when an individual is investigated. A PI inquiry costs clause may respond only where the outcome is relevant to an insured civil claim, and needs insurers’ consent first.
An injury said to flow from professional advice is a PI matter under most wordings, which cover injury caused by a breach of professional duty. Public liability policies often exclude professional advice, so the two wordings need reading together to avoid a gap.
No professional error is involved, so PI is not built for it. Public liability covers your legal liability for accidental injury and property damage arising from the business itself.
Built for itMay respondNot built for it
The regime was written to make people answerable. A director is guilty with the company where its offence is committed with the director’s consent or connivance, or is attributable to their neglect (Building Act 1984, section 112A), and the 1974 Act applies the same rule to CDM offences (section 37). On higher-risk work, a conviction, a stop notice or certain compliance notices count as a serious sanction that future clients must ask about for five years (Building Regulations 2010, regulation 11E). For a management liability policy we look at:
Principal Designers and CDM advisers visit live sites, occupied buildings and clients’ premises. PI wordings usually exclude injury and property damage unless caused by a breach of professional duty. Public liability is the other half:
APS lists public liability beside PI in the insurance it describes for members (APS, professional indemnity insurance). Other covers to consider
Guidance only. Cover depends on your own policy wording; speak to us about your position.
Proposal form
Ask us for the appropriate proposal form, or send us your details when you request a quote.
This form is not available to download at the moment. Call 0333 222 4257 or email [email protected] and we will send it to you.
Beyond the policy
If you receive a complaint or become aware of something that could lead to a claim, email [email protected], or call 0333 222 4257 if it is urgent or sensitive. We report the matter, follow up with the insurer and explain updates. If a deadline is near, follow the notification instructions in your policy immediately. Do not admit liability before speaking to us.
Before you sign, send us the Principal Designer appointment, adviser agreement, collateral warranty, compliance declaration or client certificate you have been asked to accept, with a short project description and the clauses that concern you highlighted. We can flag insurance points to discuss with you and, where needed, your insurer. Your solicitor can advise on the legal effect. A review cannot guarantee cover for a claim.
Review your cover
Send the schedule, every endorsement, the wording and renewal papers, with a list of your live roles: CDM, Building Regulations or both, the buildings and the clients. Mention any fire safety restriction or declaration already signed. We will report where the cover fits your firm, where it falls short and what should change.