We would like to set optional cookies to understand how the site is used. Essential cookies keep forms working. Cookie policy.

Home / Who we cover / Fire consultants and fire engineers

Fire consultants and fire engineers

Professional indemnity for fire consultants and fire engineers

Fire safety PI, read clause by clause by specialist brokers. We know how insurers restrict fire safety cover, why strategies, risk assessments and external wall appraisals are underwritten differently, and how past high rise work follows a consultancy for decades.

Speak to a PI specialistSend us your renewal for reviewGet a quote

  • Since 1990Specialist PI brokers
  • 30+ insurersPlus specialist agencies and Lloyd’s
  • 4.9 out of 5From 228 Google reviews
  • FCA authorisedFRN 302911, independently owned

Your map

The fire consultants and fire engineers map: from your work to the policy and beyond

Your consultancy’s work on one side, the policy on the other. Select a point to see what it connects to, then follow the link to the part of this page that explains it.

Still 3D render (motion off)

The map, area by area

Each heading below is one area of the map, and the number shows how many points it holds. Open a heading and tap any point: it lights up on the map with everything it connects to, and a short note explains why.

Practice and business risks 12

Your terms and framework agreements 8

Appointments and contracts 6

Legislation 3

Policy documents and schedule 10

Main policy wording 8

Exclusions and restrictions 4

Succession, closure and earlier work 4

Other insurance and final assessment 8

Our experience

Why fire consultants come to a specialist

Two consultancies with the same fee income can present very different risks. A fire strategy for a new residential tower, a fire risk assessment of a care home, a PAS 9980 external wall appraisal and a BS 7974 engineered solution each carry different duties, different claimants and a different length of tail. Insurers treat each one differently.

Hammond PI has specialised in professional indemnity since 1990. We read the wording itself: how each insurer words its fire safety and cladding restriction, whether the limit for that work is aggregate and includes defence costs, where the retroactive date sits and what the notification clause demands. Then we present your consultancy so insurers underwrite the work you actually do.

When a problem arises we stay involved. We put the matter to insurers, frame the notification so it reaches every building it should, gather what the claims handler needs and follow it through.

  1. The workFire strategies, risk assessments, external wall appraisals, engineered solutions and site inspections, in their real proportions
  2. What can go wrongA missed compartmentation defect, an unsupported design assumption, a challenged EWS1 rating, a misread scope
  3. What the policy must answerFire safety restrictions, aggregate limits, defence costs, retroactive date, notification and criminal defence cover
  4. How we present itA building by building account of past and present work, with scopes, heights and sign off controls

Who requires PI

Check what your institution, your register and your clients require

No regulator yet sets a minimum PI limit for fire engineers or fire risk assessors. The requirement comes from your institution’s code, the register you sit on and the appointments you sign. Each rule below links to its source.

PI requirements: Who requires PI
WhoMinimum coverExcessAfter you stopOther conditions
Institution of Fire EngineersMembers of all grades must hold adequate professional indemnity insurance, where required. The code sets no minimum figure, so adequacy is judged against the work you do and the buildings you do it on.Not specifiedNot specifiedThe same code requires members to accept responsibility for work carried out by them or under their supervision. Applicants to the IFE fire risk assessors register must also hold Engineering Council registration through the IFE.
Institute of Fire Safety Managers, National Fire Risk Assessors RegisterEvery applicant must hold professional indemnity insurance, or work exclusively within a business whose public liability insurance covers their work. No minimum figure is set.Not specifiedNot specifiedValid insurance documents must be kept on the registrant’s online profile and replaced as they expire: professional indemnity for assessors doing external work, public liability for those assessing their employer’s own buildings. The register tells users to verify an assessor’s insurance themselves.
Government backed EWS1 PI scheme (closed)The scheme closed on 30 October 2023 and sets no continuing minimum. External wall assessors now arrange cover for new EWS1 work in the open market.Not specifiedPolicies sold before closure stay in force on their original terms, for the five years an EWS1 form is valid and a further 15 years. Assessors do not need to renew them or buy run off for that work.The scheme covered EWS1 forms requested for buildings above 11 metres. Government closed it because insurers were again offering the cover and lenders were relying less on the form.

Sources: IFE (Code of Conduct issued February 2026), IFSM NFRAR (register policy version 28, 29 June 2026), EWS1 scheme (guidance withdrawn 30 October 2023). Consultancies answering to more than one must meet each set of rules.

A minimum is not a recommendation. Many consultancies need more, and cover for each and every claim can protect better than an aggregate limit.

Why the minimum is rarely the right limit

There is no fixed minimum to lean on, so the limit has to follow the work. One fire strategy or external wall appraisal can sit behind a remediation bill of many millions, and one repeated method can reach every building you assessed. Fire safety cover is often written in the aggregate with defence costs inside the limit, so a single claim can use up the year. Appointments and frameworks usually name their own limit and how long to hold it.

Claim scenarios

When a claim arrives: how we would handle it

Situations fire consultants face, the risk hidden in each, and the strategy we would follow from the first letter. Choose a scenario.

Fire spreads through a block you assessed and the landlord’s insurers blame your report

The situationYour consultancy carried out a non-invasive fire risk assessment of the common parts of a converted block of flats. Eighteen months later a fire spreads through unsealed service risers. Solicitors for the landlord’s property insurers write alleging the assessment should have identified the compartmentation defects.

The riskAnswering the letter yourself to explain that a non-invasive assessment could never have seen inside the risers. The scope point may be your best defence, but replying without insurers’ consent can breach the policy. The same assessor and template were used across the landlord’s portfolio, and the notification must reflect that.

Our strategy

  1. Notify insurers at once as a claim and do no more than acknowledge the letter. PI wordings bar admissions, and defence spending, without insurers’ written consent.
  2. Name in the notification every building assessed for that landlord by the same method, so later claims from the same cause attach to this policy year.
  3. Read the fire safety endorsement first: whether fire risk assessment is carved back into cover, whether the limit for it is aggregate, and whether defence costs erode it.
  4. Assemble the scope evidence: the proposal, the agreed type of assessment, the limitations stated in the report and any recommendation for an intrusive survey that the client did not take up.
  5. Ask insurers to appoint solicitors who can also deal with the fire and rescue authority, because an investigation under the Fire Safety Order may run alongside the civil claim.

What we aim forA funded defence built on the agreed scope, one notification that protects the whole portfolio, and no admission made before insurers have seen the file.

The lessonThe limitations in your report are your defence. The notification is your cover.

A later appraisal contradicts the EWS1 form you signed

The situationIn early 2023 your consultancy signed an EWS1 form for a block of flats above 11 metres. A PAS 9980 appraisal by another firm now finds combustible insulation and missing cavity barriers. The freeholder’s solicitors say leaseholders and lenders relied on your form, and seek the cost of remediation.

The riskNotifying only the current annual policy, then finding it restricts external wall work. If cover was bought under the government backed EWS1 scheme for that building, that policy still stands on its original terms and may be the one that answers. Treating the two as alternatives can lose both.

Our strategy

  1. Establish which policies could respond: the current annual policy, and any policy issued under the EWS1 scheme before it closed on 30 October 2023. Scheme policies sold before closure remain in force.
  2. Notify each insurer on the same day with the same facts, so neither can say notice was late or that the other policy should answer first.
  3. Pull the file for that building: the instruction, what was inspected and opened up, the photographs, the option selected on the form and the reasoning recorded at the time.
  4. Have panel solicitors examine who was entitled to rely on the form, and for what purpose, before the argument turns to wall build ups and test evidence.
  5. List every other form signed on the same basis and agree with insurers which of those are circumstances to notify now.

What we aim forThe right policy identified and notified, the reliance question tested first, and other forms signed on the same basis protected.

The lessonKnow which policy covers each form you signed. Scheme cover and annual cover are separate policies.

Renewal terms add a fire safety restriction and you know of a problem building

The situationRenewal is six weeks away. Insurers propose a new restriction on fire safety claims, with an aggregate limit that includes defence costs. Meanwhile a contractor has told you, informally, that the developer of a tower you wrote the fire strategy for is investigating its smoke ventilation design.

The riskMentioning the tower only on the renewal proposal. The expiring policy, which has no restriction, would never be notified. The new policy excludes circumstances known before it starts and applies the restriction to everything else. A claim that could have had full cover ends up with reduced cover or none.

Our strategy

  1. Notify the tower to the expiring insurer now as a circumstance: the building, your role, the suspected design issue and who raised it. Awareness of a possible shortcoming in your work is enough.
  2. Review the project list for the same design approach, and notify any building where there is a specific reason to expect a claim. Vague blanket notifications are often challenged.
  3. Disclose the same matters in the renewal presentation, so the new policy cannot be challenged for a failure of fair presentation.
  4. Negotiate the restriction itself: which activities it bites on, whether strategy and assessment work is carved back in, any height threshold, and whether the retroactive date for fire safety work stays unchanged.

What we aim forThe known problem held by the unrestricted policy, the new policy cleanly presented, and a restriction narrowed to what insurers actually need.

The lessonNotify before the restriction arrives. A proposal form is not a notification.

A Defective Premises Act claim arrives over a tower completed in 2009

The situationA developer is remediating a residential tower completed in 2009. Its solicitors send a letter of claim under the Defective Premises Act 1972 over the fire strategy your consultancy wrote as a partnership, before you incorporated. You assumed anything that old was out of time.

The riskTelling the developer the claim is time barred and closing the file. Where the right to claim under section 1 of the Act arose before 28 June 2022, the limitation period is now 30 years. The cover questions are whether the retroactive date reaches 2009 and whether the company’s policy covers the old partnership’s work.

Our strategy

  1. Notify immediately. A letter of claim is a claim under the policy, and wordings require notice whatever your own view of liability or limitation.
  2. Check the retroactive date and the insured’s name. The predecessor partnership needs to be within the policy’s definition of the insured for work done before incorporation.
  3. Check how the fire safety endorsement treats historic work. Some restrictions apply by the date of the design and some by the date of the claim.
  4. Recover the 2009 file: the appointment, each revision of the strategy, the edition of Approved Document B and other guidance relied on, and what the design team was told about its assumptions.
  5. Leave limitation and the fitness for habitation test to panel solicitors. In URS v BDW the Supreme Court confirmed that a developer can be owed the duty.

What we aim forA funded defence under a policy whose retroactive date and insured definition reach the 2009 work, with limitation argued by solicitors and not by letter from the firm.

The lessonThirty years of exposure needs unbroken retroactive cover and old files you can still find.

The Regulator rejects a building control application and the developer blames your strategy

The situationYou are fire engineer on a higher-risk residential building. The Building Safety Regulator rejects the building control approval application, citing gaps in the fire and emergency file. The developer says months of delay are your responsibility and serves a notice of adjudication under your appointment.

The riskTwo traps. Your appointment says you will “ensure” that approval is obtained, a promise beyond reasonable skill and care that many wordings exclude. And cover for an adjudication can depend on telling insurers within days of the notice. Offering to redo the work free of charge may read as an admission.

Our strategy

  1. Tell us the day the notice arrives. Some wordings allow only two working days to notify an adjudication, and the timetable leaves no room for delay.
  2. Send the appointment with the notice. We look for duties above reasonable skill and care, guarantees of outcome and liquidated damages, which sit outside most PI wordings.
  3. Separate what the Regulator criticised: your strategy, information the design team owed you, or the applicant’s own compliance statement. Responsibility for the file is rarely one firm’s.
  4. Agree any revision work with insurers first, as mitigation where the wording allows, and carry it out without prejudice to liability.

What we aim forThe adjudication defended with insurers on board from day one, the contractual promise confined to reasonable skill and care, and remedial work done without an admission.

The lessonSend us the appointment before you sign it, and the adjudication notice the day it lands.

The fire authority invites your assessor to an interview under caution

The situationAfter an audit of a care home, the fire and rescue authority serves an enforcement notice on the operator and writes to your consultancy. It says your fire risk assessment was not suitable and sufficient, and invites the assessor and a director to an interview under caution.

The riskTreating it as a regulatory matter outside PI because nobody has claimed money. Many wordings fund the defence of criminal proceedings arising from professional work, but only with insurers’ prior written consent, and that cover can end on a guilty plea. Fines are not insured. A civil claim from the operator may follow.

Our strategy

  1. Notify insurers before the interview, both under the criminal defence costs cover and as a circumstance that may lead to a civil claim by the operator.
  2. Ask insurers to approve specialist regulatory solicitors now. Costs run up before consent is given are usually not paid.
  3. Do not attend, or send a written account, until those solicitors have advised. What is said at interview can be used in any later claim.
  4. Check the sub-limit and whether it covers individuals as well as the firm. A director can be prosecuted personally where an offence is attributable to their neglect.
  5. Notify the other homes assessed for the same operator by the same assessor if the authority’s criticism goes to method and not to one building.

What we aim forRepresentation funded from the first letter, the interview handled on advice, and the civil exposure already notified if the operator claims.

The lessonAn enforcement letter is a notifiable event. Get insurers’ consent before you instruct anyone.

A freelance specialist’s smoke modelling is wrong and the client claims against you

The situationYour consultancy subcontracted the smoke control modelling for a shopping centre fire strategy to a freelance specialist. The model’s assumptions were wrong, the installed system fails its commissioning tests, and the client claims the cost of redesign and delay from you.

The riskAssuming the freelancer’s insurance will deal with it. The client’s contract is with you. The freelancer’s policy may have lapsed or may exclude fire safety work, and your subconsultancy terms capped their liability at the fee. Giving away rights of recovery can prejudice your own cover.

Our strategy

  1. Notify your own insurers as a claim against the consultancy. Yours is the policy the client’s claim falls on.
  2. Check that your wording covers work done for you by subconsultants, and what insurers were told at renewal about how much modelling is subcontracted.
  3. Send us the subconsultancy terms. A cap or waiver that restricts recovery from the specialist can be excluded, so insurers need to see it at once.
  4. Ask the specialist, through insurers’ solicitors, to notify their own insurer, and obtain evidence of the policy in force now, not the one in force when the work was done.

What we aim forThe client’s claim handled under your policy, insurers’ recovery against the specialist preserved as far as the contract allows, and the arrangement properly described from then on.

The lessonCheck a subconsultant’s cover and terms before the work starts, not after the claim.

Illustrative scenarios. How any real claim is handled depends on the facts, the policy wording and insurers’ agreement.

Four things fire consultants should know about PI

The date of the work and the date of the claim are different

A claim today may concern a fire strategy or assessment issued several years ago. PI is written on a claims made basis: the policy in force when the claim is made responds, provided the work falls after the retroactive date and nothing was already notified under an earlier policy.

Claims made cover: the policy in force when the claim is made is the one that responds.

A valid notification of circumstances can connect a later claim to an earlier policy. That is why continuity matters when you change insurers or stop a particular service. How claims made cover works

Fire safety work on homes can be claimed on for up to 30 years

The Building Safety Act 2022 lengthened the time limit for claims under the Defective Premises Act 1972. Where the right to claim under section 1 arose before 28 June 2022 the period is 30 years, and for later work it is 15 years (Limitation Act 1980, section 4B). The duty falls on anyone taking on work for or in connection with the provision of a dwelling (section 1), which can include a consultant’s design. PI is written on a claims made basis, so the policy that answers is the one in force when the claim arrives. Your retroactive date and that future policy’s fire safety terms matter as much as the cover you held at the time.

No two fire safety restrictions read the same

After the cladding losses, insurers restricted fire safety cover across construction. In the Construction Leadership Council’s 2022 survey, 68% of firms reported a restriction on fire safety cover (Construction Industry Council report). The restrictions differ: a total exclusion, an exclusion for external walls only, a carve back for named services, a lower limit in the aggregate with defence costs inside it, a height threshold, or a separate retroactive date. For a consultancy whose whole income is fire safety, a restriction drafted for general designers can remove most of the policy. We read the endorsement against each service you provide and ask insurers to change what does not fit.

How your limit of indemnity works

Two unrelated covered claims of £750,000 each come to £1.5 million. Under a £1 million limit in the aggregate, the policy pays up to £1 million for the year in total. Under a £1 million limit for each and every claim, each claim has its own £1 million, subject to the policy’s aggregation wording and other terms.

The same two claims under an aggregate limit and an each and every claim limit.

Then check whether defence costs are paid in addition to the limit or use it up, and when the excess applies.

Inside the wording

Twelve clauses that decide fire consultants’ claims

Two policies with the same limit can answer the same claim very differently. These are the clauses we read first, what each means for a fire consultant and what we check.

Insuring clause and “professional business”

What it doesCovers civil liability for claims first made in the period, arising from the professional business described in the schedule and your proposal.

For a fire consultantIf the schedule says “fire risk assessors” but you also write fire strategies, sign EWS1 forms or inspect fire stopping, claims from that work may fall outside the description.

What we checkThe business description against every service you sell, including work you do only occasionally.

Fire safety and external wall restrictions

What it doesUsually an endorsement, not the printed wording, that excludes or limits claims about combustibility, cladding or the fire performance of a building.

For a fire consultantThis clause can be most of the policy. A restriction drafted for general designers may catch your core work unless assessment, strategy or appraisal services are expressly carved back in.

What we checkThe exact words, any carve back for your services, height thresholds, and whether EWS1 or PAS 9980 work is treated separately.

The limit and defence costs

What it doesThe printed wording may give a limit for each claim with costs in addition. Restricted risks are often given a lower limit in the aggregate, with defence costs inside it.

For a fire consultantFire safety claims are expensive to defend, with several parties and several experts. If costs erode an aggregate limit, one dispute can use up the year’s fire safety cover.

What we checkWhich limit applies to fire safety claims, whether costs sit inside it, and what is left for a second claim.

Aggregation

What it doesClaims arising from one originating cause or source are treated as one claim, with one limit.

For a fire consultantOne assessment template, one modelling assumption or one misread test classification can repeat across a portfolio, and one limit may not be enough for all of it. The excess may still apply to each claimant.

What we checkThe aggregation words, read with the limit, and how the excess applies where several claimants bring one claim.

Notification and circumstances

What it doesYou must notify claims, threatened claims and circumstances as soon as reasonably possible, whatever your view on liability. A notified circumstance attaches later claims to this policy.

For a fire consultantA failed inspection, a later appraisal that contradicts yours, an enforcement notice on a building you assessed, or a shortcoming you find yourself can each be a circumstance.

What we checkThe definition of a circumstance, the detail required, and how short the window is for reporting after the period ends.

Retroactive date and prior knowledge

What it doesNo cover for acts before the retroactive date, or for claims and circumstances you knew of, or ought to have known of, before the period began.

For a fire consultantWith claims possible 30 years after completion, a retroactive date reset on a change of insurer, or a later date applied to fire safety work only, can strip out most of the exposure.

What we checkThe retroactive date in the schedule and in every endorsement, and that it has carried across each change of insurer.

Contractual liability and collateral warranties

What it doesExcludes duties more onerous than the law would imply, guarantees, fitness for purpose and liquidated damages. Collateral warranties are usually covered if no wider or longer lasting than the appointment.

For a fire consultantAppointments that ask you to “ensure” compliance or regulatory approval, or warranties to funders and purchasers that outlast your appointment, can step outside cover.

What we checkEvery appointment and warranty before signature: the standard of care, duration, assignment rights and any promise of outcome.

Adjudication

What it doesCover for an adjudication can be conditional on notifying insurers within a very short time of receiving, or learning of, a notice of adjudication.

For a fire consultantDevelopers and contractors use adjudication for fire safety disputes, including Defective Premises Act claims. The timetable is counted in days, not weeks.

What we checkThe notice period, and that everyone who opens post or email knows what an adjudication notice looks like.

Criminal proceedings and inquiries

What it doesPays legal costs, usually to a sub-limit and with prior consent, for defending prosecutions under listed legislation and for representation at inquiries. Fines are not covered.

For a fire consultantFire Safety Order enforcement, a Building Safety Act investigation or an inquest after a fatal fire may each need representation long before any civil claim.

What we checkWhether fire safety legislation is within the statutes listed, the sub-limit, who is covered, and when the cover stops.

Surveys, inspections and reports

What it doesSome wordings cover survey and inspection reports only if they are made by people with stated qualifications or experience and contain stated reservations.

For a fire consultantInspections of fire stopping, fire doors and external walls can be reports in this sense. An inspector outside the stated qualification, or a report missing its limitations, can put cover in doubt.

What we checkAny qualification or wording condition, against the staff and subconsultants who actually inspect.

Subconsultants and rights of recovery

What it doesInsurers can pursue those who caused the loss. Many wordings exclude claims where you have contracted away or restricted that right.

For a fire consultantFire modelling, façade advice and intrusive surveys are often subcontracted. Accepting a specialist’s cap on liability, or waiving claims against a contractor, can restrict what insurers recover.

What we checkYour subconsultancy terms, evidence of each subconsultant’s own cover, and what your proposal says about them.

Insolvency and change of control

What it doesThe policy can end automatically on an insolvency event, and acts after a takeover or merger may not be covered unless insurers agree.

For a fire consultantWhen a consultancy is sold or merged, its past projects stay live for decades. A gap at the point of sale is a gap in the tail.

What we checkThe change of control terms before any deal completes, and who carries run off for the old entity.

The clause guide: how each part of a PI policy works

Law and duties

The Fire Safety Order, the Building Safety Act and what they ask of you

Occupied buildings: the Fire Safety Order

  • The assessment must be recorded in full. Article 9 requires the responsible person to make a fire risk assessment. Since 1 October 2023 it must be recorded in full, with the name of anyone engaged to help make it (GOV.UK, section 156 guide). Your name is on it.
  • A competence rule is waiting. Section 156 inserts article 9A, under which only a competent person may be appointed to assist with an assessment. It is not yet in force (Building Safety Act 2022, section 156). Government has since consulted on mandatory certification (MHCLG consultation).
  • External walls and flat doors are in scope. For buildings with two or more homes, the Order covers the structure, external walls, attachments such as balconies, and flat entrance doors (Fire Safety Act 2021, section 1). An assessment silent on the walls invites a question.
  • Consultants can be prosecuted. A person with a contractual obligation for the safety of premises is treated as having control to that extent (article 5). Where an offence is due to another person’s act or default, that person can be charged, as can directors (article 32).

New buildings and old liabilities: the Building Safety Act

  • Designers are dutyholders. Since 1 October 2023 anyone doing design work in England must be competent, must take all reasonable steps to ensure the design would comply if built, and is expected to refuse work beyond their skills (Building Regulations 2010, Part 2A).
  • Gateway two needs a fire and emergency file. An application for building control approval for higher-risk building work must include prescribed documents, among them a competence declaration, a Building Regulations compliance statement and a fire and emergency file (Higher-Risk Buildings Procedures Regulations 2023).
  • Thirty years for dwellings. A Defective Premises Act 1972 claim under section 1 can be brought for 30 years where the right arose before 28 June 2022, and 15 years for later work (Limitation Act 1980, section 4B). Section 2A now covers work on existing buildings containing dwellings.
  • Liability can follow the group. The High Court can make a building liability order extending a company’s liability under the Defective Premises Act, or for a building safety risk, to its associated companies where that is just and equitable (Building Safety Act 2022, section 130).

Court decisions behind these points

[2025] UKSC 21

URS Corporation Ltd v BDW Trading Ltd

A developer can be owed the Defective Premises Act duty by its consultant, and the 30 year period reaches related negligence and contribution claims.

Read the judgment

[2022] EWHC 1813 (TCC)

Martlet Homes Ltd v Mulalley & Co Ltd

Common practice and a product certificate did not excuse specifying a combustible external wall system. Waking watch costs were recoverable.

Read the judgment

[2023] EWHC 2620 (TCC)

Lendlease Construction (Europe) Ltd v Aecom Ltd

A claim over fire compartmentation and fire stopping design at a hospital failed on limitation, an earlier settlement and proof of loss.

Read the judgment

[2019] EWCA Civ 1423

Herons Court v Heronslea Ltd

An approved inspector does not owe the Defective Premises Act duty, which falls on those who contribute positively to creating the dwelling.

Read the judgment

[2024] EWHC 3235 (TCC)

BDW Trading Ltd v Ardmore Construction Ltd

An adjudicator could decide a Defective Premises Act claim over fire safety defects in flats completed about 20 years earlier. The award was enforced.

Read the judgment

These decisions explain where a professional’s duty lies. They do not decide whether a particular policy responds.

Specialist work

The work that changes your cover

A short label on a proposal form hides what insurers care about. These are the areas where we ask most, starting with two that are reshaping the profession: the coming regulation of fire engineers and assessors, and external wall work.

Regulation is coming: who will be allowed to sign, and for which buildings?

Government accepted the Grenfell Tower Inquiry’s Phase 2 recommendations and has said it will legislate to regulate both the title and the function of a “fire engineer”, with only registered individuals able to carry out restricted functions (GOV.UK, next steps on fire engineering reform). Its advisory panel expects the fire safety strategy to be the central protected function (Authoritative Statement).

For fire risk assessors, a consultation on mandatory certification closed in June 2026. It proposes tiers of competence building on BS 8674, a central register, and offences that would include working above your certified level. Primary legislation is to follow, with a government response due in the last quarter of 2026 (GOV.UK, September 2026 progress report).

None of these papers sets a PI requirement yet. But registration concentrates responsibility on the individual who signs, and insurers already ask who that is. We present each signatory’s registration, tier and the building types they sign, and we watch for the point at which a regulator sets insurance terms of its own.

External walls: EWS1 forms and PAS 9980 appraisals

External wall work is where insurers restrict cover most. Government ran a backed PI scheme for EWS1 assessors and closed it on 30 October 2023, saying insurers were again offering the cover. Policies sold before closure remain in force for the life of the form and a further 15 years (GOV.UK, EWS1 PII scheme). Every form signed since sits on your annual policy, on whatever terms that policy gives external wall work.

PAS 9980 gives the method for a fire risk appraisal of the external walls of existing blocks of flats (BSI, PAS 9980). It is a separate discipline: the competence standard for fire risk assessors, BS 8674, expressly leaves these appraisals out of its scope (BSI, BS 8674:2025).

We ask who signs and on what qualification, how many forms and appraisals have been issued and at what heights, how much was opened up, what the report says about reliance, and whether a scheme policy was bought for any building.

Fire strategies: following the guidance or engineering from first principles?

Insurers distinguish a strategy that follows Approved Document B or BS 9999 from a performance based solution under BS 7974 that departs from the guidance and rests on your own analysis. We set out the share of each, who reviews the engineered work, and whether modelling is done in house.

The guidance is also moving. Changes to Approved Document B took effect on 2 March 2025, including sprinklers in all new care homes. From 30 September 2026 the guidance provides for second staircases in residential buildings over 18 metres, and the national fire resistance classes are withdrawn from 2 September 2029 (GOV.UK, Approved Document B updates). Record in every strategy which edition you designed to.

Fire risk assessments: which buildings, which tier, who validates?

BS 8674:2025 sets three levels of assessor competence, foundation, intermediate and advanced, matched to the complexity of the building (BSI). In a 2023 government survey, only 46% of assessors who responded belonged to a certification or registration scheme (MHCLG consultation).

Under BAFE SP205, certification is given to the organisation by a UKAS accredited certification body. Each assessment is signed off by a validator and assessor competence is reviewed at least every 36 months (BAFE). For housing, BS 9792:2025 replaced PAS 79-2 (BSI).

We ask for the split by building type, the volume each assessor signs, how validation works and what your reports say about their limits.

Historic high rise and cladding work: what has to be disclosed?

Before the policy is agreed you must make a fair presentation of the risk, disclosing every material circumstance you know or ought to know (Insurance Act 2015, section 3). For a fire consultancy that includes the past: projects over 11 and 18 metres, external wall work, buildings now in a remediation programme and buildings where an authority has taken enforcement action.

With a 30 year period for some claims, the work of predecessor firms and practices you bought counts too. “We no longer do high rise” does not answer the question. We build a schedule with you: building, height, your role, date, client and current status. Fair presentation explained

Site inspections, fire stopping and fire door surveys

The Fire Safety (England) Regulations 2022 require quarterly checks of communal fire doors and annual checks of flat entrance doors in residential buildings over 11 metres (GOV.UK). Many consultancies now offer these inspections alongside fire stopping surveys.

Insurers ask whether you inspect, certify or supervise, and what your report says it does not cover. Sampling rates, photographs and plain limits on what was seen are your record. If you also install or repair, that is contracting work, which a consultant’s PI wording usually excludes.

Dutyholder roles on higher-risk buildings

On higher-risk building work, broadly buildings of at least 18 metres or seven storeys with two or more residential units (Building Safety Act 2022, section 65), a fire engineer is a designer with statutory duties and may be asked to take a wider coordinating role.

Before you are appointed, whoever appoints you must ask whether a serious sanction has occurred in the past five years. That includes a conviction under the Fire Safety Order and a compliance notice concerning Part B (Building Regulations 2010, regulation 11E). Anything you would have to declare to a client is something insurers should hear about first.

Subconsultants, freelancers and specialist modelling

Your client looks to you for the whole service, whoever ran the model or opened up the wall. We ask which work is subcontracted, what share of fees it represents, who checks the output and what the terms say about liability and insurance.

A freelance assessor working under your name and supervision may be treated as your employee under the wording. An independent specialist is not, and needs cover of their own, on terms that do not exclude the work they do for you. Freelancers and subconsultants

Your presentation

A proposal should explain the work behind the numbers

An unexplained label can make a modest exposure look broader than it is, while a vague one can hide an important responsibility. Here is how we turn brief answers into a picture insurers can underwrite properly.

Brief proposal answers and what we send instead
What insurers often seeWhat we send instead
“Fire safety consultancy, 100%.”The split between strategies, risk assessments, external wall appraisals, inspections and expert work, with fees and the number of instructions for each.
“No cladding work.”Every EWS1 form and external wall appraisal you have signed, by building and height, and what your other reports say about walls.
“We only do low rise.”A schedule of past projects over 11 and 18 metres, with your role, the date and the current status of each building.
“All staff suitably qualified.”Each signatory’s registration, register tier and certification, and the building types each one is permitted to sign.
“Reports are checked.”Who validates, what share of reports is sampled, and what happens when the reviewer disagrees with the author.
“No claims or circumstances.”Buildings in remediation, enforcement action, later reports that contradict yours and complaints, with what insurers have already been told.

Illustrations of common answers, not statements about particular clients.

How we handle your renewal

  1. You send what you haveSchedule, wording, endorsements, last proposal and your renewal date.
  2. We find what needs explainingFire safety restrictions, external wall work, high rise history, signatories’ registrations, subconsultants and buildings now in remediation.
  3. We approach suited insurersFrom more than 30 insurers, specialist agencies and Lloyd’s, chosen for the work you do.
  4. We compare the wordingsCover, clauses, excess and limits side by side, with the differences explained.

Consultancy changes

When your consultancy changes, the insurance needs reviewing

Buying another consultancy

Its past assessments and strategies come with it. Establish who insures that history, see its claims and notification record, and check that your retroactive date and fire safety terms extend to its work.

Incorporating or restructuring

Make sure the old partnership or sole trader is covered as a predecessor on the new entity’s policy, and that the retroactive date reaches back to the earliest project.

A signatory leaving

The consultancy stays liable for what they signed. Keep their files and recorded reasoning. The individual should confirm how past work is covered and what a new employer’s policy takes on.

Changing insurer

Notify everything known to the outgoing insurer first, disclose it to the new one, and compare the fire safety endorsements word for word. A new restriction applies to old work claimed on later.

Stopping a service

Ceasing EWS1 or high rise work does not end the exposure. The policy must still describe the past activity, so insurers do not treat it as work you never did.

Retirement or closure

With some claims possible for 15 to 30 years, run off needs planning well before you stop: how long, what limit, on what fire safety terms, and who maintains it after a sale.

Run off cover explained

What if insurers decline to offer fire safety cover at renewal?

Talk to us early, ideally three months ahead. The market for this work has reopened in places: government closed its EWS1 scheme in October 2023 because insurers were again offering that cover (GOV.UK). Terms still vary widely, so the presentation matters. Before the old policy ends, notify every known circumstance to it, because that chance does not come back after expiry. Then we look at what any restriction would leave you able to do, and whether your appointments and registers allow you to keep working on those terms. How we handle renewals

Alongside your PI

Public liability and D&O cover to consider alongside your PI

PI answers claims about your professional work. It is not built for injury or damage you cause on site, or for a director’s own defence when an enforcing authority pursues them personally. Fire consultants open up walls and ceilings in occupied buildings, and fire safety law reaches individuals, so we recommend considering both.

Which policy responds?

Tap a situation for the explanation. A general guide only: the answer always depends on the actual wordings.

SituationPIPublic liabilityD&O
An intrusive survey brings down a ceiling and injures a residentNot built for itBuilt for itNot built for it

Injury and property damage caused by your physical activities on site are public liability risks. PI wordings usually leave them to other policies.

A fire spreads because your assessment missed a defectBuilt for itMay respondNot built for it

Loss flowing from negligent advice is what PI is built for, subject to any fire safety restriction. Public liability policies commonly exclude professional advice given for a fee, so do not rely on one for this.

A director is prosecuted personally under the Fire Safety OrderMay respondNot built for itBuilt for it

PI may fund the defence of proceedings arising from professional work, to a sub-limit and with consent. D&O is designed for a director’s own defence costs where an offence is said to be attributable to their consent, connivance or neglect. Fines are not insured.

A contractor’s employee trips over your equipment on siteNot built for itBuilt for itNot built for it

A public liability claim. Site rules and framework agreements often set a minimum public liability limit before you are allowed on site.

A building liability order is sought against your holding companyMay respondNot built for itMay respond

The underlying liability is a professional one, so PI is the starting point, but only for entities within the definition of the insured. D&O may respond to claims against directors over how the group was run. The wordings decide.

Built for itMay respondNot built for it

Public liability explained: site work, intrusive surveys and the advice exclusion

Public liability covers your legal liability for injury to other people and damage to their property arising from your activities.

  • Site visits and inspections. Ladders, access equipment, plant rooms and occupied flats.
  • Intrusive surveys. Opening up ceilings, risers and external walls, and making good afterwards. Check whether the policy covers damage to the part you are working on.
  • The advice exclusion. Most public liability policies exclude loss arising from professional advice, design or specification. That is the line where PI takes over.

The two policies should be read side by side so that injury following negligent advice does not fall between them.

D&O explained: personal exposure under fire safety law

Directors’ and officers’ cover protects individuals, not the company’s professional work. Under the Fire Safety Order, where a company’s offence is committed with the consent or connivance of a director, or is attributable to their neglect, the director is guilty as well (article 32). The Building Safety Act 2022 has an equivalent provision for offences under Parts 2 and 4 (section 161).

D&O can pay for an individual’s legal representation in investigations and prosecutions and can respond to claims against directors personally. It does not pay fines and it is no substitute for PI. We recommend considering it where directors sign reports themselves or hold dutyholder responsibilities.

The other covers we arrange

The other covers we arrange

Proposal form

Prefer to fill in a form?

Ask us for the appropriate proposal form, or send us your details when you request a quote.

Beyond the policy

Claims support and contract reviews

If you receive a complaint or become aware of something that could lead to a claim, email [email protected], or call 0333 222 4257 if it is urgent or sensitive. We report the matter, follow up with the insurer and explain updates. If a deadline is near, follow the notification instructions in your policy immediately. Do not admit liability before speaking to us.

Before you sign, send us the appointment, collateral warranty, reliance letter or framework terms you have been asked to accept, with the scope of service and the building’s height and use, highlighting any promise to ensure compliance or approval. We can flag insurance points to discuss with you and, where needed, your insurer. Your solicitor can advise on the legal effect. A review cannot guarantee cover for a claim.

Claims support  ·  Contract reviews

Review your cover

Let a specialist read your PI cover

Send us your current schedules, wordings, endorsements and renewal information. Tell us about external wall work, high rise projects past and present, your signatories’ registrations and any building now in remediation. We will tell you where the cover fits your consultancy, where it does not, and what we would change.

Speak to a PI specialistSend us your renewalGet a quote

  • Your schedule, policy wording and every endorsement
  • The fire safety or cladding restriction, in full
  • Renewal date and your last proposal form
  • Your fee split by service and building type
  • A list of projects over 11 metres, past and present
  • Signatories’ registrations, and anything that needs explaining