We would like to set optional cookies to understand how the site is used. Essential cookies keep forms working. Cookie policy.

Home / Who we cover / Interior designers

Interior designers

Professional indemnity for interior designers

Interior designers’ PI, read clause by clause by specialist brokers. We know where design claims start: finishes that fail, budgets that overrun, goods bought and resold, and dutyholder roles under CDM and the Building Regulations that land on the designer by default.

Speak to a PI specialistSend us your renewal for reviewGet a quote

  • Since 1990Specialist PI brokers
  • 30+ insurersPlus specialist agencies and Lloyd’s
  • 4.9 out of 5From 228 Google reviews
  • FCA authorisedFRN 302911, independently owned

Your map

The interior designers map: from your work to the policy and beyond

Your practice’s work on one side, the policy on the other. Select a point to see what it connects to, then follow the link to the part of this page that explains it.

Still 3D render (motion off)

The map, area by area

Each heading below is one area of the map, and the number shows how many points it holds. Open a heading and tap any point: it lights up on the map with everything it connects to, and a short note explains why.

Practice and business risks 11

Your terms and framework agreements 8

Appointments and contracts 6

Legislation 3

Policy documents and schedule 9

Main policy wording 8

Exclusions and restrictions 3

Succession, closure and earlier work 4

Other insurance and final assessment 9

Our experience

Why interior designers come to a specialist

Two studios with the same fees can carry very different risks. One sells design advice only. Another specifies fire rated finishes for a hotel, buys and resells furniture in its own name, manages the trades on site and acts as principal designer. Each step moves the work further from a standard PI policy’s idea of design.

Hammond PI has specialised in professional indemnity since 1990. We read the wording itself: how each insurer defines your professional business, treats goods you supply and works you contract for, handles fitness for purpose promises, fee disputes and fire safety, and where its geographical limits stop. Then we present your practice so insurers underwrite the work you actually do.

When a problem arises we stay involved. We put the matter to insurers in the right terms, gather the appointment, drawings and specifications they need, and follow it through with the claims handler.

  1. The workConcept, layouts, FF&E schedules, procurement, site visits and dutyholder roles, in the proportions you really do them
  2. What can go wrongFinishes that fail, budgets missed, wrong dimensions, goods not as promised, a role you never meant to hold
  3. What the policy must answerBusiness definition, supply and contracting exclusions, warranties, fees, notification, limits and where you work
  4. How we present itA clear account of each service, your appointment terms and the checks behind your specifications

Who requires PI

Check what your professional body and your contracts require

No statute makes PI compulsory for interior designers, and neither BIID nor SBID sets a figure. The requirement comes from your membership, your appointment and your client’s contract. Registered architects working on interiors answer to ARB as well.

PI requirements: Who requires PI
WhoMinimum coverExcessAfter you stopOther conditions
British Institute of Interior DesignNo figure is set. Registered Interior Designers must hold professional indemnity and public liability insurance, and every member must have insurance adequate to cover any claims relating to their professional activities (Code, section 7).Not specifiedNot specifiedAny insurer. Your written appointment must confirm adequate and appropriate insurances for the project, and you should take reasonable steps to see that subcontractors you engage are insured for their role.
Society of British and International Interior DesignNo figure is set. Members must hold and maintain PI cover that is appropriate for the size of their financial transactions, their income, their type of work and the client money they hold each year (Code, clause 8.6).Not specifiedNot specifiedPI is a condition of Associate and Accredited membership. Client money must be held in a designated client money account, with records of every dealing.
Architects Registration Board (if you are a registered architect)ARB expects a minimum of £250,000 for each and every claim. Only registered persons may practise under a title containing the word “architect”. The Architects Act excepts naval, landscape and golf-course architects only. Basis: each and every claim. Fire safety, asbestos and pollution cover may be on an aggregate basis.No figure setAt least six years after ceasing practice (five in Scotland), at the level held in the final yearRestricted fire safety cover is acceptable only where nothing wider can be found after reasonable steps. Work must not be carried out under a complete exclusion.

Sources: BIID (Code of Conduct, 1 April 2026), SBID (Code of Conduct as published, November 2026), ARB (PII guidance, October 2022 version). Practices answering to more than one must meet each set of rules.

A minimum is not a recommendation. Many practices need more, and cover for each and every claim can protect better than an aggregate limit.

Why the minimum is rarely the right limit

Where no figure is set, the limit is your decision, and most clients write one into the appointment. Start from the largest realistic claim: the cost of stripping out and redoing a scheme, not your fee. A failed finish in a hotel or restaurant also brings lost trading while rooms are closed. Check that the limit applies to each and every claim, and whether fire safety or any other cover is restricted to a lower aggregate figure.

Claim scenarios

When a claim arrives: how we would handle it

Situations interior designers face, the risk hidden in each, and the strategy we would follow from the first letter. Choose a scenario.

Banquette seating you bought and resold starts to fail

The situationYou designed a restaurant and supplied the banquette seating yourself, buying from a workshop and invoicing the client with your mark up. Within a year the frames loosen and the covers split. The operator’s solicitors claim the cost of replacement and lost trade while the seating is out.

The riskAssuming PI responds because you are the designer. Many wordings exclude claims arising from the sale or supply of goods, and your mark up is not insured. If the letter is answered as a product complaint, a real allegation of negligent specification can go unnotified.

Our strategy

  1. Notify insurers at once, setting out both allegations: the goods were defective, and the construction and fabric were wrongly specified for commercial use. The second is a design allegation.
  2. Separate what you did as designer from what you did as seller: the specification, the drawings sent to the workshop, the order and your invoice. That split frames the coverage discussion.
  3. Check your terms with the workshop for rights against it, and put the workshop on notice in writing. Insurers will want those rights kept intact.
  4. Ask insurers to confirm in writing which parts of the claim they accept, so you know early what rests with you and the workshop.
  5. Agree any offer to repair or replace with insurers before it is made, so a commercial gesture is not treated as an admission.

What we aim forThe specification allegation defended under PI, the workshop brought in for its share, and no step taken that puts the policy at risk.

The lessonOnce you invoice the goods you are the seller. Tell us before you procure in your own name.

A hotel’s corridor wallcovering fails building control weeks before opening

The situationYou specified a textile wallcovering for the corridors of a 60 bedroom hotel. At final inspection the building control body asks for its reaction to fire classification. The product does not reach the class expected for circulation spaces. Opening is five weeks away and the operator is taking bookings.

The riskQuietly paying to replace the wallcovering to protect the relationship. That can be an admission and an unauthorised cost. Some policies also restrict or exclude fire safety claims, so the practice may be spending money it wrongly assumes insurers will repay.

Our strategy

  1. Notify the same day as a circumstance, with the specification, the product data sheet, the fire strategy and who approved the finishes schedule. No claim exists yet, but one is likely.
  2. Read the schedule and endorsements for any fire safety restriction before anything else. If cover is limited or aggregated, the practice needs to know now.
  3. Ask insurers to agree replacement before opening as mitigation, where the wording allows. A stripped corridor costs less than a hotel that cannot open.
  4. Establish who else carried the duty: the principal designer, the fire engineer, and the contractor who ordered and installed without checking the classification.
  5. Keep the operator informed in neutral terms agreed with insurers: what is being done and when, with no acceptance of fault.

What we aim forThe hotel opens on time with compliant linings, the cost is dealt with under the policy so far as it allows, and others who shared the duty contribute.

The lessonRecord the fire classification beside every wall and ceiling finish you specify.

A homeowner says you were the principal designer all along

The situationYou designed the refurbishment of a house for a private client, who appointed a builder and several trades directly. Nobody was appointed principal designer. Your layout opened the staircase to the living space. Building control will not issue a completion certificate, and the client’s solicitors say the failure is yours.

The riskReplying that you “only did the interiors”. Where a domestic client appoints nobody, the designer in control of the design phase is the principal designer under both CDM 2015 and the Building Regulations. Denying a role the law may have given you weakens the defence.

Our strategy

  1. Notify insurers immediately with the appointment, the drawings and the building control correspondence, and say plainly that the principal designer role is in issue.
  2. Check that your proposal described the work accurately. If principal designer duties were never mentioned to insurers, we would deal with that point openly and early.
  3. Establish who really controlled the design phase: whether an architect, an engineer or the builder produced the drawings submitted for building control.
  4. Gather what you told the client about their duties and about the need for building control and fire advice. Your emails may be the best record.
  5. Let panel solicitors answer the letter. The remedy may be modest if it is agreed with building control before positions harden.

What we aim forA funded defence on who held the role, a practical fix agreed with building control, and no dispute with insurers about undisclosed activities.

The lessonOn domestic projects, record in writing who is principal designer before you draw anything.

The scheme prices at £650,000 against a £400,000 budget

The situationA client briefed you to refurbish a house for £400,000 including furnishings. You developed the scheme to tender without a cost check. The lowest tender is £650,000. The client refuses to pay your last two invoices and demands the return of fees already paid, plus the cost of redesign.

The riskTreating it as a debt and suing for the fees. Most wordings exclude the return of fees, but the letter also alleges negligent cost advice, which PI is for. Issuing proceedings before notifying invites a counterclaim that insurers first hear about from the court papers.

Our strategy

  1. Notify before chasing the invoices. A client who withholds fees after a complaint is a circumstance under many wordings, even where no claim has been made.
  2. Separate the heads: fees to be refunded (often excluded), unpaid fees (your own loss), and the client’s wasted costs and redesign (the negligence claim).
  3. Assemble the brief, every budget figure given or received, any cost plan, and what you said about allowances for furnishings, fees and VAT.
  4. Ask insurers to appoint solicitors for the response, and agree with them how the fee claim and the defence will run together.
  5. If a commercial deal on fees makes sense, agree it with insurers in writing first, with no admission.

What we aim forThe negligence allegation defended at insurers’ cost, the fee position resolved on agreed terms, and the policy conditions kept.

The lessonWrite the budget into the brief and check the scheme against it at every stage.

A restaurant operator serves an adjudication notice on a Friday afternoon

The situationYou designed a restaurant fit out for an operator under a written appointment. The bar and kitchen pass do not fit as drawn, and opening slipped by six weeks. On Friday afternoon the operator serves notice of adjudication, claiming £180,000 for abortive joinery and lost trading.

The riskLeaving it until Monday, or handing it to your own solicitor first. Design appointments on commercial projects are usually construction contracts, so adjudication can start at any time and a decision can follow within 28 days of referral. Some policies require notice within two working days.

Our strategy

  1. Send us the notice the day it arrives. We would notify insurers at once and confirm that the wording’s adjudication conditions are met.
  2. Ask insurers to appoint solicitors immediately. The adjudicator may be in place within 7 days, and the response is prepared in days, not months.
  3. Pull together the appointment, the drawings by revision, the site survey you relied on and the joiner’s shop drawings. Dimension disputes turn on who checked what.
  4. Check the appointment for a net contribution clause and a liability cap, and whether the joiner or the contractor should share responsibility.

What we aim forA properly resourced response inside the timetable, the policy conditions met, and the contractor’s share of responsibility in front of the adjudicator.

The lessonAn adjudication notice is the most urgent document your practice can receive. Call us the same day.

A wall marked “remove” on your layout turns out to be structural

The situationYour layout for a flat showed the wall between kitchen and dining room as removed. The client’s builder took it out without an engineer. Cracks appear in the flat above. The freeholder’s surveyor and the upstairs owner both write to you, and the client says you told them it could go.

The riskExplaining yourself directly to the neighbour and the freeholder, or offering to pay for repairs. Three parties may now claim, and what you say to one will be used by the others. The builder’s responsibility can be lost in the noise.

Our strategy

  1. Notify insurers of all three potential claimants in one notification: the client, the upstairs owner and the freeholder.
  2. Make no admission and no offer. Acknowledge the letters and say only that the matter has been passed on.
  3. Gather the appointment and scope, the drawing and its notes, and any message telling the client to take structural advice and obtain the landlord’s consent.
  4. Identify the builder and its insurers, and whether a licence to alter was obtained. A builder who removed a wall without support may carry much of the responsibility.
  5. Ask insurers to appoint an engineer early, so the cause and the repair are established once, for everyone.

What we aim forOne coordinated defence, the builder brought in, and a repair scope fixed by an independent engineer before costs grow.

The lessonEvery layout that removes or opens a wall should say who must confirm it is safe to do so.

A villa client abroad threatens proceedings in the local court

The situationYou designed the interiors of a villa abroad for a client who lives there, working mostly from London with four site visits. Stone you specified has stained and lifted around the pool terrace. The client’s local lawyers threaten proceedings in the local court under local law.

The riskFinding out now that the policy’s geographical and jurisdiction limits stop at the UK or Europe. Some wordings exclude work carried out outside the stated territory, and claims brought or judgments enforced under another country’s law. The appointment was signed on the client’s terms.

Our strategy

  1. Before you sign any overseas appointment, send it to us. We would check the territory and jurisdiction on your schedule and ask insurers to extend them if needed.
  2. Aim for English law and courts in the appointment. Where the client will not agree, tell insurers so the position is underwritten, not discovered.
  3. When the letter arrives, notify at once with the appointment, the specification and the supplier’s technical data.
  4. Ask insurers to instruct lawyers who can deal with the local court, and keep intact any right against the stone supplier and the installer.

What we aim forA claim that falls inside the territory and jurisdiction the policy states, defended by lawyers in the right country.

The lessonWhere the project is, where the client lives and which law governs must all match your schedule.

Illustrative scenarios. How any real claim is handled depends on the facts, the policy wording and insurers’ agreement.

Four things interior designers should know about PI

The date of the work and the date of the claim are different

A claim today may concern a scheme you specified several years ago. PI is written on a claims made basis: the policy in force when the claim is made responds, provided the work falls after the retroactive date and nothing was already notified under an earlier policy.

Claims made cover: the policy in force when the claim is made is the one that responds.

A valid notification of circumstances can connect a later claim to an earlier policy. That is why continuity matters when you change insurers or stop a particular service. How claims made cover works

You can be principal designer without ever being appointed

If a domestic client appoints nobody, the designer in control of the pre-construction phase is the principal designer under CDM 2015 (CDM 2015, regulation 7). The Building Regulations dutyholder rules, in force since 1 October 2023, say the same of the designer in control of the design phase (Building Regulations 2010, regulation 11C). HSE names interior designers among designers (HSE, designers). The BIID Code requires members to confirm in writing whether or not they will act as principal designer (BIID, Code of Conduct). If you may hold the role, insurers need to know, because it is wider than interior design.

Reselling goods makes you the seller, not only the designer

If you buy furniture or fittings and invoice your client for them, you are the trader who supplied the goods. To a consumer you answer for their quality, fitness for purpose and description, and a contract term cannot take those rights away (Consumer Rights Act 2015, sections 9 to 11, section 31). Many PI wordings exclude claims arising from the sale or supply of goods, and do not insure your mark up. Ordering as the client’s disclosed agent, so that the client contracts with the supplier, can be a different legal position. Tell us which you do, and how much.

How your limit of indemnity works

Two unrelated covered claims of £750,000 each come to £1.5 million. Under a £1 million limit in the aggregate, the policy pays up to £1 million for the year in total. Under a £1 million limit for each and every claim, each claim has its own £1 million, subject to the policy’s aggregation wording and other terms.

The same two claims under an aggregate limit and an each and every claim limit.

Then check whether defence costs are paid in addition to the limit or use it up, and when the excess applies.

Inside the wording

Twelve clauses that decide interior designers’ claims

Two policies with the same limit can answer the same claim very differently. These are the clauses we read first, what each means for an interior designer and what we check.

Insuring clause and “professional business”

What it doesCovers civil liability for claims first made in the period that arise from your professional business, usually defined as the work ordinarily expected of the type of firm named in the schedule and described in the proposal.

For an interior designer“Interior designer” on the schedule may not obviously include project management, procurement, principal designer duties or lighting and kitchen design. Work outside the description can fall outside cover.

What we checkThe business description against every service you invoice for, with any dutyholder roles stated.

Sale and supply of goods

What it doesMany design wordings exclude claims arising from the manufacture, sale, supply, installation or repair of any product, by you or by your sub-contractors.

For an interior designerFurniture, lighting and joinery bought and resold under your own invoice can sit behind this exclusion, even where your specification was the real problem.

What we checkWhether negligent design or specification is written back into cover, and how your procurement is described on the proposal.

Contracts to build or install

What it doesUsually excludes the construction, installation, alteration or repair of a building where you or your sub-contractor contracted to carry out the work.

For an interior designerIf your studio employs the decorators, joiners or builder and charges the client for the works, you are contracting, not only designing.

What we checkWhether any contracting activity is declared and covered, and who the trades actually contract with.

Injury and property damage

What it doesBodily injury and property damage are usually covered only where they result from negligent advice, design or specification.

For an interior designerA shelf that falls because of your detail may be a PI matter. A client’s floor scratched by your team on install day is not.

What we checkThat the design and specification write back is present, and where the policy stops for accidents on site.

Fitness for purpose and guarantees

What it doesUsually excludes duties more onerous than reasonable skill and care, including guarantees, express warranties, fitness for purpose promises and liquidated damages.

For an interior designerPromising that a scheme will “meet the budget”, “comply with all regulations” or “be suitable for hotel use” can go beyond the standard the policy insures.

What we checkAppointment and warranty wording before you sign, and how the policy treats collateral warranties.

Fees, overcharging and mark up

What it doesMany wordings exclude the return or reduction of fees, allegations of overcharging, and your own lost profit or mark up.

For an interior designerDesign disputes often begin as an argument about fees or the price of goods. The negligence allegation beside it may be covered. The refund usually is not.

What we checkHow fee refunds, unpaid fees and procurement margins are treated, and whether any fee recovery extension applies.

Notification and circumstances

What it doesYou must notify claims, threats of claims and circumstances as soon as reasonably possible. Some wordings exclude anything notified more than a few days after the period ends.

For an interior designerA snagging list that will not close, a client withholding fees after a complaint, or a failed inspection can each be a circumstance.

What we checkThe definition of a circumstance, the time limits, and what happens if notice is late.

Adjudication

What it doesSome wordings cover adjudication only if insurers are told within two working days of the notice, and the timetable is no more onerous than the statutory scheme.

For an interior designerCommercial fit out appointments usually carry a right to adjudicate at any time. The notice may reach a small studio by email on a Friday.

What we checkThe notice period, any conditions on the adjudicator and timetable, and the adjudication clause in your appointment.

Aggregation

What it doesClaims arising from one originating cause or source are usually treated as one claim, with one limit.

For an interior designerThe same wrong specification repeated across forty hotel bedrooms, or a roll out of shops, may be one claim. One limit then has to cover all of it.

What we checkThe aggregation words, read with whether your limit is each and every claim or in the aggregate.

Defence and prosecution costs

What it doesDefence costs are often paid in addition to the limit. Some wordings add a sub-limit for defending prosecutions under health and safety, building regulation or listed building law.

For an interior designerDutyholder duties are backed by criminal law, and unauthorised works to a listed interior are an offence. Fines themselves are not insured.

What we checkWhether costs sit inside or in addition to the limit, and the prosecution extension and its sub-limit.

Rights of recovery and sub-consultants

What it doesInsurers take over your rights against others. Many wordings exclude claims where you have agreed to restrict those rights.

For an interior designerAccepting a workshop’s or sub-consultant’s terms that cap its liability can leave you carrying its mistake. Freelancers under your direction are usually treated as your staff. Independent consultants are not.

What we checkSupplier and sub-consultant terms, their own PI, and how the wording defines freelancers.

Territory and jurisdiction

What it doesThe schedule states where work may be carried out, and which countries’ courts and law the policy answers to. Outside those, there may be no cover.

For an interior designerA London studio designing a villa or hotel abroad may be inside one limit and outside the other.

What we checkGeographical and jurisdiction limits against your project list, and the governing law in each appointment.

The clause guide: how each part of a PI policy works

Law and duties

The duties that come with a drawing: CDM, the Building Regulations and consumer law

On the project

  • You are a CDM designer. HSE lists interior designers among designers. You must not start work unless the client is aware of its duties, and you must design out foreseeable health and safety risks so far as reasonably practicable (CDM 2015, regulation 9).
  • Building Regulations dutyholders. Since 1 October 2023 anyone doing design work must be competent, and must take all reasonable steps so that work built to the design would comply with the Building Regulations (Building Regulations 2010, regulation 11K).
  • Work in homes. A business that takes on work on a building containing a dwelling must do it professionally, so the dwelling is fit for habitation. Claims can be brought for 15 years (Defective Premises Act 1972, section 2A, Building Safety Act 2022, section 135).
  • Tall residential buildings. A building of at least 18 metres or 7 storeys with 2 or more residential units is higher-risk. Most building work in one, including changing a flat’s internal layout, needs Building Safety Regulator approval before it starts (GOV.UK, higher-risk buildings).

With your client

  • Reasonable care and skill. Every consumer contract for services includes it, and no term can exclude it or stop the consumer recovering the price paid (Consumer Rights Act 2015, section 49, section 57). Business appointments carry the same implied term (SGSA 1982, section 13).
  • Cancellation rights. A consumer who contracts at a distance or away from your premises can usually cancel within 14 days, and longer if the required information was not given. Goods made to the consumer’s specifications are excepted (Consumer Contracts Regulations 2013).
  • Adjudication. An agreement to do design work, or to advise on interior decoration, in relation to construction operations is a construction contract, so either party can adjudicate at any time. Contracts with residential occupiers are excepted (Construction Act 1996, section 104, section 106).
  • Copyright. The author is the first owner of copyright in drawings and designs, or the employer where an employee made them. An assignment is effective only if it is in writing and signed (CDPA 1988, section 11, section 90).

Court decisions behind these points

[2020] EWHC 3393 (TCC)

Alebrahim v BM Design London Ltd

An interior designer’s procurement duties were those in its written terms. Estimates bound the client once accepted, and the court would not imply wider obligations.

Read the judgment

[2019] EWHC 454 (TCC)

Freeborn v Marcal

A home cinema was built to a design the clients never approved. A written brief is essential, and changes to it must be recorded in writing.

Read the judgment

[2017] EWHC 2574 (TCC)

Riva Properties v Foster + Partners

A designer must find out whether the client has a budget and take it into account in the design. It cannot simply be ignored.

Read the judgment

[2017] EWCA Civ 254

Lejonvarn v Burgess

A professional who designed and managed a project for friends, with no fee and no contract, still owed a duty of care in the services she actually provided.

Read the judgment

[2014] EWCA Civ 316

West v Ian Finlay & Associates

A net contribution clause in an appointment with consumer clients was clear, fair and reasonable. It limited the designer to its own share when the contractor was insolvent.

Read the judgment

[2016] EWHC 3583 (Ch)

Signature Realty v Fortis Developments

Planning permission carries no rights in the drawings. A developer that copied an architect’s drawings, downloaded from a planning portal, for its own scheme infringed copyright.

Read the judgment

These decisions explain where a professional’s duty lies. They do not decide whether a particular policy responds.

Specialist work

The work that changes your cover

A short label on a proposal form often hides the question insurers most need answered. These are the areas where we ask most, starting with two that are changing now: the Building Regulations dutyholder regime and fire performance.

Building Regulations dutyholders: are you the principal designer without knowing it?

Since 1 October 2023 the Building Regulations in England have carried their own dutyholder regime, separate from CDM. Anyone carrying out design work must have the skills, knowledge, experience and behaviours for it, must not start until satisfied the client knows its duties, and must take all reasonable steps so that work built to the design would comply (GOV.UK, design and building work).

Where more than one contractor is involved, the client must appoint in writing a principal designer, the designer with control over the design work, to plan, manage, monitor and coordinate it. If a domestic client appoints nobody, the designer in control of the design phase holds the role by default (Building Regulations 2010, regulation 11C).

On a refurbishment with no architect, that can be you. We ask which projects involve building work, who is appointed principal designer on each, how you evidence competence, and whether you work in higher-risk buildings. Insurers treat the principal designer role as a distinct activity. It should be declared, not discovered.

Fire performance: what classification does each finish and furnishing need?

Wall and ceiling linings are controlled by the Building Regulations. Approved Document B expects class B-s3, d2 in circulation spaces, C-s3, d2 in other rooms, and D-s3, d2 only in small rooms of up to 30 square metres in non-residential accommodation and 4 square metres in residential (GOV.UK, Approved Document B, volume 2, table 6.1). A wallcovering, timber panelling or acoustic finish chosen for its look still has to meet the class.

Upholstered furniture for private use in a dwelling must meet the Furniture and Furnishings (Fire) (Safety) Regulations 1988 and carry a permanent label, and nobody may supply furniture that does not comply. The 2025 amendments removed display labels and gave enforcers 12 months to prosecute (GOV.UK, 2025 amendment guidance). Hotels, offices and restaurants fall under the Fire Safety Order, where the responsible person’s risk assessment governs (Fire Safety Order 2005, article 9).

Some PI policies now restrict or exclude fire safety claims, often by endorsement. We check what yours says, and ask how you record classifications and test evidence in your schedules.

Procurement: do you specify, order as agent, or buy and resell?

These can be three different legal positions. If you only specify, the client buys from the supplier and you answer for the specification. If you order as the client’s named agent, the contract is usually still the client’s. If you buy and resell, you are the seller, with a seller’s liability for quality and fitness (Consumer Rights Act 2015, sections 9 to 11).

In Alebrahim v BM Design London the court worked through an interior designer’s estimates, orders and percentage fee item by item, and its written terms decided what it owed. We ask the annual value of goods you handle, whose name is on the orders, how deposits and client money are held, and how trade discounts are treated. The SBID Code allows profits from third parties only with the client’s prior agreement (SBID, Code of Conduct).

Managing the works: are you designing, supervising or contracting?

Visiting site to check design intent is a design service. Coordinating trades the client employs is project management. Employing the trades yourself and charging the client for the works is contracting, and many design wordings exclude it.

The RIBA/BIID Domestic contract for interior design services covers minor building interior decoration work, and lets the designer act as principal designer or principal contractor under CDM, which shows how far a studio’s role can stretch (BIID, RIBA/BIID contracts). In Lejonvarn v Burgess a designer who project managed for friends without a fee still owed a duty of care.

We ask who contracts with each trade, who approves payment, how often you inspect, and what your appointment says about workmanship.

Structure, consents and hidden hazards: where does your scope stop?

Open plan layouts, new openings, heavy stone and wet rooms all touch structure, fire safety or services. The BIID Code expects members to advise clients when to bring in other specialists, such as architects, structural engineers and party wall surveyors, and to see that approvals are obtained in writing before work starts on site (BIID, Code of Conduct).

Altering a listed building in a way that affects its character without consent is a criminal offence (Listed Buildings Act 1990, section 9). HSE guidance calls for a survey to find asbestos hidden in the building fabric before refurbishment work starts (HSE, asbestos surveys), and PI cover for asbestos claims is often limited to a lower figure.

We ask how your drawings and appointment mark the boundary, and who you rely on for structural and fire advice.

CDM 2015: designer, principal designer and domestic clients

Every interior designer is a designer under CDM 2015, and fitting out and renovation are construction work. Where more than one contractor will work on a project, the client must appoint a principal designer in writing (CDM 2015, regulation 5).

On domestic projects the client’s duties pass to the contractor or principal contractor, or to the principal designer where that is agreed in writing (HSE, domestic clients). The BIID Code requires members to confirm in writing whether or not they will act as principal designer.

We ask how often you take the role, what training supports it, and whether your policy’s business description includes it.

Budgets and cost advice: who owns the number?

Clients remember the first figure they were given. In Riva Properties v Foster + Partners the court held that a designer must find out whether there is a budget and take it into account. In Freeborn v Marcal the failure to record the brief in writing was itself a breach of duty.

Policies usually insure negligent cost advice, but not a promise that a project will cost a stated sum, and not the return of your fees. We ask whether you give cost estimates or leave them to a quantity surveyor, how allowances for furnishings, fees and VAT are shown, and how budget changes are recorded. The BIID Code expects clients to be told without undue delay of anything that could affect budget, timeline or quality.

Overseas clients and projects

We look at four things: where the project is, where the client is based, which country’s law governs the appointment, and where a claim could be brought. A policy’s geographical limits deal with where the work is carried out. Its jurisdiction clause deals with whose courts and law it will answer to. They are separate, and a project can satisfy one and fail the other.

Designing from London for a house abroad is not the same risk as running site visits and procurement there. Local licensing, product standards and consumer law may apply. Tell us before you sign, so the territory can be agreed with insurers first, and keep English law and courts in your appointment where the client will accept them.

Your presentation

A proposal should explain the work behind the numbers

An unexplained label can make a modest exposure look broader than it is, while a vague one can hide an important responsibility. Here is how we turn brief answers into a picture insurers can underwrite properly.

Brief proposal answers and what we send instead
What insurers often seeWhat we send instead
“Interior design, 100%.”The split between design only, FF&E specification, procurement in your own name, project management and any contracting, with residential and commercial shares.
“We don’t supply goods.”Whether you buy and resell, order as the client’s agent or only specify, with the annual value of goods handled.
“No structural work.”How your drawings and appointment record where your layouts stop and the engineer, architect or contractor takes over.
“We are not principal designer.”How each appointment records the CDM and Building Regulations roles, and what you do when a domestic client appoints nobody.
“Largest contract £60,000.”Your fee and the value of the works and furnishings your scheme directed, since a claim follows the project value.
“Some overseas work.”The countries, where each client is based, the governing law and courts in each appointment, and whether you visit site.

Illustrations of common answers, not statements about particular clients.

How we handle your renewal

  1. You send what you haveSchedule, wording, endorsements, last proposal and your renewal date.
  2. We find what needs explainingProcurement in your own name, dutyholder roles, fire sensitive finishes, overseas projects, contracting for works and past disputes.
  3. We approach suited insurersFrom more than 30 insurers, specialist agencies and Lloyd’s, chosen for the work you do.
  4. We compare the wordingsCover, clauses, excess and limits side by side, with the differences explained.

Practice changes

When your practice changes, the insurance needs reviewing

Starting to procure

Buying and reselling furniture or fittings in your own name changes you from designer to seller. Tell us before the first order, with the expected annual value, so the supply exclusion is dealt with first.

Taking on the works

Employing trades and charging for the build is contracting. Many design wordings exclude it, so the cover needs agreeing before you sign the first works contract.

Incorporating the studio

Moving from sole trader to a limited company or LLP creates a new insured. Make sure the earlier practice’s work stays covered and the retroactive date carries across unchanged.

First commercial project

A hotel, restaurant or office brings fire classifications, adjudication, collateral warranties and larger losses. Review the limit and send us the appointment before you accept it.

Freelancers and sub-consultants

Check whether each person works under your direction or as an independent consultant, whether they carry their own PI, and that their terms do not limit your right to recover from them.

Retirement or closure

Claims can arrive years after the last project. Run off cover keeps a policy in place to receive them. Plan it before you stop, not after.

Run off cover explained

How long should run off last when a studio closes?

Longer than most designers expect. A claim in contract can be brought for six years, or twelve where the appointment or a warranty was signed as a deed. Negligence claims have a 15 year long stop (Limitation Act 1980, section 14B), and Defective Premises Act claims for work on dwellings can be brought for 15 years (Building Safety Act 2022, section 135). ARB expects registered architects to keep at least six years of run off (ARB, PII guidance). BIID and SBID set no period. Run off cover explained

Alongside your PI

Public and products liability, and goods in transit cover, to consider alongside your PI

PI answers claims about your professional work. It is not built for an injury on a site visit, a client’s property damaged on install day, or a bespoke piece broken on the road. Designers who visit homes, handle clients’ possessions and move valuable goods are exposed to all three, so we recommend considering these covers alongside PI.

Which policy responds?

Tap a situation for the explanation. A general guide only: the answer always depends on the actual wordings.

SituationPIPublic and productsGoods in transit
A wrong fabric specification means forty hotel chairs must be recoveredBuilt for itNot built for itNot built for it

A specification error that causes financial loss is what PI is for. Public and products liability policies respond to injury and property damage, not to the cost of putting right your own design.

A dining chair you sold under your own invoice collapses and injures a guestNot built for itBuilt for itNot built for it

Injury caused by goods you supplied is a products liability claim. PI wordings usually exclude the sale or supply of goods. If you imported the chair or put your own name on it, the law can treat you as its producer.

Your team scratches a client’s floor and breaks a lamp while styling the houseNot built for itBuilt for itNot built for it

Accidental damage to a client’s property during a visit is a public liability matter, not a professional error. Check how the policy treats property in your custody or being worked on, which is often restricted.

A bespoke marble table is smashed between the workshop and the client’s homeNot built for itNot built for itBuilt for it

If you bought the table to resell, the loss is usually yours until the client has it. Goods in transit cover is built for this. Check the limit for any one item and whether storage and installation are included.

A shelf you detailed pulls out of the wall and injures someoneBuilt for itMay respondNot built for it

Injury caused by negligent design or specification is usually written back into PI. If you also supplied or installed the shelf, public and products liability may respond instead. The two need reading together.

Built for itMay respondNot built for it

Public and products liability explained

Public liability covers your legal liability for injury to people and damage to their property arising from your business activities: a visitor hurt at your studio, or a client’s belongings damaged on a site visit. Products liability covers injury or damage caused by goods you have sold or supplied.

  • Who counts as producer. Under the Consumer Protection Act 1987 the producer, anyone who puts their own name on a product and anyone who imports it into the UK are liable for damage caused by a defect (section 2).
  • Membership. BIID requires Registered Interior Designers to hold public liability as well as PI.
  • What to check. Property in your custody, work done by sub-contractors, and whether supply and installation are described.

The other covers we arrange

Goods in transit and stock explained

If you buy furniture, lighting, art or fabric and resell it, the goods are usually at your risk until the client has them. In a consumer sale they stay at the trader’s risk until they come into the consumer’s physical possession (Consumer Rights Act 2015, section 29).

  • In transit. Loss or damage while goods travel between workshop, warehouse and site, in your own vehicle or a carrier’s.
  • In storage. Pieces held for months while a project runs late, often at a third party warehouse.
  • What to check. The limit for any one item, cover during installation, goods sent from abroad, and what the carrier’s own terms would pay, which can be far less than a bespoke piece is worth.

The other covers we arrange

Proposal form

Prefer to fill in a form?

Ask us for the appropriate proposal form, or send us your details when you request a quote.

Beyond the policy

Claims support and contract reviews

If you receive a complaint or become aware of something that could lead to a claim, email [email protected], or call 0333 222 4257 if it is urgent or sensitive. We report the matter, follow up with the insurer and explain updates. If a deadline is near, follow the notification instructions in your policy immediately. Do not admit liability before speaking to us.

Before you sign, send us the appointment and schedule of services, any collateral warranty, and any terms that make you principal designer, principal contractor or the seller of goods, with a short description of the project. Highlight the wording that concerns you. We can flag insurance points to discuss with you and, where needed, your insurer. Your solicitor can advise on the legal effect. A review cannot guarantee cover for a claim.

Claims support  ·  Contract reviews

Review your cover

Let a specialist read your PI cover

Send us your current schedules, wordings, endorsements and renewal information. Tell us what you design, what you procure, which dutyholder roles you take and where your projects are. We will tell you where the cover fits your practice, where it does not, and what we would change.

Speak to a PI specialistSend us your renewalGet a quote

  • Your schedule, policy wording and endorsements
  • Renewal date and your last proposal form
  • Your split of design, procurement and project management
  • Your standard appointment and terms of business
  • Any principal designer, commercial or overseas projects
  • Complaints, fee disputes and anything that needs explaining