Home / Who we cover / Quantity surveyors and cost consultants

Quantity surveyors and cost consultants

Professional indemnity for quantity surveyors and cost consultants

Professional indemnity for quantity surveyors and cost consultants, read clause by clause. We know where QS claims start: the cost plan a funder relied on, the valuation, the late pay less notice, the employer’s agent role, and what RICS requires of your policy.

Speak to a PI specialistSend us your renewal for reviewGet a quote

  • Since 1990Specialist PI brokers
  • 30+ insurersPlus specialist agencies and Lloyd’s
  • 4.9 out of 5From 228 Google reviews
  • FCA authorisedFRN 302911, independently owned

Your map

The quantity surveyors map: from your work to the policy and beyond

Your practice’s work on one side, the policy on the other. Select a point to see what it connects to, then follow the link to the part of this page that explains it.

Still 3D render (motion off)

The map, area by area

Each heading below is one area of the map, and the number shows how many points it holds. Open a heading and tap any point: it lights up on the map with everything it connects to, and a short note explains why.

Practice and business risks 11

Your terms and framework agreements 8

Appointments and contracts 6

Legislation 3

Policy documents and schedule 10

Main policy wording 8

Exclusions and restrictions 3

Succession, closure and earlier work 4

Other insurance and final assessment 8

Our experience

Why quantity surveyors come to a specialist

Two practices with the same fee income can carry very different risk. Cost planning, bills of quantities, valuations and final accounts are one thing. Employer’s agent and contract administration roles, lender monitoring, reinstatement cost assessments, claims work and expert evidence each add duties to different people, and each changes what the policy must do.

Hammond PI has specialised in professional indemnity since 1990. We read the wording itself: how it defines your professional business, treats adjudication, fire safety, collateral warranties and contractual liability, groups related claims, and meets the RICS minimum terms where you are regulated. Then we present your practice so insurers underwrite the work you really do, role by role and project by project.

When a problem arises we stay involved. We put the matter to insurers, watch the adjudication and notification deadlines with you, gather what the claims handler needs and follow it through.

  1. The workCost plans, valuations, final accounts, employer’s agent, monitoring and claims work, in their real proportions
  2. What can go wrongAn estimate relied on for funding, an overvaluation, a late notice, a contractor insolvency
  3. What the policy must answerInsuring clause, adjudication terms, fire safety, warranties, aggregation, excess, past work and RICS minimum terms
  4. How we present itA clear submission by role and project type, questions answered, wordings compared across insurers

Who requires PI

Check the minimum RICS requires, and what others ask for

RICS sets the only fixed scale. Enter your turnover for the preceding year to see the minimum limit and the excess rule. CICES and CIOB take a different approach, and in practice your appointments and collateral warranties often ask for far more.

Enter your turnover in the preceding year for the last complete year to see the minimum cover, the excess rule and what applies when you stop, with a link to the rule itself.

A minimum is not a recommendation. Many practices need more, and cover for each and every claim can protect better than an aggregate limit.

Whose rules

See the rules below.

The rules side by side
PI requirements: Who requires PI
WhoMinimum coverExcessAfter you stopOther conditions
Royal Institution of Chartered Surveyors (regulated firms)Turnover in the preceding year of £100,000 or less: £250,000. £100,001 to £200,000: £500,000. £200,001 and above: £1,000,000. A new firm uses its estimated turnover. Basis: any one claim, or aggregate with unlimited round the clock reinstatement. Asbestos, pollution and fire safety cover can be in the aggregate.Limit of £10,000,000 or less: no more than the greater of 2.5% of the sum insured or £10,000, each and every claim. Above £10,000,000: no set limit.Fully retroactive run off when the firm stops. Consumer claims: £1,000,000 in all for six years, at no additional premium. Other claims: adequate and appropriate cover, expected for at least six years.A RICS listed insurer, rated at least B+ by AM Best or BBB by Standard and Poor’s. The RICS minimum policy wording or wider, on a full civil liability basis. Defence costs in addition to the limit, except for asbestos, pollution and fire safety. Fully retroactive, except that fire safety cover for buildings of five storeys and above may carry a retroactive date of 1 July 2024 or later.
Chartered Institution of Civil Engineering SurveyorsNo fixed scale. The Rules of Professional Conduct require a member to hold professional indemnity insurance if the contract requires it, to cover the assessed level of liability.Not specifiedNot specifiedNo listed insurers or minimum wording. Members must agree terms of engagement in writing, so the contract sets the cover you must hold.
Chartered Institute of Building (Chartered Building Consultancy scheme)No fixed minimum. A consultancy applying to the scheme must send its relevant insurance certificates, and the rules give professional indemnity as an example.Not specifiedNot specifiedNo listed insurers or minimum wording in the scheme rules.

Sources: RICS (PII requirements Version 11, with effect from 1 July 2025), CICES (Regulations as revised 12 March 2026), CIOB (Scheme rules, first revision 1 April 2020). Practices answering to more than one must meet each set of rules.

Why the minimum is rarely the right limit

The RICS scale stops at £1 million for any practice with turnover above £200,000. A cost plan can sit behind a funding decision of many millions, one rate error can repeat through every certificate on a project, and appointments and warranties often require a stated limit for six or twelve years. Set the limit by your largest project and the roles you hold, then check whether fire safety cover is in the aggregate with costs inside it.

Claim scenarios

When a claim arrives: how we would handle it

Situations quantity surveyors face, the risk hidden in each, and the strategy we would follow from the first letter. Choose a scenario.

A pay less notice goes out late and the employer must pay in full

The situationYou are contract administrator on a £6 million scheme. The contractor applies for £480,000. Your valuation is £310,000, but the pay less notice is issued a day after the contract deadline. The contractor starts an adjudication for the full sum, and the employer’s solicitors write that you will be responsible for whatever it has to pay.

The riskTreating it as the employer’s dispute, not yours. The employer’s letter is already a claim or a circumstance. Many wordings also need notice of an adjudication within two working days. Admitting the notice was late, or offering to waive fees, can prejudice cover.

Our strategy

  1. Notify insurers the same day, enclosing the employer’s letter, the adjudication notice, your appointment and the payment timetable, so the claim and the adjudication are both reported in time.
  2. Make no admission to the employer. Explain that insurers must agree any statement about the notice, and keep helping with the facts of the valuation.
  3. Separate two losses: the overpayment, which the employer may recover in a true value adjudication once it has paid the notified sum, and the loss the late notice really caused, such as costs and interest.
  4. Ask insurers to agree, where the wording allows, that supporting the employer’s true value adjudication is mitigation, because recovering the overpayment early costs far less than defending a claim later.
  5. Check the contractor’s solvency at once. If it may fail, the recovery route can close, and insurers need to know the claim could be for the full difference.

What we aim forCover intact, the overpayment recovered from the contractor where possible, and any claim against the practice limited to the loss the late notice really caused.

The lessonA late notice is a circumstance on day one. Notify before you explain.

Tenders return 30% over your cost plan and the funder withdraws

The situationYour stage 3 cost plan of £8.2 million supported a developer’s funding. Tenders come back near £10.7 million. The lender withdraws, the scheme stalls, and the developer’s solicitors claim wasted professional fees, finance costs and lost profit, saying the estimate was negligent.

The riskArguing about the market before anyone reads the file. The real questions are what the estimate said about its basis, exclusions, inflation and risk allowances, who was entitled to rely on it, and whether the lender holds a reliance letter or warranty that insurers never saw.

Our strategy

  1. Notify insurers at the first letter, with the appointment, each issue of the cost plan and the basis, assumptions and exclusions stated in it.
  2. Establish who can claim: the developer under the appointment, and the lender only if a reliance letter, warranty or direct assurance was given.
  3. Have panel solicitors test the scope of duty first: was the plan a prediction at a stated design stage with stated allowances, and what was the client told about tender price risk?
  4. Then reconcile estimate to tender line by line, separating later design changes, client additions and market movement from any measurement or rate error.
  5. Check the appointment for a liability cap or net contribution clause, and that nothing agreed since has given it up.

What we aim forA defence built on the documents, with the claim confined to any loss a real error caused, not the whole gap between estimate and tender.

The lessonState the basis, exclusions and risk allowances on every estimate. That page becomes your defence.

As project monitor you recommend drawdowns and the borrower fails

The situationYou monitor a residential scheme for a bank. Your reports recommend twelve drawdowns. The borrower fails with the building half finished, and the bank says your reports overstated progress and passed costs outside the facility. It claims the shortfall on its loan.

The riskAnswering the bank with a line by line rebuttal. The bank is your client and its letter is a claim. Some of the facts cut both ways: what the facility agreement allowed, what the bank itself knew, and what your appointment said you would check.

Our strategy

  1. Notify insurers immediately and send the appointment, the facility terms you were given, every report and the site visit records.
  2. Pin down scope: what the appointment required you to check and report, and what was expressly left to the bank or its valuer.
  3. Ask panel solicitors to examine the bank’s own conduct. In Lloyds Bank v McBains Cooper the Court of Appeal placed two thirds of the responsibility on the bank.
  4. Separate sums wrongly recommended from the loss the bank would have suffered anyway when the borrower failed.
  5. Read the series of claims wording to see whether the excess applies once or to each report.

What we aim forThe claim limited to drawdowns that should not have been recommended, with the bank’s own share of responsibility argued from the start.

The lessonIn monitoring work the appointment and the facility letter decide the claim. Keep both on file.

Practical completion certified with fire stopping defects still hidden

The situationAs employer’s agent on a six storey residential block you issued the practical completion statement. Two years later the housing association finds missing cavity barriers and fire stopping. It claims the remedial cost from the contractor, and from you for certifying completion and releasing retention.

The riskAssuming the main limit applies. Many wordings give fire safety cover in the aggregate with defence costs inside it. For buildings of five storeys or more it may also be limited to negligence and to work done after a retroactive date. Earlier notifications may have used the aggregate already.

Our strategy

  1. Read the fire safety clause and schedule first: the limit, whether it is aggregate, the retroactive date and what has already been notified against it.
  2. Notify the whole matter, naming the building, the contract, the certificate and every party who has written, so that later claims attach to this policy year.
  3. Gather the appointment and the employer’s requirements to show what inspection duty you took on, and who was responsible for inspecting the works.
  4. Ask insurers to protect contribution rights against the contractor and its designers, and check that no warranty or settlement has given them up.
  5. Plan defence spending with insurers early, because costs inside an aggregate limit reduce what is left to pay the claim.

What we aim forThe right section of the policy engaged, defence costs managed within the limit, and responsibility shared with those who built and inspected the work.

The lessonOn taller residential buildings, read the fire safety clause before you read the limit.

The contractor fails and the employer finds it has been overpaid

The situationThe main contractor enters administration at month ten. The completion contractor’s survey values the work done at £350,000 less than your certified total, and materials off site that were paid for cannot be found. The employer looks to you for the difference.

The riskOffering to rework the valuations yourself to prove the figures. A valuation is about quantity, and quality is usually for the architect or contract administrator, but that depends on your appointment. New figures produced without insurers can become the claimant’s best evidence.

Our strategy

  1. Notify insurers when the contractor fails and the employer first questions the valuations, before any demand arrives.
  2. Assemble each valuation with its build up, site notes, photographs, the vesting certificates for off site materials and any defects the architect reported.
  3. Establish the role: under the appointment, who certified, who inspected quality and who was to check title to off site materials?
  4. Separate any overvaluation from defects found later, the completion contractor’s premium and delay, none of which is the valuer’s loss.
  5. Check whether the performance bond and retention have been called on, since both reduce the employer’s loss.

What we aim forThe claim narrowed to any real overvaluation, with bond and retention credited and the limits of the valuer’s role established early.

The lessonValuation files are read hardest after an insolvency. Record what you saw on site each month.

Your quantum evidence is rejected and the client blames you

The situationYou gave quantum expert evidence for a subcontractor in a final account dispute. At the joint meeting you conceded several heads, the tribunal preferred the other side’s figures, and the client recovered far less than expected. Its new solicitors allege you were unprepared and negligent.

The riskAssuming an expert cannot be sued. The Supreme Court removed that immunity in Jones v Kaney. The second trap is the policy: expert witness and claims work must fall within the professional business you declared, with its fee income disclosed.

Our strategy

  1. Notify insurers and say nothing to the former client beyond acknowledging the letter.
  2. Confirm from the proposal that expert and dispute work was declared, with its fee income, so the business description cannot be challenged.
  3. Gather the instructions, reports, joint statement and the advice you gave before conceding, to show the concessions followed your duty to the tribunal.
  4. Have panel solicitors test causation: what would the tribunal have awarded on that evidence, whoever the expert was?

What we aim forA funded defence, the business description beyond argument, and the claim tested against what the evidence could ever have achieved.

The lessonDeclare dispute and expert work on every proposal, however small the fees.

A funder’s warranty adds fitness for purpose and unlimited assignment

The situationA week before financial close you are sent a collateral warranty in the funder’s own form. It warrants that the project will meet the employer’s requirements, allows assignment without limit, has no net contribution clause and requires £5 million of cover for each and every claim for twelve years.

The riskSigning to keep the deal moving. Many wordings exclude liability taken on by contract beyond the ordinary duty of skill and care, such as fitness for purpose and guarantees, and restrict warranties that can be assigned repeatedly. You could carry that part uninsured for twelve years.

Our strategy

  1. Send us the draft before signature. We compare each obligation with the contractual liability and warranty clauses of your wording.
  2. Mark up what insurers will not cover: replace fitness for purpose with reasonable skill and care, and limit assignment to the number your policy allows.
  3. Restore a net contribution clause and a cap consistent with the appointment, so the warranty gives the funder no more than your client has.
  4. Change the insurance promise to cover maintained while available at commercially reasonable rates, and reflect any aggregate limits for fire safety, asbestos and pollution.
  5. If the funder will not move, ask insurers to approve the terms in writing before you sign.

What we aim forA warranty that matches the policy, or insurers’ written approval of the difference, before the practice is committed.

The lessonA warranty outlives the project. Have it read against your wording before you sign.

Illustrative scenarios. How any real claim is handled depends on the facts, the policy wording and insurers’ agreement.

Four things quantity surveyors should know about PI

The date of the work and the date of the claim are different

A claim today may concern a cost plan or valuation issued several years ago. PI is written on a claims made basis: the policy in force when the claim is made responds, provided the work falls after the retroactive date and nothing was already notified under an earlier policy.

Claims made cover: the policy in force when the claim is made is the one that responds.

A valid notification of circumstances can connect a later claim to an earlier policy. That is why continuity matters when you change insurers or stop a particular service. How claims made cover works

An adjudication notice starts a two working day clock

A construction dispute can be referred to adjudication at any time, and the adjudicator must decide within 28 days of referral unless the period is extended (Construction Act 1996, section 108). PI wordings follow that speed. The RICS minimum wording makes it a condition of cover that you tell insurers within two working days of receiving a notice of adjudication, and that you do not start one yourself without their consent where it could lead to a claim (RICS minimum policy wording). It also excludes adjudications run to a timetable more onerous than the statutory Scheme. Tell us the day a notice arrives.

A missed payment notice turns your valuation into a debt

The Construction Act requires the contract to provide for a payment notice, usually from the payer or a specified person such as the contract administrator, not later than five days after the payment due date. To pay less than the notified sum the employer needs a pay less notice in time. Without one, the notified sum must be paid by the final date (sections 110A to 111). In S&T v Grove the Court of Appeal confirmed the employer can still adjudicate the true value, but only after paying ([2018] EWCA Civ 2448). If the contractor has failed by then, the employer may look to whoever missed the notice.

How your limit of indemnity works

Two unrelated covered claims of £750,000 each come to £1.5 million. Under a £1 million limit in the aggregate, the policy pays up to £1 million for the year in total. Under a £1 million limit for each and every claim, each claim has its own £1 million, subject to the policy’s aggregation wording and other terms.

The same two claims under an aggregate limit and an each and every claim limit.

Then check whether defence costs are paid in addition to the limit or use it up, and when the excess applies.

Inside the wording

Twelve clauses that decide quantity surveyors’ claims

Two policies with the same limit can answer the same claim very differently. These are the clauses we read first, what each means for a quantity surveyor and what we check.

Insuring clause and “professional business”

What it doesMost surveyors’ wordings cover civil liability arising from the conduct of your professional business, as the policy defines it or as you declared it.

For a quantity surveyorProject monitoring, employer’s agent roles, principal designer duties, claims consultancy and expert or adjudicator appointments may fall outside the definition unless they are recognised services of the profession or were declared to insurers.

What we checkThe business description against every service and role in your fee split, including appointments held personally.

Adjudication

What it doesCovers liability from an adjudicator’s decision, usually only if insurers are told within two working days of a notice and the adjudicator is independent.

For a quantity surveyorDisputes under your own appointment can be adjudicated. A timetable in that appointment tighter than the statutory Scheme can take the adjudication outside cover altogether.

What we checkThe notice period, whether it is a condition precedent, and the adjudication clause in each appointment you sign.

Fire safety

What it doesMany wordings give fire safety cover as a separate section: often in the aggregate, with defence costs inside the limit, and for taller buildings a negligence trigger and its own retroactive date.

For a quantity surveyorEmployer’s agent, contract administration and cost roles on residential blocks and cladding remediation can all fall into it, even though you designed nothing.

What we checkThe limit, the storey or height threshold, the retroactive date and how much of the aggregate earlier notifications have used.

Contractual liability

What it doesExcludes liability you take on by contract beyond the ordinary duty of skill and care: fitness for purpose, guarantees, penalties and liquidated damages, unless insurers approved the terms.

For a quantity surveyorBespoke appointments and employer’s agent agreements sometimes promise that a budget or programme will be met. That promise can be uninsured even where the advice was careful.

What we checkEach appointment for absolute obligations, indemnities and uncapped liability before you sign.

Collateral warranties and assignment

What it doesWarranties are usually covered if they give no more than your client has, with limits on how many times they can be assigned.

For a quantity surveyorThe RICS minimum wording allows one assignment, or two for a funder, unless insurers approve the terms or a standard industry form is used. Funders’ own forms often ask for more.

What we checkAssignment, step in rights, net contribution and the insurance promise in every warranty and third party rights schedule.

Series of claims

What it doesClaims arising from the same originating cause are treated as one claim, with one limit and one excess.

For a quantity surveyorA rate or measurement error repeated through twelve valuations, or one cost model used on several projects, could be one claim or many. One limit may then have to pay for all of it.

What we checkThe aggregation words, read with whether your limit is any one claim or aggregate.

Notification of claims and circumstances

What it doesCover is triggered by a claim first made, or a circumstance first notified, in the policy period, with full particulars.

For a quantity surveyorA contractor insolvency, tenders far above the cost plan, an employer querying a certificate or a late notice can each be a circumstance, long before any letter of claim.

What we checkWhat counts as a circumstance, the deadline after expiry and the effect of late notice.

Defence costs

What it doesUsually paid in addition to the limit, but shared in proportion if a settlement exceeds the limit. Some sections include costs within the limit.

For a quantity surveyorFinal account and delay disputes are document heavy and costly to defend. Costs inside an aggregate limit, as with fire safety, reduce what is left for the claim.

What we checkCosts in addition or inclusive for each section, and whether the excess applies to costs.

Fees

What it doesMany wordings exclude claims for the return or reduction of fees, and allegations of overcharging.

For a quantity surveyorA client who withholds fees often answers your invoice with a counterclaim for negligent cost advice. The counterclaim is a PI matter. Recovering the fee is not.

What we checkHow fee disputes, set off and counterclaims are treated, and when a fee dispute should be notified.

Rights of recovery

What it doesInsurers take over your rights against others, and some wordings exclude claims where you have contracted those rights away.

For a quantity surveyorSub-consultant agreements, joint appointments and settlements with contractors can waive or cap your right to a contribution.

What we checkWaivers and caps in sub-consultant terms, and that specialists you subcontract to carry their own cover.

Non-disclosure

What it doesUnder the RICS minimum wording insurers may avoid the policy only where they establish an intention to mislead. Otherwise their remedies are limited.

For a quantity surveyorWordings outside the RICS regime can apply the Insurance Act remedies in full, so an innocent mistake about your work split may reduce a claim.

What we checkWhich version you have, and that the proposal describes roles, project types and contract values accurately.

Retroactive date and run off

What it doesPast work is covered back to the retroactive date. When a practice stops, run off cover keeps a policy in place for later claims.

For a quantity surveyorClaims on appointments signed as deeds can arrive up to twelve years after a breach. The RICS minimum wording includes six years of run off for consumer claims only.

What we checkThe retroactive date for each section, and a run off plan that matches the length of your warranties.

The clause guide: how each part of a PI policy works

Certifier duties

Payment notices, certificates and how long you stay liable

Payment and adjudication

  • Payment notices. A construction contract must provide for a payment notice not later than five days after the payment due date, stating the sum considered due and how it is calculated (Construction Act 1996, sections 110A and 110B).
  • Pay less notices. To pay less than the notified sum, a pay less notice must be given before the final date for payment. Where the contract is silent, the Scheme sets seven days before that date (Scheme for Construction Contracts, Part II).
  • Pay first, argue later. Without a valid notice the notified sum must be paid. The employer can then adjudicate the true value, but only after paying (S&T v Grove). The risk in between sits with whoever administers the notices.
  • Adjudication. A party may refer a dispute at any time and the adjudicator must decide within 28 days of referral unless extended (section 108). An agreement to do surveying work for construction operations is itself a construction contract (section 104).

Duties and time limits

  • Certifying fairly. A certifier is engaged by the employer but, when making decisions, must act independently, impartially, fairly and honestly, holding the balance between employer and contractor (Scheldebouw v St James Homes).
  • Quantity, not quality. In Dhamija v Sunningdale Joineries the court found no implied duty on a quantity surveyor to inspect for defects when valuing. Responsibility for defects sat with the architect. Your appointment can change that ([2010] EWHC 2396 (TCC)).
  • Six, twelve and fifteen years. Contract claims run for six years, or twelve where the appointment or warranty is a deed. Negligence claims for latent damage have a fifteen year long stop (Limitation Act 1980, section 5, section 8 and section 14B).
  • Thirty years for dwellings. Defective Premises Act claims can run for 30 years for rights arising before 28 June 2022, then 15 (Building Safety Act, section 135). In URS v BDW the Supreme Court applied this to related negligence and contribution claims ([2025] UKSC 21).

Court decisions behind these points

[2010] EWHC 2396 (TCC)

Dhamija v Sunningdale Joineries

A quantity surveyor valuing work owes reasonable skill and care in the valuation, with no implied duty to inspect for defects.

Read the judgment

[2006] EWHC 89 (TCC)

Scheldebouw v St James Homes

A certifier must act independently, impartially, fairly and honestly, even though the employer engages and pays it.

Read the judgment

[2018] EWCA Civ 2448

S&T (UK) v Grove Developments

With no valid payment or pay less notice the notified sum must be paid first. The true value can be adjudicated afterwards.

Read the judgment

[2018] EWCA Civ 452

Lloyds Bank v McBains Cooper Consulting

A project monitor was negligent in recommending payment for works outside the facility, but the bank bore two thirds of the responsibility.

Read the judgment

[2006] EWHC 5 (TCC)

Plymouth & South West Co-operative Society v Architecture, Structure & Management

Consultants providing design and cost services should have advised that the design was too provisional to contract on. They were liable for the overrun.

Read the judgment

[2011] UKSC 13

Jones v Kaney

Expert witnesses have no immunity from a negligence claim by the client who retained them.

Read the judgment

These decisions explain where a professional’s duty lies. They do not decide whether a particular policy responds.

Specialist work

The work that changes your cover

A short label on a proposal form rarely tells insurers what you are responsible for. These are the areas where we ask most, starting with two that are changing now: fire safety cover and AI in measurement and estimating.

Fire safety and building safety: which section of your policy answers?

Fire safety claims are no longer handled like any other claim. Under the RICS requirements, fire safety cover can be written in the aggregate with defence costs inside the limit. Buildings of four storeys and below keep full civil liability cover. For five storeys and above, and for external wall and fire risk assessment work, cover can be limited to negligence and to work done on or after a retroactive date of 1 July 2024 or later (RICS PII requirements and minimum wording).

A quantity surveyor designs nothing, but employer’s agent, contract administration and cost roles on residential blocks and remediation schemes can be drawn in when defects are found. The time limits are long: Defective Premises Act claims on older dwellings can now be brought for up to 30 years (Building Safety Act 2022, section 135).

  • What we ask. Building heights and uses, your role on each, and any cladding or remediation projects.
  • What we check. The fire safety limit, its retroactive date and what has already been notified against the aggregate.
  • What you sign. Appointments and warranties that promise full cover for fire safety you may not have.
AI in measurement and estimating: who checks the output?

Automated take off, benchmarking and drafting tools are now part of cost consultancy. RICS’s professional standard on the responsible use of AI took effect on 9 March 2026 for all members and regulated firms (RICS, Responsible use of artificial intelligence in surveying practice). Where AI has a material impact on the service, the standard requires:

  • Registers. A written register of the AI systems used, and a risk register reviewed at least quarterly.
  • A documented judgement on the reliability of the output, made by or under a named, qualified surveyor who accepts responsibility for its use.
  • Dip sampling at regular intervals where outputs are automated or high volume.
  • Telling the client in writing and in advance, with terms of engagement that state, if available, the extent of professional indemnity cover for the firm’s use of AI.

That last point makes your policy part of your engagement terms. For insurance, what matters is the service, the allegation and the wording: a quantity taken off wrongly is a measurement error whoever, or whatever, measured it. We ask which tools you use, for which services, and how a surveyor checks the result before it reaches the client.

Contract administration: valuations, certificates and payment notices

Many QS claims begin in the payment cycle: an overvaluation discovered when a contractor fails, off site materials paid for without proof of title, or a payment or pay less notice issued late. The dates are set by statute and by the contract, and missing one can leave the employer paying a sum your own valuation did not support (Construction Act 1996, sections 110A to 111).

We ask who issues notices and certificates under each appointment, how the dates are diarised and checked, and who covers when that person is away. RICS publishes practice information on interim valuations and payment, final account procedures and retention (RICS, QS and construction practice guidance).

Employer’s agent on design and build

The employer’s agent acts for the employer under a design and build contract, and the role is whatever the appointment says it is. Some agents only administer the contract. Others review design, inspect the works, certify completion and advise on the employer’s requirements. Insurers see these as very different risks.

We set out which duties you accept, whether you inspect and to what standard, and who carries design review. RICS practice information covers the role and the appointment documents (RICS, Employer’s agent: design and build). Watch for appointments that make you responsible for the contractor’s compliance: a promise of that kind can fall within the contractual liability exclusion.

Project monitoring for lenders and funders

A monitoring surveyor reports to a lender on a project it does not control. Claims follow borrower failures: the lender says drawdowns were recommended against overstated progress, or that costs outside the facility were passed. In Lloyds Bank v McBains Cooper the monitor was liable for sums it should have flagged, with the bank bearing two thirds of the responsibility ([2018] EWCA Civ 452).

We ask how many monitoring appointments you hold, the loan sizes, who your client is, and whether syndicate lenders or buyers of the loan can rely on your reports. RICS practice information describes the role (RICS, Lender’s independent monitoring surveyor). Reliance wording and liability caps matter more here than the fee suggests.

Cost plans and estimates relied on for funding

An estimate becomes a claim when someone commits money on it. RICS’s cost prediction standard sets mandatory requirements for members producing a cost prediction report (RICS, Cost prediction), and NRM 1 gives the order of cost estimating and cost planning (RICS, New Rules of Measurement). Following them, and saying so, is useful evidence.

We ask who relies on your estimates: the client alone, or funders, grant bodies and investors. We ask how you state the design stage, base date, exclusions, inflation and risk allowances, and whether your terms limit reliance to the named client and cap liability, as RICS recommends (RICS, Risk, liability and insurance). In Plymouth & South West Co-operative Society v ASM consultants were liable for an overrun after failing to advise that the design was too provisional to contract on ([2006] EWHC 5 (TCC)).

Reinstatement cost assessments for insurance

A reinstatement cost assessment sets the sum insured for a building. If the figure is too low, the owner may find a property claim reduced for under insurance and look to the surveyor for the shortfall. The fee is small and the building may be worth many millions, so the limit, any liability cap and the stated basis of the assessment all matter.

We ask how many assessments you issue, whether they are desktop or inspected, who signs them, how listed or unusual buildings are handled, and how long clients are told the figure can be relied on. Tell us if this work has grown. Insurers treat a practice issuing assessments in volume differently from one doing a few for existing clients.

Claims consultancy, adjudication support and expert evidence

Preparing and defending loss and expense claims, drafting adjudication submissions, sitting as adjudicator and giving expert evidence are different services from cost management. Each needs to be within the business description on your policy, with its fee income declared.

Expert witnesses can be sued by the client who retained them since Jones v Kaney ([2011] UKSC 13). Claims work also brings deadline risk: an adjudicator must decide within 28 days of referral unless the period is extended, so a submission served late may not be repaired. We ask about your team’s qualifications, your terms of engagement for dispute work, and whether you ever act for a success fee, which insurers will want to know.

Procurement and contract advice

Advice on procurement route, tender lists, contract choice and amendments is advice like any other. Claims can follow where a two stage tender lets the price drift, a contract is let on incomplete design, a contractor’s financial standing was not checked, or amendments leave the employer without a remedy it expected.

For public bodies the Procurement Act 2023 came into force on 24 February 2025 (GOV.UK, Transforming public procurement), and a challenge by a losing bidder may be followed by a claim against the adviser who ran the tender. We ask what share of your work is procurement advice, for which sectors, and whether you draft contract amendments yourself or leave them to the client’s solicitors.

Your presentation

A proposal should explain the work behind the numbers

An unexplained label can make a modest exposure look broader than it is, while a vague one can hide an important responsibility. Here is how we turn brief answers into a picture insurers can underwrite properly.

Brief proposal answers and what we send instead
What insurers often seeWhat we send instead
“100% quantity surveying.”The split between cost planning, measurement, contract administration, employer’s agent, monitoring, assessments and dispute work, with the fee income for each.
“Employer’s agent on a few schemes.”Each scheme, its contract value and building height, the duties in your appointment and whether you inspect or certify.
“No design work.”What you do take on: employer’s requirements, specification drafting, value engineering advice and any principal designer or similar role.
“Some work for banks.”The number of monitoring appointments, the loan sizes, who can rely on your reports and the caps in your terms.
“Largest contract £20 million.”Your five largest projects with role, fee, contract form, value and sector, and whether each appointment is a deed.
“No claims.”Circumstances as well as claims: contractor insolvencies, disputed certificates, fee disputes and adjudications, with the status of each.

Illustrations of common answers, not statements about particular clients.

How we handle your renewal

  1. You send what you haveSchedule, wording, endorsements, last proposal and your renewal date.
  2. We find what needs explainingWork split by role, project types and heights, largest contracts, warranties signed, monitoring and dispute work, past matters.
  3. We approach suited insurersFrom more than 30 insurers, specialist agencies and Lloyd’s, chosen for the work you do.
  4. We compare the wordingsCover, clauses, excess and limits side by side, with the differences explained.

Practice changes

When your practice changes, the insurance needs reviewing

A partner leaving

The practice’s policy should still cover a former partner for past work. A leaver setting up alone needs their own cover from day one, and personal appointments such as expert or adjudicator roles need a home.

A new entity

Make sure the old firm’s work stays covered, as a predecessor on the new policy or by run off, and that appointments and warranties are properly transferred or left with an insured entity.

Buying or merging practices

Decide whether the successor’s policy takes on the acquired practice’s past work or it buys run off. Ask what has been notified, and read its largest appointments and warranties first.

Taking on new roles

Tell us before you accept your first employer’s agent, project monitoring, principal designer or expert appointment. A new service outside the declared business may not be covered until insurers agree it.

Changing insurer

Notify every known circumstance to the outgoing insurer first, disclose it to the new one, and check the retroactive dates carry across, including any separate date for fire safety cover.

Retirement or closure

RICS requires fully retroactive run off. The minimum wording gives six years for consumer claims only, so run off for commercial clients must be arranged, and warranties signed as deeds can run for twelve years.

Run off cover explained

What if we cannot get renewal terms?

Talk to us early, well before expiry. A RICS regulated firm that has been declined cover can apply to the Assigned Risks Pool, a facility for firms unable to obtain PII that meets the RICS requirements. RICS recommends an approach 14 days before the policy expires and would normally expect ten insurers to have been approached. A firm must have been regulated by RICS for at least 12 months, and RICS says failing to explore the pool will put a firm in breach of its Rules of Conduct (RICS, Assigned Risks Pool).

Alongside your PI

Cyber and public liability cover to consider alongside your PI

PI answers claims about your professional work. It is not built to restore your systems after an attack, and it usually excludes injury and damage that do not come from your advice. Quantity surveyors handle payment certificates and tender data and visit live sites, so we recommend considering cyber and public liability cover alongside it.

Which policy responds?

Tap a situation for the explanation. A general guide only: the answer always depends on the actual wordings.

SituationPICyberPublic liability
Ransomware locks your cost data and project filesNot built for itBuilt for itNot built for it

Incident response, forensic help, data restoration and lost income are cyber covers. PI wordings commonly exclude loss directly caused by a cyber act on your own systems, and PI does not pay to get you working again.

A fraudster in your mailbox sends the employer a false certificate with new bank detailsMay respondBuilt for itNot built for it

The employer may claim against you for its loss. Whether PI responds depends on the cyber exclusion in the wording. Cyber cover provides the investigation and response. The two wordings have to be read together.

A personal data breach has to be reportedNot built for itBuilt for itNot built for it

Cyber cover provides breach advice and notification costs. The standard cyber endorsement on the RICS minimum wording excludes liability for breach of data protection law.

You dislodge materials on a site visit and a worker is injuredMay respondNot built for itBuilt for it

Injury or damage caused by your presence on site, not by your advice, is a public liability matter. PI may respond to injury or damage only where it flows from a breach of professional duty.

A visitor is injured at your officeNot built for itNot built for itBuilt for it

Liability arising from premises you own or occupy is excluded by most PI wordings and belongs under public liability. Injury to your own staff is for employers’ liability, a separate and compulsory cover.

Built for itMay respondNot built for it

Cyber cover explained: response, recovery and liability
  • Incident response. Forensic investigators and legal advice from the first call. A notifiable personal data breach must be reported to the ICO within 72 hours of becoming aware of it (ICO).
  • Restoration and interruption. Rebuilding systems and data, and the income lost while the practice cannot work.
  • Payment fraud. Some policies add cover for funds lost to fraudulent instructions, often with a lower limit and call back conditions.

PI is not silent on cyber, but the endorsement on the RICS minimum wording excludes loss directly caused by a cyber act on your own systems. If a payment has gone astray, the NCSC’s advice is to contact your bank at once using its official details (NCSC, business payment fraud).

Public and employers’ liability explained

Public liability covers injury to other people and damage to their property arising from your business activities, on site or at your office, where no professional error is involved. Client appointments and frameworks often ask for it alongside PI.

Employers’ liability is separate and compulsory once you employ anyone, with limited exemptions. The policy must cover at least £5 million, and an employer can be fined £2,500 for every day it is not properly insured (GOV.UK, employers’ liability insurance).

PI wordings usually exclude injury to employees and liability from premises you occupy, which is why these covers sit beside PI and do not overlap with it.

The other covers we arrange

Proposal form

Prefer to fill in a form?

Ask us for the appropriate proposal form, or send us your details when you request a quote.

Beyond the policy

Claims support and contract reviews

If you receive a complaint or become aware of something that could lead to a claim, email [email protected], or call 0333 222 4257 if it is urgent or sensitive. We report the matter, follow up with the insurer and explain updates. If a deadline is near, follow the notification instructions in your policy immediately. Do not admit liability before speaking to us.

Before you sign, send us the appointment, collateral warranty, third party rights schedule or reliance letter you have been asked to accept, with the contract value and a short description of your role. Highlight the wording that concerns you. We can flag insurance points to discuss with you and, where needed, your insurer. Your solicitor can advise on the legal effect. A review cannot guarantee cover for a claim.

Claims support  ·  Contract reviews

Review your cover

Let a specialist read your PI cover

Send us your current schedules, wordings, endorsements and renewal information. Tell us about your roles, your largest projects, any fire safety restriction, the warranties you have signed and anything that needs explaining. We will tell you where the cover fits your practice, where it does not, and what we would change.

Speak to a PI specialistSend us your renewalGet a quote

  • Your schedule, policy wording and endorsements
  • Renewal date and your last proposal form
  • Your fee split by service and role
  • Your largest projects, with contract values and building heights
  • Your standard terms, and any appointment or warranty awaiting signature
  • Any claims, circumstances or adjudications, with their status